Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - RUE DE GALAAD
Description: Work starting 08:00 AM on Sat 23 Mar 24 and finishing 05:00 PM on Fri 05 Apr 24 - Closure of junction to allow for UGB removal and new connections
Start date: Saturday, 23/03/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 41, N2 Cycle Access: Yes

CASTEL - RUE DES VALLEES
Description: Chamber and duct installation (370m)
Start date: Monday, 25/03/24 End date: Friday, 26/04/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Fri 31 May 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Friday, 31/05/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUETTE DES PONCHEZ ( RUE DU TORVAL to RUETTE DE TOUILLETS )
Description: Tree surgery works
Start date: Thursday, 28/03/24 End date: Thursday, 28/03/24 Timing: All Day
Promoter: Treevolution Contractor: Treevolution
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - LES PIECES LANE ( FOREST ROAD to LE CHEMIN LE ROI )
Description: Work starting 07:00 AM on Mon 04 Mar 24 and finishing 05:00 PM on Thu 28 Mar 24 - High and low voltage cabling upgrade
Start date: Monday, 04/03/24 End date: Thursday, 28/03/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - ROUTE DE PETIT BOT ( LA RUE DES CROISEE to )
Description: Tree surgery works
Start date: Monday, 25/03/24 End date: Thursday, 28/03/24 Timing: Between AM and PM Peaks
Promoter: Arbology Contractor: Arbology
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - ROUTE DE PETIT BOT; LA RUE DES CROISEE to ( LA RUE DES CROISEE to )
Description: Repair of potholes
Start date: Wednesday, 27/03/24 End date: Thursday, 28/03/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - BACK STREET
Description: Scaffolding ; Property: No 3; Purpose: Demolition / New Build
Start date: Friday, 08/03/24 End date: Tuesday, 29/10/24 Timing: Between AM and PM Peaks
Promoter: Formula Scaffolding Contractor: Formula Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE POLLET
Description: Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
Start date: Monday, 02/10/23 End date: Monday, 01/04/24 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LES COTILS
Description: Scaffolding ; Property: La Coniere; Purpose: Carry Structural Load
Start date: Monday, 11/03/24 End date: Thursday, 11/07/24 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - PRINCE ALBERT ROAD
Description: High and low voltage cabling upgrade
Start date: Monday, 11/03/24 End date: Friday, 19/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - MONT MORIN ( RUE DES MONTS to RODLEY PARK )
Description: Excavation to allow to for network upgrades
Start date: Monday, 25/03/24 End date: Monday, 22/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - ROUTE DE LA PASSEE ( RUE DES COTTES to ROUTE DES PECQUERIES )
Description: Work starting 08:00 AM on Mon 25 Mar 24 and finishing 05:00 PM on Fri 05 Apr 24 - Renew meter chambers prior to road resurfacing works
Start date: Monday, 25/03/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Guernsey Water Contractor: Guernsey Water
Bus Routes Affected: 31, 32 Cycle Access: Yes

ST. SAMPSON - RUE DE DOL ( LES EFFARDS ROAD to BAUBIGNY ROAD )
Description: Excavations for high voltage cable upgrade (Phase 2)
Start date: Monday, 25/03/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. SAVIOUR - BAS COURTILS ESTATE
Description: Work starting 07:30 AM on Mon 04 Mar 24 and finishing 04:00 PM on Thu 28 Mar 24 - Road resurfacing
Start date: Monday, 04/03/24 End date: Thursday, 28/03/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: No: Dismount

TORTEVAL - RUE DU PLANEL
Description: Work starting 08:00 AM on Fri 22 Mar 24 and finishing 05:00 PM on Fri 19 Apr 24 - Chamber and duct installation (320m)
Start date: Friday, 22/03/24 End date: Friday, 19/04/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

TORTEVAL - RUETTE DES JEHANS ( RUE DU PLANEL to RUE DES JEHANS )
Description: Work starting 07:00 AM on Mon 25 Mar 24 and finishing 05:00 PM on Mon 08 Apr 24 - Upgrade water main and services
Start date: Monday, 25/03/24 End date: Monday, 08/04/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DE L`EPINE ( DEHUS LANE to RUE DU CHARDRONNET )
Description: Work starting 06:00 PM on Fri 31 Mar 23 and finishing 11:59 PM on Fri 31 May 24 - Safety reasons pending structural investigations
Start date: Friday, 31/03/23 End date: Friday, 31/05/24 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks and Events) Contractor: Traffic and Highway Services (Roadworks and Events)
Bus Routes Affected: Cycle Access: Yes

One Ways
CASTEL - funeral
Description: One - Way for funeral access
Start date: Thursday, 28/03/24 End date: Thursday, 28/03/24 Timing: Between AM and PM Peaks
Promoter: Martels Funeral Services Contractor: N/A
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. MARTIN - LA ROUTE DES CORNUS ( LA RUE MAZE to LA PLANQUE LANE )
Description: 3 x large node splices
Start date: Monday, 25/03/24 End date: Friday, 29/03/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: 81, 91, 92, 93, 94, 95, N3 Cycle Access: Yes

ST. PETER PORT - MOUNT DURAND
Description: Scaffolding ; Property: Joywood, No 57b; Purpose: Access
Start date: Monday, 19/02/24 End date: Friday, 19/04/24 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

Signals
CASTEL - RUE DE LA SALINE
Description: Repointing of seawall at La Saline - roadside compound and working area / pedestrian footway - traffic control by temporary traffic signals.
Start date: Monday, 11/03/24 End date: Friday, 19/07/24 Timing: All Day
Promoter: Property Services Contractor: Property Services
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - LES BAISSIERES
Description: Chamber and duct instalations
Start date: Tuesday, 02/04/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 51, 52 Cycle Access: Dismount past works

GAC - Easter Festival 10k Athletics Run ( LONGREE to TRAFALGAR ROAD )
Description: GAC - Easter Festival 10k Athletics Run
Start date: Monday, 01/04/24 End date: Monday, 01/04/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Athletics Club Contractor: N/A
Bus Routes Affected: N1 13 Cycle Access: Dismount past works

ST. MARTIN - LE COURTILLET ( ROUTE DE JERBOURG to LE MONT DURAND )
Description: Work starting 07:30 AM and finishing 03:00 PM - Concrete Pour
Start date: Wednesday, 03/04/24 End date: Wednesday, 03/04/24 Timing: Between AM and PM Peaks
Promoter: Breaton Construction Contractor: Breaton Construction
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - LES MARTINS
Description: Work starting 07:00 AM on Tue 02 Apr 24 and finishing 05:00 PM on Fri 17 May 24 - High and low voltage cabling upgrade
Start date: Tuesday, 02/04/24 End date: Friday, 17/05/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - GMCCC - Hillclimb ( Castle Emplacement to Fort Road )
Description: GMCCC - Hillclimb
Start date: Monday, 01/04/24 End date: Monday, 01/04/24 Timing: All Day
Promoter: Guernsey Motorcycle and Car Club LBG Contractor: N/A
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - GREEN LANES ( COURTIL ST. JACQUES to COLLINGS ROAD )
Description: cut off gas service in road
Start date: Wednesday, 03/04/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - Guernsey Velo Club LBG - Cycling Hill Climb ( Havelet road to roundabout at top of Val De Terres )
Description: Guernsey Velo Club LBG - Cycling Hill Climb
Start date: Saturday, 30/03/24 End date: Saturday, 30/03/24 Timing: After PM Peak
Promoter: Guernsey Velo Club LBG Contractor: N/A
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - HAVELET
Description: Scaffolding ; Property: Havelet Court; Purpose: External Decoration
Start date: Tuesday, 02/04/24 End date: Thursday, 02/05/24 Timing: Between AM and PM Peaks
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE TRUCHOT
Description: Top section of Le Truchot closed daily between 7am and 4pm whilst scaffolding contractors strike scaffolding on Le Truchot side of Le Marchant House
Start date: Friday, 29/03/24 End date: Monday, 01/04/24 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LES AMBALLES ( ST. JOHN'S ROAD to LE BOUET )
Description: Tree Surgery Works
Start date: Wednesday, 03/04/24 End date: Friday, 05/04/24 Timing: Between AM and PM Peaks
Promoter: treeworks Contractor: treeworks
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES COTILS ( LES AMBALLES to BEAUREGARD LANE )
Description: road closed to cut off gas service from road
Start date: Tuesday, 02/04/24 End date: Thursday, 04/04/24 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - ST STEPHEN`S HILL ( LES GRAVEES to LES CROUTES )
Description: service alteration
Start date: Wednesday, 03/04/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE A L`EAU
Description: Work starting 07:30 AM on Tue 02 Apr 24 and finishing 04:00 PM on Fri 19 Apr 24 - Road resurfacing
Start date: Tuesday, 02/04/24 End date: Friday, 19/04/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Traffic and Highway Services (Capital Works)
Bus Routes Affected: Cycle Access: No: dismount

ST. PIERRE DU BOIS - RUE DU BORDAGE ( RUE DU COUDRE to RUE DE QUANTERAINE )
Description: Tree surgery works
Start date: Wednesday, 03/04/24 End date: Thursday, 04/04/24 Timing: Between AM and PM Peaks
Promoter: Spruce Up Contractor: Spruce Up
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - LES TRACHIERIES ESTATE
Description: Work starting 09:00 AM and finishing 03:00 PM - CCTV Camera Clean 2024
Start date: Wednesday, 03/04/24 End date: Wednesday, 03/04/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - NOCQ ROAD
Description: Work starting 09:00 AM and finishing 03:00 PM - CCTV Camera Clean 2024
Start date: Thursday, 04/04/24 End date: Thursday, 04/04/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - NOCQ ROAD; ROLAND ROAD to THE BRIDGE ( ROLAND ROAD to THE BRIDGE )
Description: Excavate and repair damaged duct
Start date: Thursday, 04/04/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - LA GRANDE RUE ( LE FRIE BATON ROAD to RUE DE ST. APPOLINE )
Description: service alteration
Start date: Tuesday, 02/04/24 End date: Thursday, 04/04/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 60, 61 Cycle Access: Dismount past works

ST. SAVIOUR - LA RUE DU CROCQ
Description: Relay 2` Asbestos burst main SELF SIGN
Start date: Tuesday, 02/04/24 End date: Friday, 04/04/25 Timing: All Day
Promoter: Guernsey Water Contractor: Tarmac Services
Bus Routes Affected: Cycle Access: Yes

VALE - LES GRIPPIOS
Description: Scaffolding ; Property: Les Grippios House; Purpose: External Decoration
Start date: Tuesday, 02/04/24 End date: Monday, 06/05/24 Timing: Between AM and PM Peaks
Promoter: Apex Scaffold Contractor: Apex Scaffold
Bus Routes Affected: Cycle Access: Yes

One Ways
ST. MARTIN - LES MERRIENNES
Description: Cable installation
Start date: Tuesday, 02/04/24 End date: Tuesday, 02/04/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: 81 Cycle Access: Yes

ST. PETER PORT - KINGS ROAD; MOUNT ROW to RUE A L'OR ( MOUNT ROW to RUE A L'OR )
Description: Work starting 08:00 AM on Wed 03 Apr 24 and finishing 04:00 PM on Fri 05 Apr 24 - CBT installation and cable splicing
Start date: Wednesday, 03/04/24 End date: Friday, 05/04/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes

VALE - Easter Festival 10K Road Race - Cotes des Amarreurs & Les Amarreurs Road ( Cotes de Amarreurs through Les Amarreurs )
Description: Easter Festival 10K Road Race - Cotes des Amarreurs and Les Amarreurs Road
Start date: Monday, 01/04/24 End date: Tuesday, 02/04/24 Timing: All Day
Promoter: Guernsey Athletics Club Contractor: N/A
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

VALE - GAC - Eastern Festival Cross Country Run ( Les Amarreurs to Donkey Divers )
Description: GAC - Eastern Festival Cross Country Run
Start date: Saturday, 30/03/24 End date: Sunday, 31/03/24 Timing: All Day
Promoter: Guernsey Athletics Club Contractor: N/A
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

Signals
ST. SAMPSON - RUE SAUVAGE
Description: Scaffolding ; Property: Courtil Quertier; Purpose: External Decoration
Start date: Tuesday, 02/04/24 End date: Thursday, 02/05/24 Timing: Between AM and PM Peaks
Promoter: Prime Scaffolding Contractor: Prime Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - VICTORIA AVENUE; to
Description: Work starting 07:00 AM on Wed 03 Apr 24 and finishing 11:59 PM on Mon 15 Apr 24 - UPGRADE SECTION OF EXISITNG WATER MAIN
Start date: Wednesday, 03/04/24 End date: Monday, 15/04/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. SAVIOUR - LA GRANDE RUE; LE FRIE BATON ROAD to RUE DE LA TERRE NORGIOT ( LE FRIE BATON ROAD to RUE DE LA TERRE NORGIOT )
Description: Repairs to house gable
Start date: Tuesday, 02/04/24 End date: Friday, 10/05/24 Timing: All Day
Promoter: Vaudin Stonemasons Contractor: Vaudin Stonemasons
Bus Routes Affected: Cycle Access: Yes