Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DE GALAAD
|
|
Description:
|
Work starting 08:00 AM on Sat 23 Mar 24 and finishing 05:00 PM on Fri 05 Apr 24 - Closure of junction to allow for UGB removal and new connections
|
Start date:
|
Saturday, 23/03/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
41, N2
|
Cycle Access:
|
Yes
|
CASTEL - RUE DES VALLEES
|
|
Description:
|
Chamber and duct installation (370m)
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Friday, 26/04/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Fri 31 May 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Friday, 31/05/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DES PONCHEZ
|
( RUE DU TORVAL to RUETTE DE TOUILLETS )
|
Description:
|
Tree surgery works
|
Start date:
|
Thursday, 28/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
All Day
|
Promoter:
|
Treevolution
|
Contractor:
|
Treevolution
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LES PIECES LANE
|
( FOREST ROAD to LE CHEMIN LE ROI )
|
Description:
|
Work starting 07:00 AM on Mon 04 Mar 24 and finishing 05:00 PM on Thu 28 Mar 24 - High and low voltage cabling upgrade
|
Start date:
|
Monday, 04/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - ROUTE DE PETIT BOT
|
( LA RUE DES CROISEE to )
|
Description:
|
Tree surgery works
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - ROUTE DE PETIT BOT; LA RUE DES CROISEE to
|
( LA RUE DES CROISEE to )
|
Description:
|
Repair of potholes
|
Start date:
|
Wednesday, 27/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BACK STREET
|
|
Description:
|
Scaffolding ; Property: No 3; Purpose: Demolition / New Build
|
Start date:
|
Friday, 08/03/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
|
Start date:
|
Monday, 02/10/23
|
End date:
|
Monday, 01/04/24
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES COTILS
|
|
Description:
|
Scaffolding ; Property: La Coniere; Purpose: Carry Structural Load
|
Start date:
|
Monday, 11/03/24
|
End date:
|
Thursday, 11/07/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - PRINCE ALBERT ROAD
|
|
Description:
|
High and low voltage cabling upgrade
|
Start date:
|
Monday, 11/03/24
|
End date:
|
Friday, 19/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - MONT MORIN
|
( RUE DES MONTS to RODLEY PARK )
|
Description:
|
Excavation to allow to for network upgrades
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Monday, 22/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE DE LA PASSEE
|
( RUE DES COTTES to ROUTE DES PECQUERIES )
|
Description:
|
Work starting 08:00 AM on Mon 25 Mar 24 and finishing 05:00 PM on Fri 05 Apr 24 - Renew meter chambers prior to road resurfacing works
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes
|
ST. SAMPSON - RUE DE DOL
|
( LES EFFARDS ROAD to BAUBIGNY ROAD )
|
Description:
|
Excavations for high voltage cable upgrade (Phase 2)
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. SAVIOUR - BAS COURTILS ESTATE
|
|
Description:
|
Work starting 07:30 AM on Mon 04 Mar 24 and finishing 04:00 PM on Thu 28 Mar 24 - Road resurfacing
|
Start date:
|
Monday, 04/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Dismount
|
TORTEVAL - RUE DU PLANEL
|
|
Description:
|
Work starting 08:00 AM on Fri 22 Mar 24 and finishing 05:00 PM on Fri 19 Apr 24 - Chamber and duct installation (320m)
|
Start date:
|
Friday, 22/03/24
|
End date:
|
Friday, 19/04/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - RUETTE DES JEHANS
|
( RUE DU PLANEL to RUE DES JEHANS )
|
Description:
|
Work starting 07:00 AM on Mon 25 Mar 24 and finishing 05:00 PM on Mon 08 Apr 24 - Upgrade water main and services
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Monday, 08/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DE L`EPINE
|
( DEHUS LANE to RUE DU CHARDRONNET )
|
Description:
|
Work starting 06:00 PM on Fri 31 Mar 23 and finishing 11:59 PM on Fri 31 May 24 - Safety reasons pending structural investigations
|
Start date:
|
Friday, 31/03/23
|
End date:
|
Friday, 31/05/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
Traffic and Highway Services (Roadworks and Events)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - funeral
|
|
Description:
|
One - Way for funeral access
|
Start date:
|
Thursday, 28/03/24
|
End date:
|
Thursday, 28/03/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Martels Funeral Services
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. MARTIN - LA ROUTE DES CORNUS
|
( LA RUE MAZE to LA PLANQUE LANE )
|
Description:
|
3 x large node splices
|
Start date:
|
Monday, 25/03/24
|
End date:
|
Friday, 29/03/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
81, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - MOUNT DURAND
|
|
Description:
|
Scaffolding ; Property: Joywood, No 57b; Purpose: Access
|
Start date:
|
Monday, 19/02/24
|
End date:
|
Friday, 19/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DE LA SALINE
|
|
Description:
|
Repointing of seawall at La Saline - roadside compound and working area / pedestrian footway - traffic control by temporary traffic signals.
|
Start date:
|
Monday, 11/03/24
|
End date:
|
Friday, 19/07/24
|
Timing:
All Day
|
Promoter:
|
Property Services
|
Contractor:
|
Property Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - LES BAISSIERES
|
|
Description:
|
Chamber and duct instalations
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Dismount past works
|
GAC - Easter Festival 10k Athletics Run
|
( LONGREE to TRAFALGAR ROAD )
|
Description:
|
GAC - Easter Festival 10k Athletics Run
|
Start date:
|
Monday, 01/04/24
|
End date:
|
Monday, 01/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
N1 13
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LE COURTILLET
|
( ROUTE DE JERBOURG to LE MONT DURAND )
|
Description:
|
Work starting 07:30 AM and finishing 03:00 PM - Concrete Pour
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Wednesday, 03/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Breaton Construction
|
Contractor:
|
Breaton Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES MARTINS
|
|
Description:
|
Work starting 07:00 AM on Tue 02 Apr 24 and finishing 05:00 PM on Fri 17 May 24 - High and low voltage cabling upgrade
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Friday, 17/05/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - GMCCC - Hillclimb
|
( Castle Emplacement to Fort Road )
|
Description:
|
GMCCC - Hillclimb
|
Start date:
|
Monday, 01/04/24
|
End date:
|
Monday, 01/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Motorcycle and Car Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - GREEN LANES
|
( COURTIL ST. JACQUES to COLLINGS ROAD )
|
Description:
|
cut off gas service in road
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - Guernsey Velo Club LBG - Cycling Hill Climb
|
( Havelet road to roundabout at top of Val De Terres )
|
Description:
|
Guernsey Velo Club LBG - Cycling Hill Climb
|
Start date:
|
Saturday, 30/03/24
|
End date:
|
Saturday, 30/03/24
|
Timing:
After PM Peak
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - HAVELET
|
|
Description:
|
Scaffolding ; Property: Havelet Court; Purpose: External Decoration
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Thursday, 02/05/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE TRUCHOT
|
|
Description:
|
Top section of Le Truchot closed daily between 7am and 4pm whilst scaffolding contractors strike scaffolding on Le Truchot side of Le Marchant House
|
Start date:
|
Friday, 29/03/24
|
End date:
|
Monday, 01/04/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES AMBALLES
|
( ST. JOHN'S ROAD to LE BOUET )
|
Description:
|
Tree Surgery Works
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
treeworks
|
Contractor:
|
treeworks
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES COTILS
|
( LES AMBALLES to BEAUREGARD LANE )
|
Description:
|
road closed to cut off gas service from road
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Thursday, 04/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - ST STEPHEN`S HILL
|
( LES GRAVEES to LES CROUTES )
|
Description:
|
service alteration
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE A L`EAU
|
|
Description:
|
Work starting 07:30 AM on Tue 02 Apr 24 and finishing 04:00 PM on Fri 19 Apr 24 - Road resurfacing
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Friday, 19/04/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. PIERRE DU BOIS - RUE DU BORDAGE
|
( RUE DU COUDRE to RUE DE QUANTERAINE )
|
Description:
|
Tree surgery works
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Thursday, 04/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Spruce Up
|
Contractor:
|
Spruce Up
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LES TRACHIERIES ESTATE
|
|
Description:
|
Work starting 09:00 AM and finishing 03:00 PM - CCTV Camera Clean 2024
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Wednesday, 03/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAMPSON - NOCQ ROAD
|
|
Description:
|
Work starting 09:00 AM and finishing 03:00 PM - CCTV Camera Clean 2024
|
Start date:
|
Thursday, 04/04/24
|
End date:
|
Thursday, 04/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - NOCQ ROAD; ROLAND ROAD to THE BRIDGE
|
( ROLAND ROAD to THE BRIDGE )
|
Description:
|
Excavate and repair damaged duct
|
Start date:
|
Thursday, 04/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE RUE
|
( LE FRIE BATON ROAD to RUE DE ST. APPOLINE )
|
Description:
|
service alteration
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Thursday, 04/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA RUE DU CROCQ
|
|
Description:
|
Relay 2` Asbestos burst main SELF SIGN
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Friday, 04/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LES GRIPPIOS
|
|
Description:
|
Scaffolding ; Property: Les Grippios House; Purpose: External Decoration
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Monday, 06/05/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Apex Scaffold
|
Contractor:
|
Apex Scaffold
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES MERRIENNES
|
|
Description:
|
Cable installation
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Tuesday, 02/04/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. PETER PORT - KINGS ROAD; MOUNT ROW to RUE A L'OR
|
( MOUNT ROW to RUE A L'OR )
|
Description:
|
Work starting 08:00 AM on Wed 03 Apr 24 and finishing 04:00 PM on Fri 05 Apr 24 - CBT installation and cable splicing
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Friday, 05/04/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - Easter Festival 10K Road Race - Cotes des Amarreurs & Les Amarreurs Road
|
( Cotes de Amarreurs through Les Amarreurs )
|
Description:
|
Easter Festival 10K Road Race - Cotes des Amarreurs and Les Amarreurs Road
|
Start date:
|
Monday, 01/04/24
|
End date:
|
Tuesday, 02/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
VALE - GAC - Eastern Festival Cross Country Run
|
( Les Amarreurs to Donkey Divers )
|
Description:
|
GAC - Eastern Festival Cross Country Run
|
Start date:
|
Saturday, 30/03/24
|
End date:
|
Sunday, 31/03/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. SAMPSON - RUE SAUVAGE
|
|
Description:
|
Scaffolding ; Property: Courtil Quertier; Purpose: External Decoration
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Thursday, 02/05/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Prime Scaffolding
|
Contractor:
|
Prime Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - VICTORIA AVENUE; to
|
|
Description:
|
Work starting 07:00 AM on Wed 03 Apr 24 and finishing 11:59 PM on Mon 15 Apr 24 - UPGRADE SECTION OF EXISITNG WATER MAIN
|
Start date:
|
Wednesday, 03/04/24
|
End date:
|
Monday, 15/04/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - LA GRANDE RUE; LE FRIE BATON ROAD to RUE DE LA TERRE NORGIOT
|
( LE FRIE BATON ROAD to RUE DE LA TERRE NORGIOT )
|
Description:
|
Repairs to house gable
|
Start date:
|
Tuesday, 02/04/24
|
End date:
|
Friday, 10/05/24
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|