Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DU PRESBYTERE
|
|
Description:
|
Install water main
|
Start date:
|
Monday, 11/11/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
P2, 51
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - ST. SAVIOUR - ROUTE DE LA PERELLE
|
|
Description:
|
Road and wall repairs
|
Start date:
|
Thursday, 14/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
60, 61, 91, 92
|
Cycle Access:
|
Yes
|
FOREST - LES REBOUQUETS
|
|
Description:
|
Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 20 Dec 24 - High and low voltage cable upgrade and duct lay
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. ANDREW - LA VILLIAZE ROAD
|
|
Description:
|
Work starting 08:00 AM on Mon 18 Nov 24 and finishing 04:00 PM on Fri 22 Nov 24 - Chamber and duct installations
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BOUILLON LANE
|
( ST. GEORGE'S ESPLANADE to LE BOUET )
|
Description:
|
Excavate blocked duct
|
Start date:
|
Thursday, 21/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
|
Start date:
|
Tuesday, 01/10/24
|
End date:
|
Friday, 17/01/25
|
Timing:
All Day
|
Promoter:
|
Bob Froome and Sons
|
Contractor:
|
Bob Froome and Sons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Rebuild roadside wall
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPPER MANSELL STREET
|
( PARK STREET to TRINITY SQUARE )
|
Description:
|
Replacement supply line.
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Sat 15 Mar 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Saturday, 15/03/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DES PRES
|
( RUE DES RAIES to RUE DES LANDES )
|
Description:
|
Work starting 07:00 AM on Mon 18 Nov 24 and finishing 04:00 PM on Fri 22 Nov 24 - Tree felling
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - BROCK ROAD
|
( RONDE CHEMINEE to NEW ROAD )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Stoneworks Ltd
|
Contractor:
|
Stoneworks Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LES MARTINS
|
|
Description:
|
Low voltage cable upgrade
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE CARRE
|
|
Description:
|
Work starting 07:00 AM on Sat 26 Oct 24 and finishing 03:00 PM on Fri 22 Nov 24 - Distribution pillar installation and low voltage cabling upgrade
|
Start date:
|
Saturday, 26/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE CARRE; SANDY HOOK to BRAYE DU VALLE
|
( SANDY HOOK to BRAYE DU VALLE )
|
Description:
|
Work starting 08:30 AM on Thu 21 Nov 24 and finishing 04:30 PM on Sun 24 Nov 24 - Install new water supply
|
Start date:
|
Thursday, 21/11/24
|
End date:
|
Sunday, 24/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA BILOTERIE ROAD
|
( RUE DU CAMP DU DOUIT to RUE DES HURIAUX )
|
Description:
|
Chamber installation
|
Start date:
|
Wednesday, 20/11/24
|
End date:
|
Thursday, 21/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - ROUTE DES DOMAINES
|
( RUE DU DOUIT MANCHOT to LES ROBERTS )
|
Description:
|
Work starting 08:00 AM on Thu 21 Nov 24 and finishing 11:00 PM on Tue 26 Nov 24 - Chamber and duct installation
|
Start date:
|
Thursday, 21/11/24
|
End date:
|
Tuesday, 26/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES ISSUES
|
|
Description:
|
Work starting 08:00 AM on Mon 18 Nov 24 and finishing 11:00 PM on Thu 21 Nov 24 - Chamber installations
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Thursday, 21/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DU LORIER
|
( to ROUTE DES CLOS LANDAIS )
|
Description:
|
Supply line upgrade
|
Start date:
|
Wednesday, 20/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - CARRIERE LANE
|
( to LA ROUTE DU BRAYE )
|
Description:
|
Low voltage cabling upgrade and new connections
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Wednesday, 18/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - PORT SOIF LANE
|
( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
|
Description:
|
Road reconstruction and resurfacing
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Work starting 07:00 AM on Mon 23 Sep 24 and finishing 05:00 PM on Mon 30 Dec 24 - For construction of 3 flats
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Monday, 30/12/24
|
Timing:
All Day
|
Promoter:
|
Just Build It Ltd
|
Contractor:
|
Just Build It Ltd
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - RUE DES ETURS; RUE DU PREEL to RUE DES DESLISLES
|
( RUE DU PREEL to RUE DES DESLISLES )
|
Description:
|
Work starting 08:00 AM on Wed 30 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - Duct and chamber installations
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LA GRANDE RUE; LA BELLIEUSE to LES MERRIENNES
|
( LA BELLIEUSE to LES MERRIENNES )
|
Description:
|
Work starting 07:30 AM and finishing 05:00 PM daily between Mon 18 Nov 24 and Fri 22 Nov 24 - Skips and concrete deliveries.
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
P and J Ogier (1991) Ltd
|
Contractor:
|
P and J Ogier (1991) Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE GRAND BOUET; HOUGUE A LA PERRE to RUE DE CHATEAU
|
( HOUGUE A LA PERRE to RUE DE CHATEAU )
|
Description:
|
Cut off service in footpath
|
Start date:
|
Wednesday, 20/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DES GODDARDS
|
( VAZON ROAD to ROUTE DE LA MARE )
|
Description:
|
service alterations
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
Emergency Activity - ST. PIERRE DU BOIS - ROUTE DE LA LAGUE
|
|
Description:
|
Repairs to defective bitmac around chamber lids
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Saturday, 23/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
61, 71, 91, 92, 93, 94, N3
|
Cycle Access:
|
No
|
FOREST - LA RUE DES CROISEE
|
( LES MESSURIERS to LE BOURG )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUETTE DU NAVET
|
( ICART ROAD to SAINTS BAY ROAD )
|
Description:
|
Chamber installation
|
Start date:
|
Tuesday, 26/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUETTE DU NAVET
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CAMPS DU MOULIN
|
( VILLE AMPHREY to RUETTE RABEY )
|
Description:
|
Road surface patch repairs
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CAMPS DU MOULIN
|
( RUE JACQUES GUILLE to RUE DE LA VALLEE )
|
Description:
|
Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Install new water services
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CAMPS DU MOULIN
|
|
Description:
|
Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Replace access cover on Camps du Moulin
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES FRIETEAUX
|
|
Description:
|
Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 29 Nov 24 - Replacements of streetlights
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE CHARIOT
|
|
Description:
|
Work starting 09:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Tue 26 Nov 24 - Duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Tuesday, 26/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX
|
( RUE CAUCHEZ to LES FRIETEAUX )
|
Description:
|
Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Replace 2 x failing chamber covers
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX
|
( RUE CAUCHEZ to LES FRIETEAUX )
|
Description:
|
Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Repair failed reinstatements around water meters
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. PETER PORT - COLBORNE ROAD
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - NEW PLACE
|
( VICTORIA ROAD to VAUVERT )
|
Description:
|
Erecting scaffolding.
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Thursday, 12/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - RUE A L`OR
|
( RICHMOND AVENUE to KINGS ROAD )
|
Description:
|
Rue a L`Or substation installation and high voltage cable upgrade (Phase 1)
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VALNORD LANE
|
|
Description:
|
Tree Surgery Works
|
Start date:
|
Tuesday, 26/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES SAGES
|
|
Description:
|
Work starting 07:30 AM on Mon 25 Nov 24 and finishing 04:00 PM on Fri 13 Dec 24 - Road resurfacing
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
61
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
Painting gable of house.
|
Start date:
|
Thursday, 28/11/24
|
End date:
|
Thursday, 28/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Event Hire Guernsey Ltd
|
Contractor:
|
Event Hire Guernsey Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DES MARCHEZ
|
( RUE DES REINES to RUE DES HECHES )
|
Description:
|
Tree surgery works.
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 25/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DU VIDECOCQ
|
( RUE DES MARES to RUE DES REINES )
|
Description:
|
Tree surgery works.
|
Start date:
|
Thursday, 28/11/24
|
End date:
|
Thursday, 28/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arborcraft Ltd
|
Contractor:
|
Arborcraft Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE ST PIERRE
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - COMMERCIAL ROAD
|
( NOCQ ROAD to THE BRIDGE )
|
Description:
|
Work starting 09:00 AM and finishing 01:00 PM - CCTV Camera Clean
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - ROUTE CARRE
|
( SANDY HOOK to BRAYE DU VALLE )
|
Description:
|
Upgrade existing foul sewer connection
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE CARRE
|
( SANDY HOOK to BRAYE DU VALLE )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE LANDE
|
( RUE DES LOHIERS to RUE DES RIGNEAUX )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 27/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE LANDE
|
( RUE DES LOHIERS to RUE DES RIGNEAUX )
|
Description:
|
new supply line
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE LANDE
|
( RUE DES LOHIERS to RUE DES RIGNEAUX )
|
Description:
|
Supply line upgrade
|
Start date:
|
Thursday, 28/11/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE RUE
|
|
Description:
|
Work starting 09:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Mon 25 Nov 24 - tree surgery
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 25/11/24
|
Timing:
All Day
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES LONGS CAMPS
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - Guernsey Velo Club Cyclocross - Road Closure
|
|
Description:
|
Guernsey Velo Club Cyclocross - Road Closure & Parking Suspended
|
Start date:
|
Sunday, 24/11/24
|
End date:
|
Sunday, 24/11/24
|
Timing:
Before AM Peak
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - COURTIL DE LA LANDE
|
|
Description:
|
New supply line
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Thursday, 28/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA RUE DU PASSEUR
|
( LES HAUTES LANDES to LES MIELLES ROAD )
|
Description:
|
CCTV Camera Cleans
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 25/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
11, 12, N1
|
Cycle Access:
|
Yes
|
VALE - RUE DU MARAIS
|
( ROCQUE BALAN LANE to LES MIELLES ROAD )
|
Description:
|
supply line upgrade
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - Funeral at Matthews Church
|
|
Description:
|
One - Way for funeral access for a Funeral at Matthews Church
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Friday, 22/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Beckfords Funeral Services Ltd
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PETER PORT - ST. JAMES STREET
|
( COLLEGE STREET to GRANGE ROAD )
|
Description:
|
Erecting scaffolding.
|
Start date:
|
Saturday, 23/11/24
|
End date:
|
Sunday, 24/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DU BRAYE; LES MARES PELLEES to SOHIER ROAD
|
( LES MARES PELLEES to SOHIER ROAD )
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 25 Nov 24 and Wed 11 Dec 24 - Rebuilding roadside wall.
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 11/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
meervelds
|
Contractor:
|
meervelds
|
Bus Routes Affected:
|
|
Cycle Access:
|