Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - LA NEUVE RUE
|
|
Description:
|
Work starting 07:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Mon 18 Nov 24 - Upgrade foul water manhole
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Monday, 18/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 51, 52
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE ST. BRIOCQ
|
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 08/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
No: dismount
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LES REBOUQUETS
|
|
Description:
|
Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - High and low voltage cable upgrade and duct lay
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
FOREST - RUE DE LA CORBIERE
|
( to LA RUE DE MANOIR COTE SUD )
|
Description:
|
Work starting 08:00 AM on Wed 30 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Chamber installation
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES BLANCHES PIERRES
|
|
Description:
|
Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
|
Start date:
|
Tuesday, 01/10/24
|
End date:
|
Friday, 17/01/25
|
Timing:
All Day
|
Promoter:
|
Bob Froome and Sons
|
Contractor:
|
Bob Froome and Sons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - QUEENS ROAD
|
( BELMONT ROAD to MOUNT ROW )
|
Description:
|
Work starting 07:00 AM on Wed 30 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - service alteration
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
60, 61, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - QUEENS ROAD
|
( BELMONT ROAD to MOUNT ROW )
|
Description:
|
Excavate on gas main opposite Queens Lodge, Queens Road, St. Peter Port,GY1 1PU.
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
60, 61, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - SAUSMAREZ STREET
|
( CLIFTON to UNION STREET )
|
Description:
|
service alteration
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPLAND ROAD
|
|
Description:
|
Urgent window repairs to 1 Grange Place. ; Property: 1 grange; Purpose: Installation
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Thursday, 19/12/24
|
Timing:
All Day
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 15 Nov 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - ROUTE DE PLAISANCE
|
|
Description:
|
Work starting 07:30 AM on Mon 21 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Road resurfacing and patch repairs.
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
71, 93, 94, N3
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - ROUTE DE ROCQUAINE
|
( RUE DE L'ISSUE to RUE DU DOUIT DU MOULIN )
|
Description:
|
service alteration
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Thursday, 31/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61, 71, 91, 92, 93, 94, N3
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE CARRE
|
|
Description:
|
Work starting 07:00 AM on Sat 26 Oct 24 and finishing 05:00 PM on Fri 29 Nov 24 - Distribution pillar installation and low voltage cabling upgrade
|
Start date:
|
Saturday, 26/10/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE DU CAMP DU ROI
|
( RUE DES ANNEVILLES to LES ABREUVEURS ROAD )
|
Description:
|
Work starting 08:00 AM on Tue 29 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber installation, cable installation and splicing
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE LANDE
|
( RUE DES LOHIERS to RUE DES RIGNEAUX )
|
Description:
|
Crane Lift.
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Verdellis Construction
|
Contractor:
|
Verdellis Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES LOHIERS
|
|
Description:
|
Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Tue 05 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Tuesday, 05/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - BELVAL ROAD
|
( ROUTE DES COUTURES to VILLE ES PIES )
|
Description:
|
Work starting 08:00 AM on Mon 28 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE GODFREY
|
|
Description:
|
Install new section of water main
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Monday, 11/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RETOT; LA GIFFARDIERE to LES QUERITES
|
( LA GIFFARDIERE to LES QUERITES )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Island Formwork and Construction Ltd
|
Contractor:
|
Island Formwork and Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - COBO COAST ROAD
|
( ROUTE DE COBO to ROUTE DE CARTERET )
|
Description:
|
Rebuilding of boundary wall
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Sunday, 17/11/24
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DES ETURS; RUE DU PREEL to RUE DES DESLISLES
|
( RUE DU PREEL to RUE DES DESLISLES )
|
Description:
|
Work starting 08:00 AM on Wed 30 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - Duct and chamber installations
|
Start date:
|
Wednesday, 30/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - ROUTE DE PORT GRAT; ROUTE DE PULIAS to LES DICQS
|
( ROUTE DE PULIAS to LES DICQS )
|
Description:
|
Rebuilding roadside wall.
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Saturday, 16/11/24
|
Timing:
All Day
|
Promoter:
|
Another Level Ltd
|
Contractor:
|
Another Level Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
CASTEL - RUETTE DU VILLOCQ; RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ
|
( RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ )
|
Description:
|
supply line alteration
|
Start date:
|
Tuesday, 05/11/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - RUE DES TRUCHOTS
|
( to ROUTE DES FAUCONNAIRES )
|
Description:
|
Access UG Network
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LA ROUTE DES CORNUS
|
|
Description:
|
Supply line upgrade
|
Start date:
|
Tuesday, 05/11/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
81, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - STEAM MILL LANE
|
( to DOUIT DE LA PORTE )
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM daily between Wed 06 Nov 24 and Fri 08 Nov 24 - Cable splicing
|
Start date:
|
Wednesday, 06/11/24
|
End date:
|
Friday, 08/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - CANDIE ROAD
|
( UPLAND ROAD to ST. JULIAN'S AVENUE )
|
Description:
|
Tree surgery works.
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Monday, 04/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - COLBORNE ROAD TRIANGLE
|
|
Description:
|
Fibre duct pull
|
Start date:
|
Saturday, 02/11/24
|
End date:
|
Sunday, 03/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - KINGS ROAD
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Tuesday, 05/11/24
|
Timing:
Before AM Peak
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - MANSELL STREET
|
|
Description:
|
Scaffolding ; Property: No 7, Mansell Street; Purpose: Other (see Details)
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Monday, 21/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - SAUSMAREZ STREET; NORTH CLIFTON to GRANGE ROAD
|
( NORTH CLIFTON to GRANGE ROAD )
|
Description:
|
Work starting 07:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Thu 07 Nov 24 - Install new water services
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Smile for Georgie Foundation - Trick or Treat
|
|
Description:
|
Smile for Georgie Foundation - Trick or Treat
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Thursday, 31/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Smile for Georgie Foundation
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - St Peter Port Constables - Halloween Event
|
|
Description:
|
St Peter Port Constables - Halloween Event
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Thursday, 31/10/24
|
Timing:
After PM Peak
|
Promoter:
|
Constables of St Peter Port
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Town Church Square / Market Hill / Quay Street
|
|
Description:
|
Erection of Christmas Lights
|
Start date:
|
Sunday, 03/11/24
|
End date:
|
Sunday, 03/11/24
|
Timing:
All Day
|
Promoter:
|
Event Hire Guernsey Ltd
|
Contractor:
|
Event Hire Guernsey Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - VICTORIA ROAD
|
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VICTORIA ROAD
|
( VALNORD ROAD to MOUNT HERMON )
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES ADAMS
|
( RUE ROCHEUSE to ROUTE DU FELCONTE )
|
Description:
|
service alteration
|
Start date:
|
Wednesday, 06/11/24
|
End date:
|
Friday, 08/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61, 71, 93, 94, N3
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES LANDES
|
( RUE DES RONDIAUX to RUE DES PRES )
|
Description:
|
Work starting 07:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Mon 11 Nov 24 - Drainage works
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Monday, 11/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LES MARTINS
|
|
Description:
|
Low voltage cable upgrade
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - RONDE CHEMINEE
|
( to BROCK ROAD )
|
Description:
|
Roadside wall repairs.
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 15/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Stoneworks Ltd
|
Contractor:
|
Stoneworks Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAVIOUR - LES RUETTES
|
( RUE DES MEREZ to RUE DU GRON )
|
Description:
|
Drainage works
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Traffic and Highway Services (Highways Inspector)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - ROUTE DES BAS COURTILS
|
( RUE DU GRON to RUE DES LONGS CAMPS )
|
Description:
|
Work starting 07:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Fri 15 Nov 24 - Chamber installations x 7
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - ROUTE DES ROUVETS
|
( LA GRANDE RUE to RUE DE LA HOUGUE BACHELE )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
Dismount past works
|
VALE - CARRIERE LANE
|
( to LA ROUTE DU BRAYE )
|
Description:
|
Install new foul sewer
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Monday, 18/11/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA RUE DE LA MARAIVE
|
( ROCQUE ES ROUSSEE to LA ROUTE DE LA LANDE )
|
Description:
|
Supply line upgrade
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Tuesday, 05/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - PORT SOIF LANE
|
( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
|
Description:
|
Road reconstruction and resurfacing
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
VALE - ROUTE DE LA CHARRUEE
|
( RUE COHU to PRIVATE ROAD )
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
41, 42, N2
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DES HAIZES
|
( SOHIER ROAD to ROSELAND LANE )
|
Description:
|
new supply line
|
Start date:
|
Thursday, 31/10/24
|
End date:
|
Tuesday, 05/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DES LANDES
|
( LA CANURIE ROAD to LA HOUGUE )
|
Description:
|
Supply line upgrade
|
Start date:
|
Wednesday, 06/11/24
|
End date:
|
Friday, 08/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - Guernsey Rugby Club LBG - Firework Display
|
( Rue Des Varendes to Les Baissiers )
|
Description:
|
Guernsey Rugby Club LBG - Firework Display
|
Start date:
|
Sunday, 03/11/24
|
End date:
|
Sunday, 03/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Rugby Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - AVENUE DU MANOIR
|
|
Description:
|
Locate and excavate duct blockage
|
Start date:
|
Wednesday, 06/11/24
|
End date:
|
Friday, 08/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - GRANGE ROAD
|
|
Description:
|
Scaffolding erection
|
Start date:
|
Friday, 01/11/24
|
End date:
|
Tuesday, 05/11/24
|
Timing:
All Day
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
Bus Routes Affected:
|
31, 41, 42, 51, 52, 60, 61, 71, 81, N2
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PETER PORT - LES GRAVEES
|
( ST STEPHEN'S HILL to LES GRAVEES DU SUD )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
41, 42, 51, 52, N2
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES GRAVEES
|
|
Description:
|
Work starting 09:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Wed 06 Nov 24 - CUT OFF SERVICE ON MAIN IN ROAD
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
41, 42, 51, 52, N2
|
Cycle Access:
|
Yes
|
VALE - Guernsey Scout Group - Bonfire Night
|
( LES ROUVETS ROAD to LE ROCHER LANE )
|
Description:
|
Guernsey Scout Group - Bonfire Night
|
Start date:
|
Tuesday, 05/11/24
|
End date:
|
Wednesday, 06/11/24
|
Timing:
All Day
|
Promoter:
|
Bailiwick of Guernsey Scouts
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. ANDREW - ROUTE DE ST ANDRE (LE BOUILLON ROAD)
|
|
Description:
|
Cable splicing
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Monday, 04/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - CASTLE ROAD; NORTH SIDE to RUE DES BARRAS
|
( NORTH SIDE to RUE DES BARRAS )
|
Description:
|
Work starting 08:00 AM on Fri 01 Nov 24 and finishing 05:00 PM on Fri 01 Nov 24 - Repair to cover
|
Start date:
|
Friday, 01/11/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|