Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - RUE DE LA MASSE
Description: High voltage cable upgrade
Start date: Monday, 22/07/24 End date: Tuesday, 03/09/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Mon 30 Sep 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Monday, 30/09/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - LA QUERRIERE
Description: Scaffolding; Property: De Bertrands ; Purpose: Access
Start date: Thursday, 27/06/24 End date: Tuesday, 20/08/24 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - LONG TRAC
Description: Work starting 12:00 AM on Mon 08 Jul 24 and finishing 05:00 PM on Fri 09 Aug 24 - Low voltage cable upgrade
Start date: Monday, 08/07/24 End date: Friday, 09/08/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - RUE DE VARIVARY ( STEAM MILL LANE to LES HUBITS )
Description: Work starting 07:00 AM on Fri 26 Jul 24 and finishing 05:00 PM on Mon 29 Jul 24 - service alteration
Start date: Friday, 26/07/24 End date: Monday, 29/07/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - BACK STREET
Description: Scaffolding ; Property: No 3; Purpose: Demolition / New Build
Start date: Friday, 08/03/24 End date: Tuesday, 29/10/24 Timing: Between AM and PM Peaks
Promoter: Formula Scaffolding Contractor: Formula Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - CLIFF STREET ( LOWER HAUTEVILLE to THE STRAND )
Description: Removal of scaffolding
Start date: Friday, 26/07/24 End date: Saturday, 27/07/24 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - DOYLE ROAD ( BROCK ROAD to GRANGE ROAD )
Description: Work starting 08:00 AM on Wed 15 May 24 and finishing 05:00 PM on Wed 30 Oct 24 - Low voltage network upgrade, pillar installation and high voltage duct lay
Start date: Wednesday, 15/05/24 End date: Wednesday, 30/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 32 Cycle Access: Dismount past works

ST. PETER PORT - LE POLLET
Description: Work starting 10:00 AM on Mon 02 Oct 23 and finishing 04:00 PM on Mon 30 Sep 24 - Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
Start date: Monday, 02/10/23 End date: Monday, 30/09/24 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - MANSELL STREET
Description: Scaffolding for roofing works; Property: 4 Mansell St (Art for Guernsey); Purpose: Roofing Works
Start date: Monday, 08/07/24 End date: Monday, 29/07/24 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - MOUNT ROW
Description: Work starting 07:00 AM on Sat 27 Jul 24 and finishing 05:00 PM on Thu 08 Aug 24 - High and low voltage cable upgrade
Start date: Saturday, 27/07/24 End date: Thursday, 08/08/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: 60, 61, 71, 81 Cycle Access: Dismount past works

ST. PETER PORT - MOUNT ROW
Description: Work starting 07:00 AM on Mon 10 Jun 24 and finishing 05:00 PM on Fri 20 Sep 24 - High and low voltage infrastructure upgrade
Start date: Monday, 10/06/24 End date: Friday, 20/09/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: P2, 60, 61, 71 Cycle Access: Dismount past works

ST. PETER PORT - ROSAIRE AVENUE ( BROCK ROAD to DALGAIRNS ROAD )
Description: Work starting 07:00 AM on Fri 26 Jul 24 and finishing 11:59 PM on Wed 31 Jul 24 - Install new services
Start date: Friday, 26/07/24 End date: Wednesday, 31/07/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffolding ; Property: La Coquere; Purpose: Demolition / New Build
Start date: Monday, 22/04/24 End date: Saturday, 31/08/24 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
Start date: Wednesday, 10/07/24 End date: Saturday, 12/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UPLAND ROAD
Description: Work starting 07:00 AM on Sat 06 Jul 24 and finishing 05:00 PM on Mon 12 Aug 24 - Upgrade water main and services
Start date: Saturday, 06/07/24 End date: Monday, 12/08/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DES BREHAUTS
Description: Work starting 08:00 AM on Mon 22 Jul 24 and finishing 11:59 PM on Fri 09 Aug 24 - Chamber and duct installations
Start date: Monday, 22/07/24 End date: Friday, 09/08/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 61 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DES HECHES
Description: Work starting 08:00 AM on Mon 22 Jul 24 and finishing 04:00 PM on Fri 02 Aug 24 - Chamber and duct installation
Start date: Monday, 22/07/24 End date: Friday, 02/08/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DU DOUIT DU MOULIN
Description: Completion of surfacing works earlier this year that were postponed due to excessive ground water
Start date: Monday, 22/07/24 End date: Friday, 02/08/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - LES SALINES ROAD
Description: Work starting 08:00 AM on Fri 19 Jul 24 and finishing 05:00 PM on Mon 19 Aug 24 - Chamber and duct installation
Start date: Friday, 19/07/24 End date: Monday, 19/08/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - ROUTE MILITAIRE
Description: Install new foul sewer and services
Start date: Monday, 15/07/24 End date: Sunday, 28/07/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: 21 Cycle Access: Dismount past works

ST. SAMPSON - RUE DES POINTUES ROCQUES ( ROUTE ST. CLAIR to RUE DES MONTS )
Description: Road closure to erect scaffolding
Start date: Monday, 22/07/24 End date: Monday, 12/08/24 Timing: All Day
Promoter: Elevations Contractor: Elevations
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - RUE DU MONT SAINT ( RUE DES HURIAUX to LE MONT SAINT )
Description: Work starting 07:00 AM on Thu 16 May 24 and finishing 05:00 PM on Mon 23 Sep 24 - Site compound
Start date: Thursday, 16/05/24 End date: Monday, 23/09/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - PORT SOIF LANE ( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
Description: Work starting 07:00 AM on Mon 15 Jul 24 and finishing 05:00 PM on Mon 05 Aug 24 - Foul water sewer upgrade works
Start date: Monday, 15/07/24 End date: Monday, 05/08/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 41 Cycle Access: Dismount past works

VALE - RUE DU PONT VAILLANT; VERTE RUE to PONT VAILLANT ESTATE ( VERTE RUE to PONT VAILLANT ESTATE )
Description: Install new water service
Start date: Friday, 26/07/24 End date: Monday, 29/07/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
No current major delays due to one ways
Signals
CASTEL - RUE COHU; ROUTE DE SAUMAREZ to RUE DU FRIQUET ( ROUTE DE SAUMAREZ to RUE DU FRIQUET )
Description: Repair Road side wall
Start date: Monday, 22/07/24 End date: Sunday, 28/07/24 Timing: All Day
Promoter: Keystone Masonry Contractor: Keystone Masonry
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUE DE LA SALINE
Description: Work starting 08:00 AM on Mon 11 Mar 24 and finishing 05:00 PM on Sun 11 Aug 24 - Repointing of seawall at La Saline - roadside compound and working area / pedestrian footway - traffic control by temporary traffic signals.
Start date: Monday, 11/03/24 End date: Sunday, 11/08/24 Timing: All Day
Promoter: Property Services Contractor: Property Services
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - GRANGE ROAD
Description: Repair failed manhole cover
Start date: Saturday, 27/07/24 End date: Sunday, 28/07/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - VAUVERT; NEW PLACE to GEORGE STREET ( NEW PLACE to GEORGE STREET )
Description: Specialist team from UK to carry out seek and repair on 18 inch gas main, as opposed to digging on main junction at Victoria Road. Excavation for camera insert outside No; 11, Maison De Ville Apartments, Vauvert. Signal lights and signage to control traffic.
Start date: Thursday, 25/07/24 End date: Thursday, 01/08/24 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - ROUTE DE CARTERET ( RUE DE BOUVERIE to LES GENATS ESTATE )
Description: Road closure due to Tree work
Start date: Tuesday, 30/07/24 End date: Tuesday, 30/07/24 Timing: Between AM and PM Peaks
Promoter: Arbology Contractor: Arbology
Bus Routes Affected: 42 Cycle Access: Dismount past works

CASTEL - RUE DE LA PERRUQUE ( RUE DES CAUVAINS to LES VIEUX BEAUCAMPS )
Description: Cable splicing
Start date: Tuesday, 30/07/24 End date: Wednesday, 31/07/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUETTE DES EFFARDS ( QUEUX LANE to LES LANDELLES )
Description: Cable splicing
Start date: Thursday, 01/08/24 End date: Friday, 02/08/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

EADBL Seafront Sunday
Description: EADBL Seafront Sunday
Start date: Sunday, 28/07/24 End date: Sunday, 28/07/24 Timing: All Day
Promoter: SOG Sport and Culture Contractor: N/A
Bus Routes Affected: 11, 12, 13, 21, 31, 32, 41, 42, 51, 52, 60, 61, 71, 81, 92, N1, N2 Cycle Access: Dismount past works

ST. ANDREW - LA BRIGADE ( LES VAURIOUFS to LES MAUXMARQUIS (ROUTE DE ST. AND )
Description: Work starting 09:15 AM on Fri 02 Aug 24 and finishing 11:00 PM on Fri 02 Aug 24 - Sewer Rehabilitation (Part 2.1)
Start date: Friday, 02/08/24 End date: Friday, 02/08/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LA BRIGADE
Description: Sewer Rehabilitation (Part 2.2)
Start date: Saturday, 03/08/24 End date: Sunday, 04/08/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: P2, 60, 61 Cycle Access: Yes

ST. ANDREW - RUE DE LA BOULLERIE
Description: Work starting 07:00 AM on Tue 30 Jul 24 and finishing 06:00 PM on Thu 01 Aug 24 - Sewer Rehabilitation
Start date: Tuesday, 30/07/24 End date: Thursday, 01/08/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LA RUETTE DES FOSSES ( LES HURETTES to LA RUETTE )
Description: Access chamber to connect new fibres
Start date: Monday, 29/07/24 End date: Wednesday, 31/07/24 Timing: All Day
Promoter: JT Guernsey Contractor: JT Guernsey
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - FOSSE ANDRE
Description: Work starting 07:00 AM on Tue 30 Jul 24 and finishing 05:00 PM on Sun 04 Aug 24 - Sewer Rehabilitation
Start date: Tuesday, 30/07/24 End date: Sunday, 04/08/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - Guernsey Kart and Motor Club LBG (GK&MC) - Hill Climb ( Castle Emplacement to Fort Road )
Description: Guernsey Kart and Motor Club LBG (GKandMC) - Hill Climb
Start date: Saturday, 03/08/24 End date: Saturday, 03/08/24 Timing: All Day
Promoter: GKMC - Guernsey Kart and Motor Club Contractor: N/A
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - KINGS ROAD ( MOUNT ROW to RUE A L'OR )
Description: Noisy Cover needs reseating, should only be 30mins
Start date: Monday, 29/07/24 End date: Monday, 29/07/24 Timing: Between AM and PM Peaks
Promoter: JT Guernsey Contractor: JT Guernsey
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - MOUNT DURAND ( PRINCE ALBERT ROAD to VALNORD ROAD )
Description: Fibre duct pull
Start date: Saturday, 03/08/24 End date: Saturday, 03/08/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - NEW PARIS ROAD ( PIETTE ROAD to PARIS STREET )
Description: Road closure - New Paris Road
Start date: Wednesday, 31/07/24 End date: Saturday, 31/08/24 Timing: Between AM and PM Peaks
Promoter: R and R Removals Contractor: R and R Removals
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - Olls Gallery Launch Party ( MANSELL COURT to BACK STREET )
Description: Olls Gallery Launch Party 2 Contree Mansell
Start date: Friday, 02/08/24 End date: Friday, 02/08/24 Timing: Between AM and PM Peaks
Promoter: Olls Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - Rocquaine Regatta 2024
Description: Rocquaine Regatta 2024
Start date: Saturday, 27/07/24 End date: Saturday, 27/07/24 Timing: All Day
Promoter: Rocquaine Regatta Committee Contractor: N/A
Bus Routes Affected: 61, 71, 91, 92, 93, 94, N3 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE QUANTERAINE ( RUE DU BORDAGE to ROUTE DES SAGES )
Description: Tree Surgery Works
Start date: Monday, 29/07/24 End date: Tuesday, 30/07/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Cycle Access: Yes

ST. PIERRE DU BOIS - RUE DES BREHAUTS ( RUE DES BUTTES to RUE DES RAIES )
Description: SERVICE ALTERATION
Start date: Monday, 29/07/24 End date: Wednesday, 31/07/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 61 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DES BUTTES ( RUE DE L'EGLISE to RUE DES BREHAUTS )
Description: service alteration
Start date: Monday, 29/07/24 End date: Wednesday, 31/07/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 61 Cycle Access: Dismount past works

ST. SAMPSON - BAUBIGNY ROAD
Description: Excavations for high voltage cable upgrade (Phase 4)
Start date: Monday, 29/07/24 End date: Friday, 23/08/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 21 Cycle Access: Dismount past works

ST. SAMPSON - RUE DES POINTUES ROCQUES ( ROUTE ST. CLAIR to RUE DES MONTS )
Description: service alteration
Start date: Wednesday, 31/07/24 End date: Friday, 02/08/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - RUE DE LA HOUGUE MABAN
Description: Road resurfacing
Start date: Monday, 29/07/24 End date: Friday, 16/08/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Traffic and Highway Services (Capital Works)
Bus Routes Affected: Cycle Access: No: Dismount

One Ways
ST. PETER PORT - LE FOULON; ROUTE ISABELLE to ROHAIS ( ROUTE ISABELLE to ROHAIS )
Description: Excavate 2 x blocked ducts and node installation
Start date: Monday, 29/07/24 End date: Wednesday, 31/07/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. PIERRE DU BOIS - Vintage Agricultural Show 2024 ( Rue De L'Ardaine through Rue Du Camp Massey Brehaut )
Description: Vintage Agricultural Show 2024
Start date: Saturday, 03/08/24 End date: Sunday, 04/08/24 Timing: All Day
Promoter: Private Individual Contractor: N/A
Bus Routes Affected: Cycle Access: No

Signals
No future major delays due to signals