Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - ROUTE DE COBO
|
|
|
Description:
|
Work starting 07:00 AM on Thu 12 Feb 26 and finishing 05:00 PM on Sun 15 Feb 26 - Supply line upgrade
|
|
Start date:
|
Thursday, 12/02/26
|
End date:
|
Sunday, 15/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; LB 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; SS 4A; SS 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Thu 30 Apr 26 - Investigation and repairs to roadside wall
|
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Thursday, 30/04/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
Emergency Activity - ST. PETER PORT - LA COUTURE
|
|
|
Description:
|
Work starting 09:00 AM on Thu 22 Jan 26 and finishing 05:00 PM on Fri 06 Feb 26 - Repair High Voltage cable
|
|
Start date:
|
Thursday, 22/01/26
|
End date:
|
Friday, 27/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
SS 2B; SS 3A; 51;52
|
Cycle Access:
|
Dismount past works
|
|
FOREST - LES VILLETS
|
( LA ROBERGE to LA RUE DE LA VRANGUE )
|
|
Description:
|
Skips.
|
|
Start date:
|
Monday, 26/01/26
|
End date:
|
Friday, 03/04/26
|
Timing:
All Day
|
|
Promoter:
|
R C Ashplant construction
|
Contractor:
|
R C Ashplant construction
|
|
Bus Routes Affected:
|
Houguette PS 2B;LMDC HS 3A;LMDC HS 3B;LV HS 5A;LMDC HS LB HS 3A;LMDC HS LB HS 3B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - FERMAIN LANE
|
( LA ROUTE DE SAUSMAREZ to )
|
|
Description:
|
Tree surgery
|
|
Start date:
|
Monday, 09/02/26
|
End date:
|
Friday, 13/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. MARTIN - LA RUE DES FRENES
|
( LA ROUTE DES COUTURES to )
|
|
Description:
|
Driveway works Misano/Le Petit Bocage
|
|
Start date:
|
Monday, 09/02/26
|
End date:
|
Friday, 13/02/26
|
Timing:
All Day
|
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 04:00 PM on Thu 30 Apr 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 30/04/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - BRUCE LANE
|
|
|
Description:
|
Scaffolding; Property: No 4 Bruce Lane; Purpose: External Decoration
|
|
Start date:
|
Monday, 13/10/25
|
End date:
|
Friday, 13/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - CROUTES HAVILLAND
|
( FORT ROAD to DAMOUETTES LANE )
|
|
Description:
|
Work starting 07:30 AM and finishing 04:30 PM daily between Thu 01 Jan 26 and Sun 01 Mar 26 - Skips outside No 2
|
|
Start date:
|
Thursday, 01/01/26
|
End date:
|
Sunday, 01/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
C M Building
|
Contractor:
|
C M Building
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - LES OBERLANDS
|
( LA RUE DE LA CORBINERIE to LES FRIETEAUX )
|
|
Description:
|
Low voltage cable upgrade
|
|
Start date:
|
Monday, 09/02/26
|
End date:
|
Tuesday, 24/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
P2;51;52;60;71;81
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
|
Description:
|
wall repairs
|
|
Start date:
|
Sunday, 21/12/25
|
End date:
|
Friday, 27/02/26
|
Timing:
All Day
|
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MILL STREET
|
|
|
Description:
|
Work starting 08:00 AM on Fri 02 Jan 26 and finishing 05:00 PM on Sun 15 Mar 26 - Relay 3` iron/asbestos main
|
|
Start date:
|
Friday, 02/01/26
|
End date:
|
Sunday, 15/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Vauvert PS 1A
|
Cycle Access:
|
No
|
|
ST. PETER PORT - MOUNT DURAND
|
( PRINCE ALBERT ROAD to VALNORD ROAD )
|
|
Description:
|
Road resurfacing
|
|
Start date:
|
Tuesday, 27/01/26
|
End date:
|
Friday, 13/02/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - RUE DU DOUIT
|
|
|
Description:
|
Culvert Repairs
|
|
Start date:
|
Friday, 06/02/26
|
End date:
|
Monday, 16/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - VALNORD LANE
|
( VALNORD ESTATE to GREEN LANES )
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 23 Jun 25 and Sat 28 Feb 26 - Delivery of building materials.
|
|
Start date:
|
Monday, 23/06/25
|
End date:
|
Saturday, 28/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Hillstone Guernsey Ltd
|
Contractor:
|
Hillstone Guernsey Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - LES BARRAS LANE
|
|
|
Description:
|
Work starting 06:00 AM on Thu 12 Feb 26 and finishing 04:00 PM on Fri 13 Feb 26 - Filter installation
|
|
Start date:
|
Thursday, 12/02/26
|
End date:
|
Friday, 13/02/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Parking Suspensions and Events)
|
Contractor:
|
States Works (Private Works)
|
|
Bus Routes Affected:
|
LMDC HS 7B;LV HS 1A;LV HS 1B;LV HS 2A;LV HS 2B;LV HS 7B;LV HS 8A;SS HS 1A;SS HS 1B
|
Cycle Access:
|
Yes
|
No current major delays due to one ways
No current major delays due to signals
|
CASTEL - LES QUERITES
|
( RUE DE LA HOUGUE to ROUTE DU TERTRE )
|
|
Description:
|
Install new surface water connection
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Friday, 20/02/26
|
Timing:
All Day
|
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - MONT D`AVAL
|
|
|
Description:
|
Work starting 08:00 AM and finishing 06:00 PM daily between Mon 16 Feb 26 and Thu 19 Feb 26 - Tree works
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Thursday, 19/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; Castel 3B; LB 1B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; LV 5A / LB 6A; LV 5B / LB 6B; 42;N2
|
Cycle Access:
|
No
|
|
CASTEL - RUE DE LA RONDE CHEMINEE
|
|
|
Description:
|
Dismantle and rebuild roadside wall
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Saturday, 07/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Paul Bonnel Stonemasons
|
Contractor:
|
Paul Bonnel Stonemasons
|
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Yes
|
|
CASTEL - RUETTE DE LA CROIX
|
|
|
Description:
|
Supply line upgrade
|
|
Start date:
|
Friday, 13/02/26
|
End date:
|
Sunday, 15/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; LB 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; SS 4A; SS 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUETTE DES SAUMAREZ
|
( RUE DES HOUMETS to ROUTE DE SAUMAREZ )
|
|
Description:
|
Rebuilding roads side wall
|
|
Start date:
|
Thursday, 19/02/26
|
End date:
|
Friday, 20/02/26
|
Timing:
All Day
|
|
Promoter:
|
ACLMS
|
Contractor:
|
ACLMS
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. ANDREW - ROHAIS DE HAUT
|
|
|
Description:
|
Work starting 07:30 AM on Tue 17 Feb 26 and finishing 04:00 PM on Fri 17 Apr 26 - Road resurfacing
|
|
Start date:
|
Tuesday, 17/02/26
|
End date:
|
Friday, 17/04/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; St Martin 1A; LB 1B; LV 3B; LV 4B; P2
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - RUE DES VARENDES
|
|
|
Description:
|
Supply line alteration
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Wednesday, 18/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; LB 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; LMDC 7B; LV 1A; LV 8A; LV 5A / LB 6A; LV 5B / LB 6B; P2;41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - ICART ROAD
|
|
|
Description:
|
Work starting 07:30 AM on Mon 16 Feb 26 and finishing 04:00 PM on Fri 13 Mar 26 - Road resurfacing
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Friday, 13/03/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - LA GRANDE RUE; SCHOOL LANE to LES CAMPS
|
( SCHOOL LANE to LES CAMPS )
|
|
Description:
|
Work starting 09:00 AM on Mon 16 Feb 26 and finishing 04:00 PM on Wed 18 Feb 26 - Installing drop curb
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Wednesday, 18/02/26
|
Timing:
All Day
|
|
Promoter:
|
EC Carpentry
|
Contractor:
|
EC Carpentry
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - CHURCH SQUARE; QUAY STREET to MARKET HILL
|
( QUAY STREET to MARKET HILL )
|
|
Description:
|
Christmas light removal
|
|
Start date:
|
Sunday, 15/02/26
|
End date:
|
Sunday, 15/02/26
|
Timing:
All Day
|
|
Promoter:
|
Event Hire Guernsey Ltd
|
Contractor:
|
Event Hire Guernsey Ltd
|
|
Bus Routes Affected:
|
LBHS 2A;LBHS 3B;LB HS 9B;LMDC HS 5B;LMDC HS 6B;SS HS 4B
|
Cycle Access:
|
No
|
|
ST. PETER PORT - GUELLES LANE
|
( MONT ARRIVE to GUELLES ROAD )
|
|
Description:
|
Work starting 08:30 AM on Sat 14 Feb 26 and finishing 12:30 PM on Sat 14 Feb 26 - CCTV Investigation
|
|
Start date:
|
Saturday, 14/02/26
|
End date:
|
Saturday, 14/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
LV HS 7B
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - HOSPITAL LANE
|
( ST. JULIAN'S AVENUE to HIRZEL STREET )
|
|
Description:
|
Work starting 07:30 AM and finishing 12:00 PM - Crane lift scaffolding
|
|
Start date:
|
Wednesday, 18/02/26
|
End date:
|
Wednesday, 18/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - MAUREPAS ROAD
|
( FOSSE ANDRE to GUELLES ROAD )
|
|
Description:
|
school crossing lights and street light
|
|
Start date:
|
Tuesday, 17/02/26
|
End date:
|
Wednesday, 18/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Capelles PS 1B;Capelles PS 2B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MONT ARRIVE
|
|
|
Description:
|
Work starting 08:00 AM on Sat 14 Feb 26 and finishing 05:00 PM on Sat 14 Feb 26 - Sewer Repair ( O/S Old Spa Del La Mare Site )
|
|
Start date:
|
Saturday, 14/02/26
|
End date:
|
Saturday, 14/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
Amherst 1A; 32
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - MOUNT ROW
|
|
|
Description:
|
Work starting 07:30 AM on Sat 14 Feb 26 and finishing 04:00 PM on Sun 22 Feb 26 - Road resurfacing
|
|
Start date:
|
Saturday, 14/02/26
|
End date:
|
Sunday, 22/02/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
Vauvert 1B; LMDC 7A; 60;61;71;81;N4
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - PRINCE ALBERT ROAD
|
( RUETTES BRAYES to MOUNT ROW )
|
|
Description:
|
Replacement of faulty streetlight
|
|
Start date:
|
Saturday, 14/02/26
|
End date:
|
Saturday, 14/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
|
Bus Routes Affected:
|
Vauvert 1B; LMDC 7A; LMDC 7B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - UNION STREET; ALLEZ STREET to ST. JOHN STREET
|
( ALLEZ STREET to ST. JOHN STREET )
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 16 Feb 26 and Fri 20 Feb 26 - Urgent repair works.
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Friday, 20/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - DUVEAUX ROAD
|
( LE MURIER to BAUBIGNY ROAD )
|
|
Description:
|
service alteration
|
|
Start date:
|
Thursday, 19/02/26
|
End date:
|
Friday, 20/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
SS 3A; SS 4A; SS 5A; SS 6A; SS 8A; 21
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - LA ROUTE DES CAPELLES
|
( LES HOUGUES MAGUES ROAD to LES PETITES CAPELLES RO )
|
|
Description:
|
Streetlight replacement
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Tuesday, 17/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Capelles 1A; SS 1B; 31;32
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - LE BORDAGE ROAD
|
|
|
Description:
|
service alteration
|
|
Start date:
|
Tuesday, 17/02/26
|
End date:
|
Wednesday, 18/02/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Amherst PS 1A;Amherst PS 1B;SS HS 2A;SS HS 2B;SS HS 3A;SS HS 7B
|
Cycle Access:
|
Dismount past works
|
|
VALE - LA GRANDE MAISON ROAD
|
( LES HAUTS COURTILS LANE to LES HAUTS COURTILS ROAD )
|
|
Description:
|
tree surgery
|
|
Start date:
|
Tuesday, 17/02/26
|
End date:
|
Tuesday, 17/02/26
|
Timing:
All Day
|
|
Promoter:
|
Treevolution
|
Contractor:
|
Treevolution
|
|
Bus Routes Affected:
|
LV 1B; LV 8A; SS 1B
|
Cycle Access:
|
Dismount past works
|
No future major delays due to one ways
|
CASTEL - KING'S MILLS ROAD; RUE DES BERGERS to LA SAUVARINERIE
|
( RUE DES BERGERS to LA SAUVARINERIE )
|
|
Description:
|
Rebuilding roadside wall
|
|
Start date:
|
Monday, 16/02/26
|
End date:
|
Friday, 20/02/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Stoneworks Ltd
|
Contractor:
|
Stoneworks Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|