Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - LES QUERITES
|
( RUE DE LA HOUGUE to ROUTE DU TERTRE )
|
|
Description:
|
Work starting 08:00 AM on Mon 03 Aug 26 and finishing 04:00 PM on Tue 08 Sep 26 - REBUILD ROADSIDE WALL
|
|
Start date:
|
Monday, 03/08/26
|
End date:
|
Tuesday, 08/09/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - ROUTE DE LA HOUGUE DU POMMIER
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Mon 21 Dec 26 - Install new 400mm water ring main pipework
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Monday, 21/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUE DU FRIQUET
|
|
|
Description:
|
Work starting 08:30 AM on Mon 24 Aug 26 and finishing 05:00 PM on Sun 04 Oct 26 - Foul manhole refurbishments
|
|
Start date:
|
Monday, 24/08/26
|
End date:
|
Sunday, 04/10/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 7B; LV 1A; LV 8A; P2;51;52
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Sat 31 Oct 26 - Investigation and repairs to roadside wall
|
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Saturday, 31/10/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
FOREST - LA PLANQUE LANE
|
( RUE DES LANDES to LES NOUETTES )
|
|
Description:
|
Work starting 07:00 AM on Tue 01 Sep 26 and finishing 11:59 PM on Fri 02 Oct 26 - Substation replacement and low voltage cable upgrades
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Friday, 02/10/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
FOREST - RUE DES AUBERTS
|
( LE BOURG to )
|
|
Description:
|
Primary substation replacement
|
|
Start date:
|
Monday, 22/06/26
|
End date:
|
Friday, 27/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Thu 31 Dec 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 31/12/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - LA GIBAUDERIE
|
( ROSAIRE AVENUE to DALGAIRNS ROAD )
|
|
Description:
|
High voltage substation connection, low voltage cabling upgrade and service upgrades
|
|
Start date:
|
Monday, 07/09/26
|
End date:
|
Friday, 16/10/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin PS 1A;St Martin PS 1B;LB HS 4A Overflow
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MILL STREET
|
|
|
Description:
|
Scaffolding for structural repairs; Property: 17 Mill St; Purpose: Other (see Details)
|
|
Start date:
|
Saturday, 15/08/26
|
End date:
|
Tuesday, 15/09/26
|
Timing:
All Day
|
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PIERRE DU BOIS - RUE DU BORDAGE
|
( RUE DU CAMP AU PRETRE to RUE DE LA FONTENELLE )
|
|
Description:
|
building gable wall.
|
|
Start date:
|
Friday, 28/08/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
VALE - ROCQUE ES CAS
|
|
|
Description:
|
Work starting 08:30 AM on Fri 04 Sep 26 and finishing 05:00 PM on Wed 09 Sep 26 - Install new water service
|
|
Start date:
|
Friday, 04/09/26
|
End date:
|
Wednesday, 09/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Vale PS 2B;Vale PS 3B
|
Cycle Access:
|
Dismount past works
|
|
VALE - ROUTE DE LA CHARRUEE
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Mon 21 Dec 26 - Upsize existing water main
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Monday, 21/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
VALE - VALE-MISC54
|
( ROCQUE ES CAS to LA MOYE ROAD )
|
|
Description:
|
Work starting 10:00 AM on Tue 14 Jul 26 and finishing 04:00 PM on Wed 14 Oct 26 - Deliveries and Barn renovations
|
|
Start date:
|
Tuesday, 14/07/26
|
End date:
|
Wednesday, 14/10/26
|
Timing:
All Day
|
|
Promoter:
|
Omega Group
|
Contractor:
|
Omega Group
|
|
Bus Routes Affected:
|
Vale PS 2B;Vale PS 3B
|
Cycle Access:
|
Dismount past works
|
|
VALE - VERTE RUE
|
( LANDES DU MARCHE to RUE DU PONT VAILLANT )
|
|
Description:
|
Supply line alteration
|
|
Start date:
|
Monday, 07/09/26
|
End date:
|
Wednesday, 09/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Capelles PS 1A;LMDC HS 7A;LMDC HS 7B;LV HS 2A;LV HS 2B;SS HS 1A
|
Cycle Access:
|
Dismount past works
|
|
VALE - TRAFALGAR ROAD
|
|
|
Description:
|
Work starting 07:30 AM on Mon 27 Jul 26 and finishing 04:00 PM on Thu 10 Sep 26 - Erect Scaffolding ; Property: New Home Base store Project; Purpose: Access
|
|
Start date:
|
Monday, 27/07/26
|
End date:
|
Thursday, 10/09/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - RUE DE LA SALINE
|
( ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BU )
|
|
Description:
|
COASTAL WALL REPAIR.
|
|
Start date:
|
Monday, 07/09/26
|
End date:
|
Friday, 18/12/26
|
Timing:
All Day
|
|
Promoter:
|
States Property Unit
|
Contractor:
|
States Property Unit
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - LA CHARROTERIE
|
( PRINCE ALBERT ROAD to RUE DU PRE )
|
|
Description:
|
building of housing.
|
|
Start date:
|
Monday, 24/08/26
|
End date:
|
Tuesday, 28/03/28
|
Timing:
All Day
|
|
Promoter:
|
Legandre Guernsey
|
Contractor:
|
Legandre Guernsey
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
TORTEVAL - ROUTE DE LA LAGUE
|
( RUE DE LA VILTOLE to RUE DU HUREL )
|
|
Description:
|
Work starting 08:00 AM on Mon 08 Jun 26 and finishing 05:00 PM on Fri 02 Oct 26 - repair roadside wall
|
|
Start date:
|
Monday, 08/06/26
|
End date:
|
Friday, 02/10/26
|
Timing:
All Day
|
|
Promoter:
|
States Committee of the Environment and Infrastructure
|
Contractor:
|
States Committee of the Environment and Infrastructure
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - RUE DES CAUVAINS
|
( LA NEUVE RUE to RUETTE DE LA CROIX )
|
|
Description:
|
Essential maintenance to gas network
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Wednesday, 16/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
FOREST - LA RUE DE L`EPINEL
|
( CHASSE DES GALLIENNES to LA RUE DE LA VRANGUE )
|
|
Description:
|
Potholes
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Wednesday, 16/09/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
FOREST - RUE DE LA VILLIAZE
|
( NEW ROAD to LA ROUTE DE FARRAS )
|
|
Description:
|
Work starting 08:30 AM on Mon 14 Sep 26 and finishing 05:00 PM on Sun 18 Oct 26 - Install drainage and services
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Sunday, 18/10/26
|
Timing:
All Day
|
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LV 5A / LB 6A; LV 5B / LB 6B; 71;91;92;93;94;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - Channel Islands Pride
|
|
|
Description:
|
Closure of Quay St and Church Square 10am to 9pm
|
|
Start date:
|
Saturday, 12/09/26
|
End date:
|
Saturday, 12/09/26
|
Timing:
All Day
|
|
Promoter:
|
Channel Islands Pride
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
LBHS 2A;LBHS 3B;LB HS 9B;LMDC HS 5B;LMDC HS 6B;SS HS 4B
|
Cycle Access:
|
No
|
|
ST. PETER PORT - Crown Pier Asian and Farmer`s Market
|
|
|
Description:
|
Careening Hard Arm closure 7am to 5pm
|
|
Start date:
|
Sunday, 13/09/26
|
End date:
|
Sunday, 13/09/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No:
|
|
ST. PETER PORT - DAMOUETTES LANE
|
( COURTIL COLIN to CROUTES HAVILLAND )
|
|
Description:
|
Tree Surgery
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Tuesday, 15/09/26
|
Timing:
All Day
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - FORT ROAD
|
|
|
Description:
|
Fermain Lane Substation replacement phase 1
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Tuesday, 20/10/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 2A; LB 3B; LV 4A; 91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LE TRUCHOT
|
|
|
Description:
|
Work starting 07:30 AM on Wed 09 Sep 26 and finishing 04:00 PM on Thu 10 Sep 26 - Road resurfacing
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Thursday, 10/09/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
SS HS 4B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LE TRUCHOT
|
( LOWER CANICHERS to ST. JULIAN'S WEIGHBRIDGE )
|
|
Description:
|
Crane lift of air con units
|
|
Start date:
|
Sunday, 13/09/26
|
End date:
|
Sunday, 13/09/26
|
Timing:
Before AM Peak
|
|
Promoter:
|
Refco
|
Contractor:
|
Refco
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES PETITES FONTAINES
|
( QUEENS ROAD to MOUNT HERMON )
|
|
Description:
|
Concrete Pour
|
|
Start date:
|
Friday, 11/09/26
|
End date:
|
Friday, 11/09/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
Vauvert PS 1B;LMDC HS 7A
|
Cycle Access:
|
No
|
|
ST. PIERRE DU BOIS - FIEF LA COMTE
|
( ROUTE DU FELCONTE to BAS ROUVETS )
|
|
Description:
|
Service alteration
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Friday, 11/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Houguette 1B; Houguette 3A; Houguette 3B; LB 9B; LMDC 4A; LMDC 4B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; 60;61
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - Guernsey Football Association
|
|
|
Description:
|
GFC match - road closure
|
|
Start date:
|
Saturday, 12/09/26
|
End date:
|
Saturday, 12/09/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Vale 2A
|
Cycle Access:
|
Yes:
|
|
ST. SAMPSON - ROUTE DE PORT GRAT; ROUTE DE PULIAS to LES DICQS
|
( ROUTE DE PULIAS to LES DICQS )
|
|
Description:
|
Work starting 08:00 AM on Mon 14 Sep 26 and finishing 05:00 PM on Wed 16 Sep 26 - Supply line upgrade
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Wednesday, 16/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. SAVIOUR - RUE DE LA FOSSE
|
|
|
Description:
|
Work starting 07:30 AM on Mon 14 Sep 26 and finishing 04:00 PM on Fri 18 Sep 26 - Road resurfacing
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Friday, 18/09/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
Houguette PS 1B;Houguette PS 3B;Houguette PS 4A;LMDC HS 3A;LMDC HS 3B;LMDC HS LB HS 3A;LMDC HS LB HS 3B
|
Cycle Access:
|
Dismount past works
|
|
TORTEVAL - RUE DES ROCQUES
|
( RUE DU SAUCHET to LE CLOS )
|
|
Description:
|
Supply line upgrade
|
|
Start date:
|
Monday, 14/09/26
|
End date:
|
Wednesday, 16/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - DEHUS LANE
|
( LA MIELLETTE LANE to RUE DE L'EPINE )
|
|
Description:
|
Renew water service
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Thursday, 10/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - Guernsey Granite Weekender
|
|
|
Description:
|
Road closed from 06:00 to 15:00hrs - no parking in road
|
|
Start date:
|
Sunday, 13/09/26
|
End date:
|
Sunday, 13/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Triathlon Club
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - VERTE RUE; LANDES DU MARCHE to RUE DU PONT VAILLANT
|
( LANDES DU MARCHE to RUE DU PONT VAILLANT )
|
|
Description:
|
Install new water service to development
|
|
Start date:
|
Wednesday, 09/09/26
|
End date:
|
Friday, 11/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Capelles PS 1A;LMDC HS 7A;LMDC HS 7B;LV HS 2A;LV HS 2B;SS HS 1A
|
Cycle Access:
|
Dismount past works
|
|
FOREST - FOREST - Meet The Pilots
|
|
|
Description:
|
one-way between 3pm and 7:30pm
|
|
Start date:
|
Tuesday, 08/09/26
|
End date:
|
Tuesday, 08/09/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Forest 2A; Forest 2B; LB 4A; LB 5A; LB 5B
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - The Sixth Form Centre Team Building Day
|
|
|
Description:
|
Temporary one-way until 4pm
|
|
Start date:
|
Friday, 11/09/26
|
End date:
|
Friday, 11/09/26
|
Timing:
All Day
|
|
Promoter:
|
The Sixth Form Centre
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
LMDC HS 7B;LV HS 1A;LV HS 2A;LV HS 8A
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - RUE DE LA PERRUQUE
|
|
|
Description:
|
Access to Chamber for urgent network connection
|
|
Start date:
|
Thursday, 10/09/26
|
End date:
|
Thursday, 10/09/26
|
Timing:
All Day
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - ST. GEORGE'S ESPLANADE
|
|
|
Description:
|
Temporary traffic lights and single lane traffic for pit clean of Piette pump station
|
|
Start date:
|
Sunday, 13/09/26
|
End date:
|
Sunday, 13/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|