Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - ROUTE DE LA HOUGUE DU POMMIER
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Mon 21 Dec 26 - Install new 400mm water ring main pipework
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Monday, 21/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
FOREST - RUE DES AUBERTS
|
( LE BOURG to )
|
|
Description:
|
Primary substation replacement
|
|
Start date:
|
Monday, 22/06/26
|
End date:
|
Friday, 27/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. ANDREW - LES POIDEVINS
|
|
|
Description:
|
Hiab Lift
|
|
Start date:
|
Wednesday, 11/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - LES RUETTES
|
( ROUTE DE LA CROIX AU BAILIFF to FOULON ROAD )
|
|
Description:
|
Works to roadside driveway
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - COIN COLIN
|
|
|
Description:
|
Work starting 07:30 AM on Mon 09 Nov 26 and finishing 04:00 PM on Fri 20 Nov 26 - Road resurfacing
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Friday, 20/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. MARTIN - VILLE AMPHREY
|
( RUETTE RABEY to )
|
|
Description:
|
Roads resurfacing
|
|
Start date:
|
Wednesday, 11/11/26
|
End date:
|
Friday, 13/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
St Martin PS 3A;St Martin PS 3B;LBHS 1A;LBHS 1B;LBHS 2A;LBHS 3B;LV HS 4B;LV HS 6B;LV HS 9B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Thu 31 Dec 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 31/12/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - COLLINGS ROAD
|
|
|
Description:
|
supply line upgrade
|
|
Start date:
|
Wednesday, 11/11/26
|
End date:
|
Friday, 13/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vauvert 1A; Vauvert 1B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - DOYLE STREET
|
( LOWER CANICHERS to LE TRUCHOT )
|
|
Description:
|
Construction of an accessible ramp outside the rear of Sarnia House on Doyle Street.
|
|
Start date:
|
Sunday, 08/11/26
|
End date:
|
Saturday, 14/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - FORT ROAD
|
|
|
Description:
|
Fermain Lane Substation replacement phase 2
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Monday, 30/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 2A; LB 3B; LV 4A; 91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - THE STRAND
|
( CLIFF STREET to HAVELET )
|
|
Description:
|
works being done to 16 Hauteville in the back carpark which leads onto main road, large vehichels will need to access and will be in the way along with works to be carried out
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Tuesday, 01/12/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - LES REINES
|
|
|
Description:
|
Erect Scaffolding; Property: Les Reines; Purpose: Roofing Works
|
|
Start date:
|
Monday, 19/10/26
|
End date:
|
Friday, 11/12/26
|
Timing:
All Day
|
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
|
Bus Routes Affected:
|
Forest PS 1A;Forest PS 1B;LB HS 6A;LB HS 6B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - RUE DU BORDAGE
|
( RUE DU CAMP AU PRETRE to RUE DE LA FONTENELLE )
|
|
Description:
|
building gable wall.
|
|
Start date:
|
Friday, 28/08/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - ROUTE MILITAIRE
|
|
|
Description:
|
Work starting 07:30 AM on Thu 12 Nov 26 and finishing 05:00 PM on Tue 17 Nov 26 - New supply line
|
|
Start date:
|
Thursday, 12/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - ROUTE MILITAIRE
|
|
|
Description:
|
High voltage substation installation, high and low voltage cable upgrade and service upgrades
|
|
Start date:
|
Monday, 28/09/26
|
End date:
|
Friday, 18/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - RUE QUERIPEL; SALTPANS ROAD to ROBERGERIE
|
( SALTPANS ROAD to ROBERGERIE )
|
|
Description:
|
Scaffolding
|
|
Start date:
|
Friday, 06/11/26
|
End date:
|
Friday, 04/12/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAVIOUR - LES BUTTES
|
|
|
Description:
|
Tree surgery
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Friday, 13/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
No
|
|
ST. SAVIOUR - ROUTE DE LA PERELLE
|
|
|
Description:
|
CAVITY IN THE ROAD
|
|
Start date:
|
Tuesday, 10/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Traffic and Highway Services (Highways Inspector)
|
|
Bus Routes Affected:
|
61, 91, 92, N3
|
Cycle Access:
|
Dismount past works
|
|
VALE - LA BAILLOTERIE LANE; LA ROUTE DU BRAYE to RUE DES HAIZES
|
( LA ROUTE DU BRAYE to RUE DES HAIZES )
|
|
Description:
|
Essential upgrade to Gas Main Netork
|
|
Start date:
|
Tuesday, 10/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - ROUTE DE LA CHARRUEE
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Wed 23 Dec 26 - Upsize existing water main
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
VALE - RUE DES HAIZES
|
|
|
Description:
|
Essential maintenance to gas Mains and Services.
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - RUE DU CHARDRONNET
|
( LA RUE DE PARADIS to RUE DE DESSOUS )
|
|
Description:
|
Erect Scaffold to enable roof repairs
|
|
Start date:
|
Monday, 26/10/26
|
End date:
|
Thursday, 26/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
VALE - VALE-MISC54
|
( ROCQUE ES CAS to LA MOYE ROAD )
|
|
Description:
|
Work starting 10:00 AM on Tue 14 Jul 26 and finishing 11:30 PM on Thu 31 Dec 26 - Deliveries and Barn renovations
|
|
Start date:
|
Tuesday, 14/07/26
|
End date:
|
Thursday, 31/12/26
|
Timing:
All Day
|
|
Promoter:
|
Omega Group
|
Contractor:
|
Omega Group
|
|
Bus Routes Affected:
|
Vale PS 2B;Vale PS 3B
|
Cycle Access:
|
Dismount past works
|
No current major delays due to one ways
|
CASTEL - RUE DE LA SALINE
|
( ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BU )
|
|
Description:
|
COASTAL WALL REPAIR.
|
|
Start date:
|
Monday, 07/09/26
|
End date:
|
Friday, 18/12/26
|
Timing:
All Day
|
|
Promoter:
|
States Property Unit
|
Contractor:
|
States Property Unit
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - ROUTE DES TALBOTS
|
( LES PETITES VALLEES to RUE DU TORVAL )
|
|
Description:
|
Tree Surgery at National Trust land.
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUE DU PRESBYTERE
|
|
|
Description:
|
service alteration
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Wednesday, 18/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Castel 1A; St Martin 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
|
FOREST - LES REBOUQUETS
|
( LES HURETTES to FOREST ROAD )
|
|
Description:
|
Treesurgery work from cherry picker
|
|
Start date:
|
Wednesday, 18/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
FOREST - RUE DE LA CORBIERE
|
( to LA RUE DE MANOIR COTE SUD )
|
|
Description:
|
Rebuilding wall
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - ROUTE DE ST. ANDRE
|
|
|
Description:
|
Emergency Tree Surgery
|
|
Start date:
|
Wednesday, 18/11/26
|
End date:
|
Wednesday, 18/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
71, N4
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BACK STREET
|
( MANSELL STREET to VAUVERT )
|
|
Description:
|
repairs and refurbishment works to three streetlights
|
|
Start date:
|
Tuesday, 17/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - BROCK ROAD
|
|
|
Description:
|
Sewer cleaning
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
31
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - French Market
|
|
|
Description:
|
French Market on Red Light Arm of Albert Pier.
|
|
Start date:
|
Wednesday, 18/11/26
|
End date:
|
Sunday, 22/11/26
|
Timing:
All Day
|
|
Promoter:
|
States of Guernsey - Communications and Marketing
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - LE TRUCHOT
|
|
|
Description:
|
Work starting 08:00 AM on Sun 15 Nov 26 and finishing 04:00 PM on Sun 15 Nov 26 - Crane Lift
|
|
Start date:
|
Sunday, 15/11/26
|
End date:
|
Sunday, 15/11/26
|
Timing:
All Day
|
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES VAUXLAURENS
|
( ST. JULIAN'S AVENUE to )
|
|
Description:
|
Gutter Cleaning and clearing using a cherry picker
|
|
Start date:
|
Sunday, 15/11/26
|
End date:
|
Sunday, 15/11/26
|
Timing:
All Day
|
|
Promoter:
|
Premium Cleaning Services
|
Contractor:
|
Premium Cleaning Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - ROHAIS
|
|
|
Description:
|
Tree Surgery
|
|
Start date:
|
Thursday, 19/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
Vauvert 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; LMDC 7B; LV 4A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - SOUTH ESPLANADE
|
( LES ECHELONS to )
|
|
Description:
|
Tree Surgery.
|
|
Start date:
|
Sunday, 15/11/26
|
End date:
|
Sunday, 15/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - RUE DES CLERCS
|
( ROUTE DE LA LAGUE to RUE DU CAMPERE )
|
|
Description:
|
Site compound / welfare area for adjacent construction site
|
|
Start date:
|
Thursday, 19/11/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - RUE DU PONT
|
( RUE TREMEL to RUE DES RAIES )
|
|
Description:
|
Tree surgery in lane between 8am and 4pm each day.
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
All Day
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - Guernsey Football Association
|
|
|
Description:
|
GFC match - road closure
|
|
Start date:
|
Saturday, 14/11/26
|
End date:
|
Saturday, 14/11/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Vale 2A
|
Cycle Access:
|
Yes:
|
|
ST. SAMPSON - SALINES LANE
|
|
|
Description:
|
CCTV, Cleaning and Sewer Repair
|
|
Start date:
|
Wednesday, 18/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAVIOUR - RUE DU DOUIT MANCHOT
|
|
|
Description:
|
Road resurfacing
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Friday, 20/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - L`ETONNELLERIE
|
( LES GRANDES MIELLES LANE to PLEINHEAUME ROAD )
|
|
Description:
|
Replace old water meters
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Thursday, 19/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - LONGREE
|
|
|
Description:
|
Install new telecoms connection
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Monday, 23/11/26
|
Timing:
All Day
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - LONGREE
|
|
|
Description:
|
Work starting 07:30 AM on Mon 16 Nov 26 and finishing 05:00 PM on Mon 30 Nov 26 - Install new water services and shut off old service
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Monday, 30/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - LONGREE
|
|
|
Description:
|
Install new electric services
|
|
Start date:
|
Monday, 16/11/26
|
End date:
|
Monday, 30/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - ST. ANDREW - ST. ANDREW - Funeral at St Andrews Church
|
|
|
Description:
|
Funeral
|
|
Start date:
|
Tuesday, 17/11/26
|
End date:
|
Tuesday, 17/11/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Beckfords Funeral Services Ltd
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
LB 4A
|
Cycle Access:
|
Yes, in direction of one-way
|
No future major delays due to signals