Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - QUEUX LANE
|
( LES BEAUCAMPS to RUETTE DES EFFARDS )
|
Description:
|
Work starting 09:00 AM on Mon 13 Jun 22 and finishing 04:00 PM on Fri 08 Jul 22 - Construct roadside wall
|
Start date:
|
Monday, 13/06/22
|
End date:
|
Friday, 08/07/22
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Closure
|
CASTEL - ROUTE DU TERTRE
|
|
Description:
|
Work starting 07:30 AM on Mon 20 Jun 22 and finishing 05:00 PM on Fri 15 Jul 22 - Road resurfacing
|
Start date:
|
Monday, 20/06/22
|
End date:
|
Friday, 15/07/22
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
States Works (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: Dismount Signage
|
CASTEL - RUE DE LA HOUGUE
|
( LA HOUGUETTE ROAD to RUE AU FERRE )
|
Description:
|
Work starting 08:00 AM on Mon 27 Jun 22 and finishing 05:00 PM on Fri 01 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - CASTEL - RUE DE LA VIEILLE MARE
|
|
Description:
|
Repair burst 8" water main
|
Start date:
|
Saturday, 25/06/22
|
End date:
|
Wednesday, 29/06/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. ANDREW - LES VAURIOUFS
|
|
Description:
|
CUT OFF GAS SERVICE IN THE ROAD
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Wednesday, 29/06/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - RUE CHARIOT
|
|
Description:
|
Work starting 08:00 AM on Mon 16 May 22 and finishing 05:00 PM on Mon 04 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 16/05/22
|
End date:
|
Monday, 04/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BOUILLON LANE
|
|
Description:
|
Work starting 07:00 AM on Mon 15 Nov 21 and finishing 05:00 PM on Fri 29 Jul 22 - Scaffold for repairs to fire damaged roof; Property: Jamaica Inn; Purpose: Roofing Works
|
Start date:
|
Monday, 15/11/21
|
End date:
|
Friday, 29/07/22
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HAUTEVILLE
|
( PEDVIN STREET to HAVELET )
|
Description:
|
Work starting 07:00 AM on Mon 27 Jun 22 and finishing 05:00 PM on Mon 04 Jul 22 - Install water service
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Monday, 04/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: Dismount passed works
|
ST. PETER PORT - LA RUE MARGUERITE
|
|
Description:
|
Work starting 08:00 AM on Mon 05 Oct 20 and finishing 05:00 PM on Sun 31 Jul 22 - Construction of 5 storey office block and site set up
|
Start date:
|
Monday, 05/10/20
|
End date:
|
Sunday, 31/07/22
|
Timing:
All Day
|
Promoter:
|
J W Rihoy Builders
|
Contractor:
|
J W Rihoy Builders
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: road barriered off
|
ST. PETER PORT - ST. JAMES STREET
|
|
Description:
|
Work starting 08:00 AM on Wed 01 Jun 22 and finishing 05:00 PM on Sat 30 Jul 22 - Crane Lift for building construction
|
Start date:
|
Wednesday, 01/06/22
|
End date:
|
Saturday, 30/07/22
|
Timing:
All Day
|
Promoter:
|
J W Rihoy Builders
|
Contractor:
|
J W Rihoy Builders
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( ROUTE DU LONGFRIE to RUE DU LONGFRIE )
|
Description:
|
CBT installation in chamber
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Wednesday, 29/06/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DES PRES
|
|
Description:
|
Work starting 08:00 AM on Mon 16 May 22 and finishing 05:00 PM on Wed 29 Jun 22 - Network Upgrade
|
Start date:
|
Monday, 16/05/22
|
End date:
|
Wednesday, 29/06/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DU CAMP AU PRETRE
|
( RUE DU COUDRE to RUE DU CATILLON )
|
Description:
|
tree surgery
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Thursday, 30/06/22
|
Timing:
All Day
|
Promoter:
|
Special Branch
|
Contractor:
|
Special Branch
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LES CANUS
|
( LES ABREUVEURS ROAD to LA ROUTE DES CAPELLES )
|
Description:
|
Work starting 07:00 AM on Mon 20 Jun 22 and finishing 05:00 PM on Fri 01 Jul 22 - Closure to allow for new mains to be installed and connected
|
Start date:
|
Monday, 20/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - HOUMET LANE
|
|
Description:
|
Work starting 12:00 AM on Mon 13 Jun 22 and finishing 05:00 PM on Sun 03 Jul 22 - Network upgrade
|
Start date:
|
Monday, 13/06/22
|
End date:
|
Sunday, 03/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: Dismount signage
|
VALE - LA HOUGUE
|
( CROUTE BECREL to RUE DES LANDES )
|
Description:
|
Work starting 08:00 AM on Mon 27 Jun 22 and finishing 05:00 PM on Fri 01 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - ROUTE DE VAUGRAT
|
( RUE D'AVAL to )
|
Description:
|
Work starting 07:30 AM on Wed 15 Jun 22 and finishing 04:00 PM on Fri 01 Jul 22 - Road resurfacing
|
Start date:
|
Wednesday, 15/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Will have to dismount and walk through
|
ST. SAMPSON - RUE DES COTTES
|
( PLEINHEAUME ROAD to ROUTE DE LA PASSEE )
|
Description:
|
Obstruction of eastbound lane at junction with Grand Maison Road due to scaffolding in carriageway.
|
Start date:
|
Monday, 27/06/22
|
End date:
|
Saturday, 02/07/22
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Restricted: 1-way - eastbound will need to dismount.
|
ST. PETER PORT - COLBORNE ROAD
|
( RUETTES BRAYES to HAVILLAND ROAD )
|
Description:
|
Work starting 07:00 AM on Mon 13 Jun 22 and finishing 05:00 PM on Wed 13 Jul 22 - demolish property lean-to and build rear extension
|
Start date:
|
Monday, 13/06/22
|
End date:
|
Wednesday, 13/07/22
|
Timing:
All Day
|
Promoter:
|
Just Build It Ltd
|
Contractor:
|
Just Build It Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - Le Viaer Marchi
|
|
Description:
|
Work starting 03:00 PM on Mon 04 Jul 22 and finishing 10:00 PM on Mon 04 Jul 22 - The National Trust of Guerney Annual Viaer Marchi
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Monday, 04/07/22
|
Timing:
All Day
|
Promoter:
|
The National Trust of Guernsey
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DE BOUVERIE
|
( RUETTE DE LA TOUR to ROUTE DE CARTERET )
|
Description:
|
Work starting 07:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Fri 15 Jul 22 - Install new foul water connection to site
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Friday, 15/07/22
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DU COURTIL SIMON
|
|
Description:
|
Work starting 07:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Mon 11 Jul 22 - Replace existing water main
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Monday, 11/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: No access past works
|
FOOTES LANE - ST. ANDREW - Mini`s Soccer Festival
|
|
Description:
|
GFCs Mini`s Tournament
|
Start date:
|
Saturday, 02/07/22
|
End date:
|
Sunday, 03/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Yes
|
FOREST - RUE DES GLAGEULS
|
( LA RUE DES CROISEE to RUE DES LES HOUARDS )
|
Description:
|
Work starting 07:00 AM on Wed 29 Jun 22 and finishing 04:00 PM on Fri 01 Jul 22 - new electricity supply
|
Start date:
|
Wednesday, 29/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. ANDREW - RUE DES BAILLEULS
|
( RUE DE LA BOULLERIE to RUE DES LANDES )
|
Description:
|
Work starting 09:00 AM and finishing 03:00 PM daily between Mon 04 Jul 22 and Tue 05 Jul 22 - CCTV Camera Clean
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Tuesday, 05/07/22
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES MERRIENNES
|
|
Description:
|
Work starting 07:30 AM on Mon 04 Jul 22 and finishing 04:00 PM on Fri 15 Jul 22 - Footway resurfacing and road patching
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Friday, 15/07/22
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BELMONT ROAD
|
( QUEENS ROAD to LES CROUTES )
|
Description:
|
Work starting 07:00 AM on Tue 05 Jul 22 and finishing 05:00 PM on Fri 08 Jul 22 - Closure to allow for service alteration
|
Start date:
|
Tuesday, 05/07/22
|
End date:
|
Friday, 08/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - GRANGE ROAD
|
|
Description:
|
Electricity service alteration to property
|
Start date:
|
Tuesday, 05/07/22
|
End date:
|
Thursday, 07/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31, 41, 42, 51, 52, 60, 61, 71, 81, N2
|
Cycle Access:
|
Restricted: Trant to manage
|
ST. PETER PORT - LE BORDAGE
|
|
Description:
|
9am - 12noon crane lift
|
Start date:
|
Sunday, 03/07/22
|
End date:
|
Sunday, 03/07/22
|
Timing:
All Day
|
Promoter:
|
Siteweld ltd
|
Contractor:
|
Siteweld ltd
|
Bus Routes Affected:
|
P2, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - ROUTE DE LA RAMEE
|
( LA VRANGUE to LA NEUVE RUE )
|
Description:
|
Work starting 08:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Thu 07 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Thursday, 07/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DE LA GRANDE MAISON
|
( RUE DE LA GALLIE to RUE TREMEL )
|
Description:
|
Work starting 09:00 AM on Tue 05 Jul 22 and finishing 04:00 PM on Wed 06 Jul 22 - Repair Roadside bank
|
Start date:
|
Tuesday, 05/07/22
|
End date:
|
Wednesday, 06/07/22
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LE GRAND FORT ROAD
|
( LES PETITES CAPELLES ROAD to ROUTE CARRE )
|
Description:
|
Work starting 07:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Wed 06 Jul 22 - service alteration
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Wednesday, 06/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - ROUTE DES PIQUES
|
|
Description:
|
Work starting 08:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Fri 15 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Friday, 15/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Yes
|
VALE - CROFT LANE
|
( SOUS LES HOUGUES to LA ROUTE DU BRAYE )
|
Description:
|
CUT OFF STEEL SERVICE IN ROAD
|
Start date:
|
Wednesday, 29/06/22
|
End date:
|
Friday, 01/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - HOUGUE DU MOULIN
|
( VILLE ES PIES to RUE DE L'ECOLE )
|
Description:
|
Work starting 07:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Tue 05 Jul 22 - Install new water service
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Tuesday, 05/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: Dismount past work
|
VALE - HOUMET LANE
|
|
Description:
|
Work starting 08:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Fri 29 Jul 22 - Network Upgrade
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Friday, 29/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: Dismount signage
|
VALE - LA VILLE BAUDU
|
( LA ROUTE MILITAIRE to RUETTE DE LA FOLIE )
|
Description:
|
Work starting 08:00 AM on Wed 29 Jun 22 and finishing 05:00 PM on Fri 08 Jul 22 - Network upgrade
|
Start date:
|
Wednesday, 29/06/22
|
End date:
|
Friday, 08/07/22
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
13, N1
|
Cycle Access:
|
Yes
|
No future major delays due to one ways
ST. SAMPSON - LES BAS COURTILS ROAD
|
( CAMP CODE LANE to VALE ROAD )
|
Description:
|
Work starting 07:00 AM on Mon 04 Jul 22 and finishing 05:00 PM on Fri 08 Jul 22 - Electricity cable fault leading to streetlight
|
Start date:
|
Monday, 04/07/22
|
End date:
|
Friday, 08/07/22
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|