Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - RUE DE LA HOUGUE
|
( to RUE AU FERRE )
|
|
Description:
|
Work starting 12:00 PM on Mon 23 Feb 26 and finishing 04:00 PM on Fri 20 Mar 26 - Rebuilding roadside wall
|
|
Start date:
|
Monday, 23/02/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
Houguette PS 1B;Houguette PS 3B;LBHS 5A;LBHS 5B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A
|
Cycle Access:
|
Yes
|
|
CASTEL - RUE DES HOUGUES; RUETTE DU HAUT SEJOUR to SSAV-MISC13
|
( RUETTE DU HAUT SEJOUR to SSAV-MISC13 )
|
|
Description:
|
Work starting 08:30 AM on Thu 12 Mar 26 and finishing 07:30 AM on Sat 14 Mar 26 - Repair leaking air valve
|
|
Start date:
|
Thursday, 12/03/26
|
End date:
|
Saturday, 14/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Thu 30 Apr 26 - Investigation and repairs to roadside wall
|
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Thursday, 30/04/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
FOREST - LES VILLETS
|
( LA ROBERGE to LA RUE DE LA VRANGUE )
|
|
Description:
|
Skips.
|
|
Start date:
|
Monday, 26/01/26
|
End date:
|
Friday, 03/04/26
|
Timing:
All Day
|
|
Promoter:
|
R C Ashplant construction
|
Contractor:
|
R C Ashplant construction
|
|
Bus Routes Affected:
|
Houguette PS 2B;LMDC HS 3A;LMDC HS 3B;LV HS 5A;LMDC HS LB HS 3A;LMDC HS LB HS 3B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - CALAIS LANE
|
( ROUTE DE JERBOURG to CALAIS ROAD )
|
|
Description:
|
Essential maintenance to gas service.
|
|
Start date:
|
Monday, 09/03/26
|
End date:
|
Monday, 23/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. MARTIN - LE COURTILLET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 09 Mar 26 and finishing 04:00 PM on Fri 20 Mar 26 - Road resurfacing
|
|
Start date:
|
Monday, 09/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 04:00 PM on Thu 30 Apr 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 30/04/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - BRUCE LANE
|
|
|
Description:
|
Work starting 07:00 AM and finishing 11:59 PM daily between Mon 13 Oct 25 and Tue 31 Mar 26 - Scaffolding; Property: No 4 Bruce Lane; Purpose: External Decoration
|
|
Start date:
|
Monday, 13/10/25
|
End date:
|
Tuesday, 31/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - GUELLES LANE
|
( MONT ARRIVE to GUELLES ROAD )
|
|
Description:
|
Work starting 07:30 AM on Mon 02 Mar 26 and finishing 05:00 PM on Thu 09 Apr 26 - High voltage substation connection and low voltage cable overlay
|
|
Start date:
|
Monday, 02/03/26
|
End date:
|
Thursday, 09/04/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
LV HS 7B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES OZOUETS ROAD
|
|
|
Description:
|
Trial trench investigation works
|
|
Start date:
|
Tuesday, 10/03/26
|
End date:
|
Monday, 16/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
SS 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
|
Description:
|
Work starting 07:00 AM on Sun 21 Dec 25 and finishing 11:59 PM on Thu 30 Apr 26 - wall repairs
|
|
Start date:
|
Sunday, 21/12/25
|
End date:
|
Thursday, 30/04/26
|
Timing:
All Day
|
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LOWER VAUVERT
|
( TRINITY SQUARE to CONTREE MANSELL )
|
|
Description:
|
Work starting 08:30 AM on Wed 11 Mar 26 and finishing 05:00 PM on Mon 16 Mar 26 - Upgrade existing water main
|
|
Start date:
|
Wednesday, 11/03/26
|
End date:
|
Monday, 16/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Vauvert 1B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MILL STREET
|
|
|
Description:
|
Work starting 08:00 AM on Fri 02 Jan 26 and finishing 05:00 PM on Sun 22 Mar 26 - Relay 3` iron/asbestos main
|
|
Start date:
|
Friday, 02/01/26
|
End date:
|
Sunday, 22/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Vauvert PS 1A
|
Cycle Access:
|
No
|
|
ST. PETER PORT - VALNORD LANE
|
( VALNORD ESTATE to GREEN LANES )
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 23 Jun 25 and Mon 04 May 26 - Delivery of building materials.
|
|
Start date:
|
Monday, 23/06/25
|
End date:
|
Monday, 04/05/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Hillstone Guernsey Ltd
|
Contractor:
|
Hillstone Guernsey Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - ROUTE DU TERTRE; RUE DE LA MASSE to LES QUERITES
|
( RUE DE LA MASSE to LES QUERITES )
|
|
Description:
|
Repair and rebuild road side wall
|
|
Start date:
|
Monday, 09/03/26
|
End date:
|
Friday, 12/06/26
|
Timing:
All Day
|
|
Promoter:
|
Fixt Ltd
|
Contractor:
|
Fixt Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - LA GRANDE MAISON ROAD
|
( PLEINHEAUME ROAD to LES HAUTS COURTILS ROAD )
|
|
Description:
|
Repair to roadside wall
|
|
Start date:
|
Tuesday, 03/03/26
|
End date:
|
Wednesday, 18/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
LV 1B; LV 8A; SS 1B
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - RUE COHU
|
|
|
Description:
|
Work starting 08:00 AM on Mon 09 Mar 26 and finishing 05:00 PM on Fri 20 Mar 26 - Rebuilding roadside wall.
|
|
Start date:
|
Monday, 09/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Keystone Masonry
|
Contractor:
|
Keystone Masonry
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; LMDC 7A; SS 4A; SS 4B; P2;41;42;N2
|
Cycle Access:
|
Yes
|
|
FOREST - LE BOURG
|
|
|
Description:
|
Investigation
|
|
Start date:
|
Wednesday, 25/02/26
|
End date:
|
Thursday, 26/03/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - ROUTE DES TALBOTS
|
( LES PETITES VALLEES to RUE DU TORVAL )
|
|
Description:
|
Tree Surgery
|
|
Start date:
|
Friday, 20/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
|
Bus Routes Affected:
|
LB 4A
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - ROHAIS DE HAUT
|
|
|
Description:
|
Work starting 08:00 AM on Tue 17 Mar 26 and finishing 04:00 PM on Fri 17 Apr 26 - Road resurfacing
|
|
Start date:
|
Tuesday, 17/03/26
|
End date:
|
Friday, 17/04/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
Castel 1A; Castel 1B; St Martin 1A; LB 1B; LV 3B; LV 4B; P2
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - IVY CASTLE LANE
|
|
|
Description:
|
Drainage Cleaning and CCTV
|
|
Start date:
|
Friday, 20/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
Amherst PS 1A;SS HS 4A
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LES COTILS
|
( LES AMBALLES to BEAUREGARD LANE )
|
|
Description:
|
House move
|
|
Start date:
|
Wednesday, 18/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
R and R Removals
|
Contractor:
|
R and R Removals
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - MANSELL STREET; BACK STREET to CONTREE CROIX MANSELL
|
( BACK STREET to CONTREE CROIX MANSELL )
|
|
Description:
|
Service alteration
|
|
Start date:
|
Saturday, 14/03/26
|
End date:
|
Monday, 16/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vauvert PS 1A
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - THE QUAY
|
|
|
Description:
|
Crane lift
|
|
Start date:
|
Sunday, 15/03/26
|
End date:
|
Sunday, 15/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
AFM
|
Contractor:
|
AFM
|
|
Bus Routes Affected:
|
11;12;13;21;31;32;41;42;52;60;61;71;81;91;N1;N2;N4
|
Cycle Access:
|
No
|
|
ST. PIERRE DU BOIS - ROUTE DES CLOS LANDAIS
|
( RUE DE LA FLAGUEE to RUE DES MASSIES )
|
|
Description:
|
Drainage works
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Monday, 23/03/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Houguette 1B; Houguette 3B; Houguette 4A; LMDC 3A / LB 8A; LMDC 3B / LB 8B; 60;N4
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - RUE DES PRES
|
|
|
Description:
|
Erect Scaffolding; Property: Le Pre; Purpose: Roofing Works
|
|
Start date:
|
Wednesday, 18/03/26
|
End date:
|
Thursday, 19/03/26
|
Timing:
All Day
|
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
|
Bus Routes Affected:
|
Houguette PS 1A
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - LES CANUS
|
( LES ABREUVEURS ROAD to LA ROUTE DES CAPELLES )
|
|
Description:
|
unloading container
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Tuesday, 17/03/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
Vauvert PS 1A;SS HS 2B;SS HS 7B
|
Cycle Access:
|
Yes
|
|
ST. SAVIOUR - LA RUE DU HAMEL
|
|
|
Description:
|
Low voltage cabling and service upgrade
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Friday, 05/06/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
|
Bus Routes Affected:
|
Houguette PS 1B;Houguette PS 3B;LBHS 5A;LBHS 5B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A
|
Cycle Access:
|
Dismount past works
|
|
ST. SAVIOUR - RUE DES BOULAINS
|
( RUE DES GRANTEZ to RUE DES FAUXQUETS )
|
|
Description:
|
Tree Surgery
|
|
Start date:
|
Wednesday, 18/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
treeworks
|
Contractor:
|
treeworks
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - LA GRANDE RUE
|
|
|
Description:
|
Works to driveway at `Blaenwern`
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
SS 5A; SS 5B; 11;12;N1
|
Cycle Access:
|
Yes
|
|
VALE - LA ROUTE DU BRAYE
|
( LA BAILLOTERIE LANE to LA ROUTE MILITAIRE )
|
|
Description:
|
Repair manhole covers
|
|
Start date:
|
Saturday, 14/03/26
|
End date:
|
Sunday, 15/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Vale 2B; Vale 3B; SS 2B; P2;12;13;N1
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - TOWER HILL
|
|
|
Description:
|
Work starting 08:00 AM on Mon 16 Mar 26 and finishing 04:30 PM on Tue 17 Mar 26 - Splicing Work
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Tuesday, 17/03/26
|
Timing:
All Day
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - Chertsey House Dental 5K Race
|
( LA JAONNEUSE ROAD to MONT CUET ROAD )
|
|
Description:
|
Event between 7am and 12pm
|
|
Start date:
|
Sunday, 15/03/26
|
End date:
|
Sunday, 15/03/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - LA NEUVE RUE; RUE D'ALBECQ to COBO COAST ROAD
|
( RUE D'ALBECQ to COBO COAST ROAD )
|
|
Description:
|
Road side patch repair
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Monday, 16/03/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. MARTIN - LA ROUTE DES CORNUS
|
( LA RUE MAZE to LA PLANQUE LANE )
|
|
Description:
|
Driveway works
|
|
Start date:
|
Monday, 16/03/26
|
End date:
|
Friday, 20/03/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
St Martin 1A; St Martin 1B; LB 2B; LB 4B; LB 9B; LMDC 4A; LV 4A; 81;91;92;93;94;95;N3
|
Cycle Access:
|
Yes
|