Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DE LA MASSE
|
|
Description:
|
High voltage cable upgrade
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Tuesday, 03/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Mon 30 Sep 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Monday, 30/09/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LA QUERRIERE
|
|
Description:
|
Scaffolding; Property: De Bertrands ; Purpose: Access
|
Start date:
|
Thursday, 27/06/24
|
End date:
|
Tuesday, 20/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LONG TRAC
|
|
Description:
|
Work starting 12:00 AM on Mon 08 Jul 24 and finishing 05:00 PM on Fri 09 Aug 24 - Low voltage cable upgrade
|
Start date:
|
Monday, 08/07/24
|
End date:
|
Friday, 09/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DE VARIVARY
|
( STEAM MILL LANE to LES HUBITS )
|
Description:
|
Work starting 07:00 AM on Fri 26 Jul 24 and finishing 05:00 PM on Mon 29 Jul 24 - service alteration
|
Start date:
|
Friday, 26/07/24
|
End date:
|
Monday, 29/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BACK STREET
|
|
Description:
|
Scaffolding ; Property: No 3; Purpose: Demolition / New Build
|
Start date:
|
Friday, 08/03/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - CLIFF STREET
|
( LOWER HAUTEVILLE to THE STRAND )
|
Description:
|
Removal of scaffolding
|
Start date:
|
Friday, 26/07/24
|
End date:
|
Saturday, 27/07/24
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - DOYLE ROAD
|
( BROCK ROAD to GRANGE ROAD )
|
Description:
|
Work starting 08:00 AM on Wed 15 May 24 and finishing 05:00 PM on Wed 30 Oct 24 - Low voltage network upgrade, pillar installation and high voltage duct lay
|
Start date:
|
Wednesday, 15/05/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Work starting 10:00 AM on Mon 02 Oct 23 and finishing 04:00 PM on Mon 30 Sep 24 - Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
|
Start date:
|
Monday, 02/10/23
|
End date:
|
Monday, 30/09/24
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - MANSELL STREET
|
|
Description:
|
Scaffolding for roofing works; Property: 4 Mansell St (Art for Guernsey); Purpose: Roofing Works
|
Start date:
|
Monday, 08/07/24
|
End date:
|
Monday, 29/07/24
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - MOUNT ROW
|
|
Description:
|
Work starting 07:00 AM on Sat 27 Jul 24 and finishing 05:00 PM on Thu 08 Aug 24 - High and low voltage cable upgrade
|
Start date:
|
Saturday, 27/07/24
|
End date:
|
Thursday, 08/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
60, 61, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MOUNT ROW
|
|
Description:
|
Work starting 07:00 AM on Mon 10 Jun 24 and finishing 05:00 PM on Fri 20 Sep 24 - High and low voltage infrastructure upgrade
|
Start date:
|
Monday, 10/06/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
P2, 60, 61, 71
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ROSAIRE AVENUE
|
( BROCK ROAD to DALGAIRNS ROAD )
|
Description:
|
Work starting 07:00 AM on Fri 26 Jul 24 and finishing 11:59 PM on Wed 31 Jul 24 - Install new services
|
Start date:
|
Friday, 26/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffolding ; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Monday, 22/04/24
|
End date:
|
Saturday, 31/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPLAND ROAD
|
|
Description:
|
Work starting 07:00 AM on Sat 06 Jul 24 and finishing 05:00 PM on Mon 12 Aug 24 - Upgrade water main and services
|
Start date:
|
Saturday, 06/07/24
|
End date:
|
Monday, 12/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES BREHAUTS
|
|
Description:
|
Work starting 08:00 AM on Mon 22 Jul 24 and finishing 11:59 PM on Fri 09 Aug 24 - Chamber and duct installations
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Friday, 09/08/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
61
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES HECHES
|
|
Description:
|
Work starting 08:00 AM on Mon 22 Jul 24 and finishing 04:00 PM on Fri 02 Aug 24 - Chamber and duct installation
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Friday, 02/08/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DU DOUIT DU MOULIN
|
|
Description:
|
Completion of surfacing works earlier this year that were postponed due to excessive ground water
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Friday, 02/08/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAMPSON - LES SALINES ROAD
|
|
Description:
|
Work starting 08:00 AM on Fri 19 Jul 24 and finishing 05:00 PM on Mon 19 Aug 24 - Chamber and duct installation
|
Start date:
|
Friday, 19/07/24
|
End date:
|
Monday, 19/08/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE MILITAIRE
|
|
Description:
|
Install new foul sewer and services
|
Start date:
|
Monday, 15/07/24
|
End date:
|
Sunday, 28/07/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
21
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - RUE DES POINTUES ROCQUES
|
( ROUTE ST. CLAIR to RUE DES MONTS )
|
Description:
|
Road closure to erect scaffolding
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Monday, 12/08/24
|
Timing:
All Day
|
Promoter:
|
Elevations
|
Contractor:
|
Elevations
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DU MONT SAINT
|
( RUE DES HURIAUX to LE MONT SAINT )
|
Description:
|
Work starting 07:00 AM on Thu 16 May 24 and finishing 05:00 PM on Mon 23 Sep 24 - Site compound
|
Start date:
|
Thursday, 16/05/24
|
End date:
|
Monday, 23/09/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - PORT SOIF LANE
|
( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
|
Description:
|
Work starting 07:00 AM on Mon 15 Jul 24 and finishing 05:00 PM on Mon 05 Aug 24 - Foul water sewer upgrade works
|
Start date:
|
Monday, 15/07/24
|
End date:
|
Monday, 05/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DU PONT VAILLANT; VERTE RUE to PONT VAILLANT ESTATE
|
( VERTE RUE to PONT VAILLANT ESTATE )
|
Description:
|
Install new water service
|
Start date:
|
Friday, 26/07/24
|
End date:
|
Monday, 29/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
No current major delays due to one ways
CASTEL - RUE COHU; ROUTE DE SAUMAREZ to RUE DU FRIQUET
|
( ROUTE DE SAUMAREZ to RUE DU FRIQUET )
|
Description:
|
Repair Road side wall
|
Start date:
|
Monday, 22/07/24
|
End date:
|
Sunday, 28/07/24
|
Timing:
All Day
|
Promoter:
|
Keystone Masonry
|
Contractor:
|
Keystone Masonry
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DE LA SALINE
|
|
Description:
|
Work starting 08:00 AM on Mon 11 Mar 24 and finishing 05:00 PM on Sun 11 Aug 24 - Repointing of seawall at La Saline - roadside compound and working area / pedestrian footway - traffic control by temporary traffic signals.
|
Start date:
|
Monday, 11/03/24
|
End date:
|
Sunday, 11/08/24
|
Timing:
All Day
|
Promoter:
|
Property Services
|
Contractor:
|
Property Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - GRANGE ROAD
|
|
Description:
|
Repair failed manhole cover
|
Start date:
|
Saturday, 27/07/24
|
End date:
|
Sunday, 28/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - VAUVERT; NEW PLACE to GEORGE STREET
|
( NEW PLACE to GEORGE STREET )
|
Description:
|
Specialist team from UK to carry out seek and repair on 18 inch gas main, as opposed to digging on main junction at Victoria Road. Excavation for camera insert outside No; 11, Maison De Ville Apartments, Vauvert. Signal lights and signage to control traffic.
|
Start date:
|
Thursday, 25/07/24
|
End date:
|
Thursday, 01/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - ROUTE DE CARTERET
|
( RUE DE BOUVERIE to LES GENATS ESTATE )
|
Description:
|
Road closure due to Tree work
|
Start date:
|
Tuesday, 30/07/24
|
End date:
|
Tuesday, 30/07/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
42
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DE LA PERRUQUE
|
( RUE DES CAUVAINS to LES VIEUX BEAUCAMPS )
|
Description:
|
Cable splicing
|
Start date:
|
Tuesday, 30/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DES EFFARDS
|
( QUEUX LANE to LES LANDELLES )
|
Description:
|
Cable splicing
|
Start date:
|
Thursday, 01/08/24
|
End date:
|
Friday, 02/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
EADBL Seafront Sunday
|
|
Description:
|
EADBL Seafront Sunday
|
Start date:
|
Sunday, 28/07/24
|
End date:
|
Sunday, 28/07/24
|
Timing:
All Day
|
Promoter:
|
SOG Sport and Culture
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
11, 12, 13, 21, 31, 32, 41, 42, 51, 52, 60, 61, 71, 81, 92, N1, N2
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LA BRIGADE
|
( LES VAURIOUFS to LES MAUXMARQUIS (ROUTE DE ST. AND )
|
Description:
|
Work starting 09:15 AM on Fri 02 Aug 24 and finishing 11:00 PM on Fri 02 Aug 24 - Sewer Rehabilitation (Part 2.1)
|
Start date:
|
Friday, 02/08/24
|
End date:
|
Friday, 02/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LA BRIGADE
|
|
Description:
|
Sewer Rehabilitation (Part 2.2)
|
Start date:
|
Saturday, 03/08/24
|
End date:
|
Sunday, 04/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
P2, 60, 61
|
Cycle Access:
|
Yes
|
ST. ANDREW - RUE DE LA BOULLERIE
|
|
Description:
|
Work starting 07:00 AM on Tue 30 Jul 24 and finishing 06:00 PM on Thu 01 Aug 24 - Sewer Rehabilitation
|
Start date:
|
Tuesday, 30/07/24
|
End date:
|
Thursday, 01/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUETTE DES FOSSES
|
( LES HURETTES to LA RUETTE )
|
Description:
|
Access chamber to connect new fibres
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
All Day
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - FOSSE ANDRE
|
|
Description:
|
Work starting 07:00 AM on Tue 30 Jul 24 and finishing 05:00 PM on Sun 04 Aug 24 - Sewer Rehabilitation
|
Start date:
|
Tuesday, 30/07/24
|
End date:
|
Sunday, 04/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Guernsey Kart and Motor Club LBG (GK&MC) - Hill Climb
|
( Castle Emplacement to Fort Road )
|
Description:
|
Guernsey Kart and Motor Club LBG (GKandMC) - Hill Climb
|
Start date:
|
Saturday, 03/08/24
|
End date:
|
Saturday, 03/08/24
|
Timing:
All Day
|
Promoter:
|
GKMC - Guernsey Kart and Motor Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - KINGS ROAD
|
( MOUNT ROW to RUE A L'OR )
|
Description:
|
Noisy Cover needs reseating, should only be 30mins
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Monday, 29/07/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - MOUNT DURAND
|
( PRINCE ALBERT ROAD to VALNORD ROAD )
|
Description:
|
Fibre duct pull
|
Start date:
|
Saturday, 03/08/24
|
End date:
|
Saturday, 03/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - NEW PARIS ROAD
|
( PIETTE ROAD to PARIS STREET )
|
Description:
|
Road closure - New Paris Road
|
Start date:
|
Wednesday, 31/07/24
|
End date:
|
Saturday, 31/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
R and R Removals
|
Contractor:
|
R and R Removals
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Olls Gallery Launch Party
|
( MANSELL COURT to BACK STREET )
|
Description:
|
Olls Gallery Launch Party 2 Contree Mansell
|
Start date:
|
Friday, 02/08/24
|
End date:
|
Friday, 02/08/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Olls
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - Rocquaine Regatta 2024
|
|
Description:
|
Rocquaine Regatta 2024
|
Start date:
|
Saturday, 27/07/24
|
End date:
|
Saturday, 27/07/24
|
Timing:
All Day
|
Promoter:
|
Rocquaine Regatta Committee
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
61, 71, 91, 92, 93, 94, N3
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE QUANTERAINE
|
( RUE DU BORDAGE to ROUTE DES SAGES )
|
Description:
|
Tree Surgery Works
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Tuesday, 30/07/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DES BREHAUTS
|
( RUE DES BUTTES to RUE DES RAIES )
|
Description:
|
SERVICE ALTERATION
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES BUTTES
|
( RUE DE L'EGLISE to RUE DES BREHAUTS )
|
Description:
|
service alteration
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - BAUBIGNY ROAD
|
|
Description:
|
Excavations for high voltage cable upgrade (Phase 4)
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Friday, 23/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
21
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - RUE DES POINTUES ROCQUES
|
( ROUTE ST. CLAIR to RUE DES MONTS )
|
Description:
|
service alteration
|
Start date:
|
Wednesday, 31/07/24
|
End date:
|
Friday, 02/08/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DE LA HOUGUE MABAN
|
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Friday, 16/08/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Dismount
|
ST. PETER PORT - LE FOULON; ROUTE ISABELLE to ROHAIS
|
( ROUTE ISABELLE to ROHAIS )
|
Description:
|
Excavate 2 x blocked ducts and node installation
|
Start date:
|
Monday, 29/07/24
|
End date:
|
Wednesday, 31/07/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - Vintage Agricultural Show 2024
|
( Rue De L'Ardaine through Rue Du Camp Massey Brehaut )
|
Description:
|
Vintage Agricultural Show 2024
|
Start date:
|
Saturday, 03/08/24
|
End date:
|
Sunday, 04/08/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
No future major delays due to signals