Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - RUETTE DE LA GENEROTTE ( ROUTE DE COBO to RUETTE DE FRIES )
Description: Rebuilding roadside wall.
Start date: Monday, 06/01/25 End date: Monday, 03/02/25 Timing: Between AM and PM Peaks
Promoter: Adie Exall Stonemason Contractor: Adie Exall Stonemason
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Fri 28 Feb 25 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Friday, 28/02/25 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

Emergency Activity - CASTEL - RUE DE LA RONDE CHEMINEE
Description: Carry out emergency network repair works
Start date: Friday, 17/01/25 End date: Friday, 31/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 41 Cycle Access: Dismount past works

Emergency Activity - ST. MARTIN - LES CAMPS
Description: Work starting 02:00 PM on Mon 20 Jan 25 and finishing 05:00 PM on Thu 06 Feb 25 - Emergency works to repair High voltage cable fault
Start date: Monday, 20/01/25 End date: Thursday, 06/02/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 81;91;93;94;95;N3;LBHS 2A;LV HS 4A;LV HS 4B Cycle Access: No

FOREST - ROUTE DES BLICQS ( LE RUSSEL ROAD to LES BLICQS LANE )
Description: New supply line
Start date: Tuesday, 21/01/25 End date: Thursday, 23/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LA BELLIEUSE
Description: Work starting 08:30 AM on Mon 13 Jan 25 and finishing 05:00 PM on Mon 03 Feb 25 - Relay approx. 200 meters of new water main
Start date: Monday, 13/01/25 End date: Monday, 03/02/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: No

ST. MARTIN - LE ROCHER ( LES AUBRETS to LA FOSSE DE BAS )
Description: Work starting 08:00 AM on Mon 13 Jan 25 and finishing 05:00 PM on Wed 22 Jan 25 - Excavate, clear and rod blocked ducts
Start date: Monday, 13/01/25 End date: Wednesday, 22/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LES HURETTES
Description: Work starting 07:00 AM on Mon 06 Jan 25 and finishing 05:00 PM on Wed 12 Feb 25 - High and low voltage cable installation, jointing and fibre duct pull
Start date: Monday, 06/01/25 End date: Wednesday, 12/02/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - HAVILLAND STREET ( GRANGE ROAD to ALLEZ STREET )
Description: Excavate blocked duct
Start date: Monday, 20/01/25 End date: Tuesday, 21/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET
Description: Work starting 08:00 AM and finishing 05:00 PM daily between Wed 16 Oct 24 and Fri 07 Mar 25 - Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Friday, 07/03/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BOUET
Description: Work starting 08:00 AM and finishing 11:59 PM daily between Wed 16 Oct 24 and Sun 30 Mar 25 - Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Sunday, 30/03/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LES PETITES FONTAINES ( MOUNT HERMON to VALNORD ROAD )
Description: Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Fri 31 Jan 25 - wall repairs
Start date: Friday, 22/11/24 End date: Friday, 31/01/25 Timing: All Day
Promoter: TNT Stonemasons Contractor: TNT Stonemasons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES VAUXLAURENS
Description: Scaffolding; Property: No 1 St Julians Avenue; Purpose: Roofing Works
Start date: Friday, 29/11/24 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES VAUXLAURENS
Description: Scaffold to access for emergency works from storm damage; Property: Apartments 4 and 29 St Julians Avenue; Purpose: Roofing Works
Start date: Friday, 29/11/24 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LOWER CANICHERS ( LE TRUCHOT to DOYLE STREET )
Description: Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
Start date: Monday, 30/09/24 End date: Monday, 28/04/25 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LOWER POLLET ( ST. JULIAN'S WEIGHBRIDGE to LA TOURGAND )
Description: Work starting 08:00 AM on Mon 20 Jan 25 and finishing 05:00 PM on Wed 22 Jan 25 - Chamber installation
Start date: Monday, 20/01/25 End date: Wednesday, 22/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
Start date: Wednesday, 10/07/24 End date: Saturday, 12/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE LIHOU ( RUE DU LONGFRIE to RUE DES GRANDES RUES )
Description: Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Sat 15 Mar 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
Start date: Thursday, 29/08/24 End date: Saturday, 15/03/25 Timing: All Day
Promoter: Traffic and Highways Contractor: Traffic and Highways
Bus Routes Affected: Cycle Access: No

ST. PIERRE DU BOIS - ROUTE DU LONGFRIE
Description: Work starting 07:30 AM on Mon 20 Jan 25 and finishing 04:00 PM on Fri 31 Jan 25 - Road resurfacing
Start date: Monday, 20/01/25 End date: Friday, 31/01/25 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: 60;71;93;94;N3;N4 Cycle Access: Dismount past works

ST. SAMPSON - SANDY LANE
Description: Low voltage cabling and service upgrades
Start date: Monday, 20/01/25 End date: Friday, 21/02/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: P2;13;21;N1;Capelles PS 2B;LV HS 1B;LV HS 8A;SS HS 1A;SS HS 1B Cycle Access: Yes, in direction of one-way

ST. SAVIOUR - LES TRANQUESOUS ( RUE DES BOULAINS to RUE DES CACHES )
Description: Node installation 9am - 4pm daily
Start date: Tuesday, 21/01/25 End date: Thursday, 23/01/25 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - ROUTE DE SOUS L`EGLISE
Description: Chamber and duct installations
Start date: Thursday, 02/01/25 End date: Monday, 27/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: N4;Houguette PS 2B;Houguette PS 4B;LMDC HS 3A;LMDC HS 3B;LV HS 5A;LMDC HS LB HS 3A;LMDC HS LB HS 3B;LV HS LB HS 5A;LV HS LB HS 5B Cycle Access: Dismount past works

ST. SAVIOUR - RUE DES ISSUES
Description: Fibre cable installations
Start date: Tuesday, 21/01/25 End date: Tuesday, 21/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

TORTEVAL - RUE DES JEHANS
Description: Work starting 07:30 AM on Mon 20 Jan 25 and finishing 04:00 PM on Fri 07 Feb 25 - Road resurfacing
Start date: Monday, 20/01/25 End date: Friday, 07/02/25 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
CASTEL - RUE DU FRIQUET
Description: Alteration to network control box
Start date: Monday, 20/01/25 End date: Tuesday, 21/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: P2 Cycle Access: No

Emergency Activity - ST. PETER PORT - QUEENS ROAD
Description: Work starting 05:55 PM on Mon 20 Jan 25 and finishing 05:00 PM on Tue 21 Jan 25 - Emergency Works - Streetlight Damage
Start date: Monday, 20/01/25 End date: Tuesday, 21/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 60;61;71;81;N4;Forest PS 2B;St Martin PS 1A Cycle Access: Dismount past works

Signals
CASTEL - ROUTE DE COBO
Description: Rebuilding roadside wall.
Start date: Monday, 13/01/25 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Granite Le Pelley Contractor: Granite Le Pelley
Bus Routes Affected: Cycle Access: Yes

CASTEL - ROUTE DE COBO
Description: Rebuilding roadside wall.
Start date: Monday, 13/01/25 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Granite Le Pelley Contractor: Granite Le Pelley
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - FORT ROAD; LE VAL DES TERRES to CROUTES HAVILLAND ( LE VAL DES TERRES to CROUTES HAVILLAND )
Description: Supply line upgrade
Start date: Monday, 20/01/25 End date: Thursday, 23/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES BANQUES
Description: Work starting 05:00 AM on Mon 13 Jan 25 and finishing 05:00 PM on Tue 28 Jan 25 - repair of sea defences
Start date: Monday, 13/01/25 End date: Tuesday, 28/01/25 Timing: All Day
Promoter: States Property Services Contractor: States Property Services
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES GRAVEES; ROCQUETTES LANE to YORK AVENUE ( ROCQUETTES LANE to YORK AVENUE )
Description: Work starting 09:00 AM and finishing 05:00 PM daily between Mon 13 Jan 25 and Sun 09 Mar 25 - Repairs to roadside wall
Start date: Monday, 13/01/25 End date: Sunday, 09/03/25 Timing: Between AM and PM Peaks
Promoter: J W Rihoy Builders Contractor: J W Rihoy Builders
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - RUE DE LA HAYE ( RUE DES CACHES to RUE DES GRANTEZ )
Description: Node installation 8am - 4pm daily
Start date: Thursday, 23/01/25 End date: Friday, 24/01/25 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUE DE LA VIEILLE MARE
Description: supply line alteration
Start date: Monday, 27/01/25 End date: Wednesday, 29/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 42;60;Castel PS 2A;LMDC HS LB HS 3B Cycle Access: Dismount past works

CASTEL - RUE DU FRIQUET ( LES BAISSIERES to ROUTE DE COBO )
Description: Work starting 07:00 AM on Mon 27 Jan 25 and finishing 05:00 PM on Fri 31 Jan 25 - Install new water service
Start date: Monday, 27/01/25 End date: Friday, 31/01/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: P2;51;52;LMDC HS 5A;LMDC HS 5B;LMDC HS 6B;SS HS 8A;SS HS 8B Cycle Access: Dismount past works

CASTEL - RUE DU FRIQUET
Description: Work starting 07:00 AM on Wed 22 Jan 25 and finishing 05:00 PM on Mon 10 Feb 25 - INSTALL NEW SEWER and SERVICES
Start date: Wednesday, 22/01/25 End date: Monday, 10/02/25 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: P2;51;52;LMDC HS 5A;LMDC HS 5B;LMDC HS 6B;SS HS 8A;SS HS 8B Cycle Access: Dismount past works

CASTEL - RUE DU FRIQUET; LES BAISSIERES to ROUTE DE COBO ( LES BAISSIERES to ROUTE DE COBO )
Description: Install telecoms connection to new site (to coincide with existing closure)
Start date: Monday, 27/01/25 End date: Monday, 03/02/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: P2;51;52;LMDC HS 5A;LMDC HS 5B;LMDC HS 6B;SS HS 8A;SS HS 8B Cycle Access: Dismount past works

ST. ANDREW - LES MAUXMARQUIS (ROUTE DE ST. ANDRE) ( ROUTE DE LA CROIX AU BAILIFF to ROUTE DE ST. ANDRE )
Description: Tree surgery works.
Start date: Tuesday, 28/01/25 End date: Wednesday, 29/01/25 Timing: All Day
Promoter: Spruce Up Contractor: Spruce Up
Bus Routes Affected: 71;N4;St Martin PS 1A;St Martin PS 1B;LB HS 6A;LB HS 6B;LV HS 5A;LV HS 6B;LV HS LB HS 5A;LV HS LB HS 5B Cycle Access: Dismount past works

ST. MARTIN - LES TRAUDES ( LES BLANCHES PIERRES to LES HUBITS )
Description: Work starting 08:00 AM and finishing 04:00 PM - Tree surgery works.
Start date: Friday, 24/01/25 End date: Friday, 24/01/25 Timing: Between AM and PM Peaks
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - RUE DES MARETTES ( LONG TRAC to RUE DES CROUTES )
Description: Chamber and duct installation
Start date: Wednesday, 22/01/25 End date: Sunday, 26/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - SAINTS ROAD ( RUE DES GRONS to ICART ROAD )
Description: supply line upgrade
Start date: Monday, 27/01/25 End date: Thursday, 30/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: LBHS 4A;LV HS 4A;LV HS 4B;LV HS 9B Cycle Access: Dismount past works

ST. PETER PORT - HAUTEVILLE ( PEDVIN STREET to HAVELET )
Description: Work starting 08:00 AM on Mon 27 Jan 25 and finishing 05:00 PM on Tue 28 Jan 25 - Excavation to enable cable installation
Start date: Monday, 27/01/25 End date: Tuesday, 28/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE MARCHANT STREET ( to RUE DU MANOIR )
Description: Work starting 08:00 AM on Mon 27 Jan 25 and finishing 05:00 PM on Mon 03 Feb 25 - Chamber and duct installations
Start date: Monday, 27/01/25 End date: Monday, 03/02/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE POLLET
Description: SCAFFOLDING CAFE EMILIA NOTHING CAN PASS INCLUDING PEDESTRIANS.; Property: CAFE EMILIA; Purpose: External Decoration
Start date: Sunday, 26/01/25 End date: Sunday, 27/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LES VAUXLAURENS ( CAMBRIDGE PARK ROAD to )
Description: Work starting 08:00 AM on Mon 27 Jan 25 and finishing 05:00 PM on Fri 31 Jan 25 - Chamber and duct installation
Start date: Monday, 27/01/25 End date: Friday, 31/01/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - MILL STREET ( MANSELL STREET to PETIT CARRE FOUR )
Description: Crane Lift.
Start date: Sunday, 26/01/25 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: J W Rihoy Builders Contractor: J W Rihoy Builders
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - MOUNT DURAND ( PRINCE ALBERT ROAD to VALNORD ROAD )
Description: Crane lift.
Start date: Monday, 27/01/25 End date: Monday, 27/01/25 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND ( CLIFF STREET to HAVELET )
Description: Household removal.
Start date: Tuesday, 28/01/25 End date: Wednesday, 29/01/25 Timing: Between AM and PM Peaks
Promoter: White and Company Contractor: White and Company
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UNION STREET ( ALLEZ STREET to ST. JOHN STREET )
Description: Crane lift
Start date: Sunday, 26/01/25 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Bob Froome and Sons Contractor: Bob Froome and Sons
Bus Routes Affected: Cycle Access: No:

ST. SAMPSON - DELANCEY LANE; LES BAS COURTILS ROAD to CAMP CODE LANE ( LES BAS COURTILS ROAD to CAMP CODE LANE )
Description: Repair water leak
Start date: Wednesday, 22/01/25 End date: Friday, 24/01/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Vale PS 2B;Vale PS 3B;LV HS 1A;LV HS 1B;LV HS 2B;SS HS 2A;SS HS 2B;SS HS 3A;SS HS 3B;SS HS 7B Cycle Access: Dismount past works

TORTEVAL - RUE DE L`AITTE ( RUE COLLAS SIMON to )
Description: supply line upgrade
Start date: Thursday, 23/01/25 End date: Monday, 27/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. PETER PORT - CANDIE ROAD; BROCK ROAD to CAMBRIDGE PARK ROAD ( BROCK ROAD to CAMBRIDGE PARK ROAD )
Description: Chamber and duct installations
Start date: Monday, 27/01/25 End date: Friday, 07/02/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

Signals
ST. SAMPSON - LE GRAND FORT ROAD; LES PETITES CAPELLES ROAD to ROUTE CARRE ( LES PETITES CAPELLES ROAD to ROUTE CARRE )
Description: Concrete pump.
Start date: Monday, 27/01/25 End date: Monday, 27/01/25 Timing: Between AM and PM Peaks
Promoter: Flint Carver Carpentry Contractor: Flint Carver Carpentry
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - RUE DES COTTES; PLEINHEAUME ROAD to ROUTE DE LA PASSEE ( PLEINHEAUME ROAD to ROUTE DE LA PASSEE )
Description: Cable installation and splicing
Start date: Thursday, 23/01/25 End date: Thursday, 23/01/25 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes