Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DU PRESBYTERE
|
|
Description:
|
Drainage Repairs
|
Start date:
|
Sunday, 01/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 51
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DU PRESBYTERE
|
|
Description:
|
Install new water mains
|
Start date:
|
Monday, 11/11/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 51, 52
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - ST. PETER PORT - ROUGE RUE
|
|
Description:
|
To repair an Electrical Fault
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
Emergency Activity - VALE - LES ROCQUES BARREES ROAD
|
|
Description:
|
To Repair An Electrical Fault
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
11, 91, 92
|
Cycle Access:
|
Dismount past works
|
FOREST - LA RUE DES CROISEE
|
( LES MESSURIERS to LE BOURG )
|
Description:
|
Work starting 08:00 AM on Mon 25 Nov 24 and finishing 11:59 PM on Tue 03 Dec 24 - Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LES REBOUQUETS
|
|
Description:
|
Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 20 Dec 24 - High and low voltage cable upgrade and duct lay
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. ANDREW - ROUTE DE ST. ANDRE
|
|
Description:
|
Tree surgery and pole replacement
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUETTE DU NAVET
|
( ICART ROAD to SAINTS BAY ROAD )
|
Description:
|
Work starting 08:00 AM on Tue 26 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Chamber installation
|
Start date:
|
Tuesday, 26/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUETTE DU NAVET
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CAMPS DU MOULIN
|
|
Description:
|
Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Replace access cover on Camps du Moulin
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CAMPS DU MOULIN
|
( RUE JACQUES GUILLE to RUE DE LA VALLEE )
|
Description:
|
Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Install new water services
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE POUDREUSE
|
|
Description:
|
Work starting 07:00 AM on Wed 27 Nov 24 and finishing 05:00 PM on Wed 04 Dec 24 - Undertake road surface repairs
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX
|
( RUE CAUCHEZ to LES FRIETEAUX )
|
Description:
|
Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Replace 2 x failing chamber covers
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Monday, 02/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX
|
( RUE CAUCHEZ to LES FRIETEAUX )
|
Description:
|
Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Wed 04 Dec 24 - Repair failed reinstatements around water meters
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
|
Start date:
|
Tuesday, 01/10/24
|
End date:
|
Friday, 17/01/25
|
Timing:
All Day
|
Promoter:
|
Bob Froome and Sons
|
Contractor:
|
Bob Froome and Sons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Thursday, 16/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Fri 31 Jan 25 - wall repairs
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Friday, 31/01/25
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES VAUXLAURENS
|
|
Description:
|
Scaffold to access for emergency works from storm damage; Property: Apartments 4 and 29 St Julians Avenue; Purpose: Roofing Works
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Sunday, 26/01/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - NEW PLACE
|
( VICTORIA ROAD to VAUVERT )
|
Description:
|
Erecting scaffolding.
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Thursday, 12/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - RUE A L`OR
|
( RICHMOND AVENUE to KINGS ROAD )
|
Description:
|
Rue a L`Or substation installation and high voltage cable upgrade (Phase 1)
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Sat 15 Mar 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Saturday, 15/03/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - ROUTE DES SAGES
|
|
Description:
|
Work starting 07:30 AM on Mon 25 Nov 24 and finishing 04:00 PM on Fri 13 Dec 24 - Road resurfacing
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
61
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE ST PIERRE
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LES MARTINS
|
( RUE SAUVAGE to LES TRACHERIES ROAD )
|
Description:
|
Work starting 07:00 AM on Fri 29 Nov 24 and finishing 05:00 PM on Tue 03 Dec 24 - Repair existing cover and frame
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LES MARTINS
|
|
Description:
|
Low voltage cable upgrade
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LOWLANDS ROAD
|
( to SALTPANS ROAD )
|
Description:
|
new supply line
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LONGUE RUE
|
( LA GRANDE RUE to RUE DES CRABBES )
|
Description:
|
Grit blasting railings.
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Monday, 02/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
C and D Carpenters
|
Contractor:
|
C and D Carpenters
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - RUE DES LONGS CAMPS
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - CARRIERE LANE
|
( to LA ROUTE DU BRAYE )
|
Description:
|
Low voltage cabling upgrade and new connections
|
Start date:
|
Monday, 18/11/24
|
End date:
|
Wednesday, 18/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - PORT SOIF LANE
|
( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
|
Description:
|
Road reconstruction and resurfacing
|
Start date:
|
Monday, 04/11/24
|
End date:
|
Friday, 20/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DE FRANCAIS
|
( LES MARAIS LANE to RUE DE L'ECOLE )
|
Description:
|
supply line upgrade
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DU MARAIS
|
( ROCQUE BALAN LANE to LES MIELLES ROAD )
|
Description:
|
supply line upgrade
|
Start date:
|
Wednesday, 27/11/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Work starting 07:00 AM on Mon 23 Sep 24 and finishing 05:00 PM on Mon 30 Dec 24 - For construction of 3 flats
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Monday, 30/12/24
|
Timing:
All Day
|
Promoter:
|
Just Build It Ltd
|
Contractor:
|
Just Build It Ltd
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - RUE DE LA SALINE; ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BUS STOP
|
( ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BU )
|
Description:
|
Work starting 08:00 AM on Mon 02 Dec 24 and finishing 05:00 PM on Fri 06 Dec 24 - Investigation and Repair
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DU BRAYE; LES MARES PELLEES to SOHIER ROAD
|
( LES MARES PELLEES to SOHIER ROAD )
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 25 Nov 24 and Wed 11 Dec 24 - Rebuilding roadside wall.
|
Start date:
|
Monday, 25/11/24
|
End date:
|
Wednesday, 11/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
meervelds
|
Contractor:
|
meervelds
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - ROUTE DE CARTERET
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
42
|
Cycle Access:
|
Yes
|
CASTEL - RUE DE LA FOIRE
|
( RUETTE DES EFFARDS to )
|
Description:
|
Splicing joint
|
Start date:
|
Friday, 06/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LE CHEMIN LE ROI
|
|
Description:
|
Fibre duct installation
|
Start date:
|
Tuesday, 03/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - ROUTE DE ST. ANDRE; L'ECLUSE to RUE DE LA BOULLERIE
|
( L'ECLUSE to RUE DE LA BOULLERIE )
|
Description:
|
Brick capping to roadside wall
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Wednesday, 04/12/24
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. ANDREW - ROUTE DES BLICQS
|
|
Description:
|
Work starting 07:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Fri 06 Dec 24 - Drainage Works
|
Start date:
|
Tuesday, 03/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LA RUE MAZE
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Sunday, 08/12/24
|
End date:
|
Sunday, 08/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
81, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES HURETTES
|
|
Description:
|
High and low voltage cable installation, jointing and fibre duct pull
|
Start date:
|
Wednesday, 04/12/24
|
End date:
|
Friday, 31/01/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DE LA VILLETTE
|
|
Description:
|
CCTV camera clean
|
Start date:
|
Thursday, 05/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. MARTIN - SAINTS BAY ROAD
|
( LA MOTTE to LA RUETTE DU NAVET )
|
Description:
|
Chamber installation and repair blocked duct
|
Start date:
|
Monday, 09/12/24
|
End date:
|
Thursday, 12/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - St Martins Christmas Market
|
|
Description:
|
St Martins Christmas Market
|
Start date:
|
Monday, 02/12/24
|
End date:
|
Monday, 02/12/24
|
Timing:
After PM Peak
|
Promoter:
|
Constables of St Martin
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
81, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BROCK ROAD
|
|
Description:
|
Work starting 08:00 AM on Mon 09 Dec 24 and finishing 05:00 PM on Fri 13 Dec 24 - Chamber and duct installations
|
Start date:
|
Monday, 09/12/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - DAMOUETTES LANE
|
|
Description:
|
Site Investigation / Trial Trenches
|
Start date:
|
Monday, 09/12/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES OZOUETS ROAD
|
|
Description:
|
Trial Hole Excavations
|
Start date:
|
Monday, 09/12/24
|
End date:
|
Friday, 13/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ST. PETER PORT - Christmas Late Night Shopping
|
|
Description:
|
Christmas Late Night Shopping
|
Start date:
|
Thursday, 05/12/24
|
End date:
|
Thursday, 05/12/24
|
Timing:
After PM Peak
|
Promoter:
|
Black Vanilla
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UNION STREET
|
( ST. JOHN STREET to LITTLE ST. JOHN STREET )
|
Description:
|
Crane for lifting scaffold beams
|
Start date:
|
Saturday, 07/12/24
|
End date:
|
Saturday, 07/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPLAND ROAD
|
( GRANGE ROAD to MONUMENT GARDENS )
|
Description:
|
Household removal.
|
Start date:
|
Saturday, 07/12/24
|
End date:
|
Saturday, 07/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
Work starting 09:00 AM and finishing 02:00 PM - Painting gable of house.
|
Start date:
|
Tuesday, 03/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Event Hire Guernsey Ltd
|
Contractor:
|
Event Hire Guernsey Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAMPSON - Bridge Christmas Lights 2024
|
|
Description:
|
Bridge Christmas Lights 2024
|
Start date:
|
Friday, 06/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE RUE
|
|
Description:
|
Work starting 09:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Tue 03 Dec 24 - tree surgery
|
Start date:
|
Tuesday, 03/12/24
|
End date:
|
Tuesday, 03/12/24
|
Timing:
All Day
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - Guernsey Velo Club - Cyclocross
|
|
Description:
|
Guernsey Velo Club - Cyclocross
|
Start date:
|
Sunday, 08/12/24
|
End date:
|
Sunday, 08/12/24
|
Timing:
Before AM Peak
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
TORTEVAL - RUE DES BROUARDS
|
( RUE GENETTE to )
|
Description:
|
Removal of earth bank.
|
Start date:
|
Monday, 09/12/24
|
End date:
|
Wednesday, 18/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Alabaster Austin Construction
|
Contractor:
|
Alabaster Austin Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - Bridge Christmas Lights 2024
|
|
Description:
|
Bridge Christmas Lights 2024
|
Start date:
|
Friday, 06/12/24
|
End date:
|
Friday, 06/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LES ROUVETS ROAD
|
( RUE DES ANNEVILLES to RUE DES MARAIS )
|
Description:
|
Work starting 07:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Thu 05 Dec 24 - service alteration
|
Start date:
|
Tuesday, 03/12/24
|
End date:
|
Thursday, 05/12/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - Winter Wonderland - Rue Des Issues & Rue Au Page
|
|
Description:
|
Winter Wonderland - Rue Des Issues and Rue Au Page
|
Start date:
|
Wednesday, 04/12/24
|
End date:
|
Thursday, 05/12/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Lions Club Guernsey
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Yes, in direction of one-way
|
No future major delays due to signals