Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - ROUTE DE L`EGLISE
Description: Work starting 04:00 PM on Mon 19 May 25 and finishing 11:59 PM on Wed 23 Jul 25 - Lay new water transfer main
Start date: Monday, 19/05/25 End date: Wednesday, 23/07/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Castel 1B; LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LV 3B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61 Cycle Access: Dismount past works

CASTEL - ROUTE DE L`EGLISE ( RUE DU PREEL to RUETTE DE TOUILLETS )
Description: Work starting 08:00 AM on Tue 15 Jul 25 and finishing 05:00 PM on Sun 03 Aug 25 - Urgent repairs to foul water manhole chambers
Start date: Tuesday, 15/07/25 End date: Sunday, 03/08/25 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: Castel 1B; LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LV 3B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61 Cycle Access: Dismount past works

CASTEL - ROUTE DE LA HOUGUE DU POMMIER; ROUTE DE CARTERET to LES GENATS ESTATE
Description: Repair manhole cover & frame
Start date: Saturday, 19/07/25 End date: Sunday, 20/07/25 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: LMDC 6A / LV 6A; SS 8A; SS 8B; 41;N2 Cycle Access: Dismount past works

CASTEL - RUE DES MORTS ( RUE DU FRIE PLAIDY to RUE DU PREEL )
Description: Work starting 07:30 AM on Thu 10 Jul 25 and finishing 05:00 PM on Wed 23 Jul 25 - Close the road to allow the lorry and machine enough room to operate on Route De L`Eglise
Start date: Thursday, 10/07/25 End date: Wednesday, 23/07/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:30 PM on Sun 31 Aug 25 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Sunday, 31/08/25 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

CASTEL - SOUS LES COURTILS; ROUTE DE LA MARE to RUE D'ALBECQ ( ROUTE DE LA MARE to RUE D'ALBECQ )
Description: To replace a faulty Sub Station, and replacement of High Voltage Cable.
Start date: Monday, 19/05/25 End date: Monday, 11/08/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Castel 2A; Castel 3B; 60 Cycle Access: Dismount past works

ST. PETER PORT - BERTHELOT STREET
Description: Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Sun 30 Nov 25 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
Start date: Monday, 17/03/25 End date: Sunday, 30/11/25 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - COUPEE LANE ( LE GALET STEPS to )
Description: Work starting 07:00 AM and finishing 04:00 PM - Crane lift
Start date: Saturday, 19/07/25 End date: Saturday, 19/07/25 Timing: Between AM and PM Peaks
Promoter: Pipeline Services Contractor: Pipeline Services
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - GMCCC Val Des Terres HILLCLIMB
Description: GMCCC Val Des Terres HILLCLIMB
Start date: Saturday, 19/07/25 End date: Saturday, 19/07/25 Timing: All Day
Promoter: GMCCC Guernsey Motorcycle and Car Club LBG Contractor: N/A
Bus Routes Affected: St Martin 3A; St Martin 3B; LB 2A; LMDC 7B Cycle Access: No

ST. PETER PORT - HAVELET ( THE STRAND to HAUTEVILLE )
Description: piling works for new housing
Start date: Wednesday, 09/07/25 End date: Friday, 08/08/25 Timing: All Day
Promoter: ROWNEY SHARMAN Contractor: ROWNEY SHARMAN
Bus Routes Affected: St Martin PS 3A;St Martin PS 3B;LBHS 2A;LBHS 3B;LV HS 4A;LV HS 6B Cycle Access: Dismount past works

ST. PETER PORT - KINGS ROAD
Description: Low voltage cabling upgrade and service connections
Start date: Monday, 07/07/25 End date: Friday, 29/08/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LA COUPERDERIE
Description: Road resurfacing
Start date: Saturday, 19/07/25 End date: Sunday, 20/07/25 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE TRUCHOT
Description: Scaffolding; Property: No 21; Purpose: External Decoration
Start date: Friday, 18/07/25 End date: Friday, 01/08/25 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES PETITES FONTAINES ( MOUNT HERMON to VALNORD ROAD )
Description: Work starting 11:30 AM on Fri 22 Nov 24 and finishing 04:00 PM on Thu 31 Jul 25 - wall repairs
Start date: Friday, 22/11/24 End date: Thursday, 31/07/25 Timing: All Day
Promoter: TNT Stonemasons Contractor: TNT Stonemasons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - SKINS LANE ( LES OZOUETS ROAD to LA NEUVE RUE )
Description: Work starting 08:30 AM on Mon 14 Jul 25 and finishing 08:00 AM on Tue 29 Jul 25 - Install new surface water connection
Start date: Monday, 14/07/25 End date: Tuesday, 29/07/25 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: LMDC HS 7A;LMDC HS 7B;LV HS 1A;LV HS 1B;LV HS 2A;LV HS 2B;LV HS 7B;LV HS 8A;SS HS 1A;SS HS 1B;SS HS 4A NEW;SS HS 4B NEW Cycle Access: Dismount past works

ST. PETER PORT - VALNORD LANE ( VALNORD ESTATE to GREEN LANES )
Description: Delivery of building materials.
Start date: Monday, 23/06/25 End date: Sunday, 30/11/25 Timing: Between AM and PM Peaks
Promoter: Hillstone Guernsey Ltd Contractor: Hillstone Guernsey Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PIERRE DU BOIS - RUE DU COUTEUR ( ROUTE DU COUDRE to RUE DE L'ISSUE )
Description: Work starting 08:00 AM on Mon 09 Jun 25 and finishing 05:00 PM on Fri 01 Aug 25 - Repairing road side wall
Start date: Monday, 09/06/25 End date: Friday, 01/08/25 Timing: All Day
Promoter: Adie Exall Stonemason Contractor: Adie Exall Stonemason
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - RUE SAUVAGE
Description: Rue Sauvage upgrade phase 1: Low voltage pillar replacement and enabling works for Rue Sauvage substation and cabling upgrade
Start date: Monday, 30/06/25 End date: Tuesday, 29/07/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Capelles PS 2B;LV HS 1B;LV HS 8A;SS HS 1A;SS HS 1B Cycle Access: Dismount past works

TORTEVAL - Torteval Scarecrow Festival
Description: Road closures
Start date: Saturday, 19/07/25 End date: Sunday, 20/07/25 Timing: All Day
Promoter: Torteval Scarecrow Festival Contractor: N/A
Bus Routes Affected: Forest PS 1A;Forest PS 1B;Houguette PS 1A;LB HS 6A;LB HS 6B;LMDC HS 1A 2A;LMDC HS 1B 2B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LMDC HS LB HS 1A;LMDC HS LB HS 1B;LV HS LB HS 5A;LV HS LB HS 5B Cycle Access: Yes

One Ways
No current major delays due to one ways
Signals
ST. ANDREW - ROUTE DE ST. ANDRE
Description: Work starting 07:00 AM on Thu 03 Jul 25 and finishing 07:00 PM on Sun 10 Aug 25 - Scaffolding to Coach House ; Property: The Coach House; Purpose: Roofing Works
Start date: Thursday, 03/07/25 End date: Sunday, 10/08/25 Timing: All Day
Promoter: Access Scaffolding Contractor: Traffic and Highway Services (Parking Suspensions and Events)
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - COLLEGE STREET
Description: Work starting 07:00 AM on Mon 14 Jul 25 and finishing 04:00 PM on Mon 18 Aug 25 - Scaffolding to Ozanne Building - Elizabeth College ; Property: Ozanne Building - Elizabeth College ; Purpose: Access
Start date: Monday, 14/07/25 End date: Monday, 18/08/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BORDAGE
Description: Removing scaffolding
Start date: Saturday, 19/07/25 End date: Monday, 21/07/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BORDAGE
Description: Work starting 07:30 AM on Sat 05 Apr 25 and finishing 04:30 PM on Thu 31 Jul 25 - Phase 2 of St Peter`s House; Property: St Peter`s House; Purpose: Roofing Works
Start date: Saturday, 05/04/25 End date: Thursday, 31/07/25 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - LES QUERITES ( RUE DE LA HOUGUE to RUE ST. GERMAIN )
Description: Road side wall repair
Start date: Monday, 21/07/25 End date: Monday, 04/08/25 Timing: Between AM and PM Peaks
Promoter: Paulo`s Gardening Services Contractor: Paulo`s Gardening Services
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUETTE DES CHERFS
Description: Install new electric feed (PHASE 2)
Start date: Wednesday, 23/07/25 End date: Monday, 28/07/25 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LES MOURANTS ( MOURANTS ROAD to LA PLANQUE LANE )
Description: service alteration
Start date: Monday, 21/07/25 End date: Thursday, 24/07/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: LB 4B; LB 4A Overflow Cycle Access: Dismount past works

ST. ANDREW - RUE DE LA BOULLERIE ( ROUTE DE ST. ANDRE to RUE DES BAILLEULS )
Description: Reset loose roadside Kerbs at Blind Association
Start date: Monday, 21/07/25 End date: Wednesday, 23/07/25 Timing: All Day
Promoter: Tarmac Services Contractor: Tarmac Services
Bus Routes Affected: Forest 2A; Forest 2B; St Martin 1A; St Martin 1B; LB 4B Cycle Access: Dismount past works

ST. MARTIN - LA GRANDE RUE ( SCHOOL LANE to LES CAMPS )
Description: Install new water service
Start date: Monday, 21/07/25 End date: Monday, 28/07/25 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: St Martin 3A; St Martin 3B; LB 1A; LB 1B; LB 2A; LB 3B; LV 4B; 81;91;92;93;94;95;N3 Cycle Access: Dismount past works

ST. MARTIN - LA GRANDE RUE ( SCHOOL LANE to LES CAMPS )
Description: Install new foul sewer connection
Start date: Monday, 21/07/25 End date: Monday, 11/08/25 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LB 9B; LV 4A Cycle Access: Dismount past works

ST. MARTIN - OLD MILL ROAD ( LES CAMPS DU MOULIN to OLD MILL ROAD )
Description: Cable splicing
Start date: Monday, 21/07/25 End date: Monday, 21/07/25 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: 91;93;94;95;N3 Cycle Access: Yes

ST. MARTIN - UNNAMED ROAD
Description: Full closure of carpark
Start date: Monday, 21/07/25 End date: Monday, 01/09/25 Timing: All Day
Promoter: Infinity Construction Ltd Contractor: Infinity Construction Ltd
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - CORDIER HILL
Description: Work starting 07:30 AM on Mon 21 Jul 25 and finishing 04:00 PM on Fri 01 Aug 25 - Road resurfacing
Start date: Monday, 21/07/25 End date: Friday, 01/08/25 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - GEORGE STREET ( VAUVERT to ALLEZ STREET )
Description: Erecting scaffolding.
Start date: Wednesday, 23/07/25 End date: Wednesday, 23/07/25 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - MOUNT DURAND ( PRINCE ALBERT ROAD to VALNORD ROAD )
Description: Work starting 07:30 AM on Sun 20 Jul 25 and finishing 05:00 PM on Mon 21 Jul 25 - Concrete pump and deliveries of materials.
Start date: Sunday, 20/07/25 End date: Monday, 21/07/25 Timing: All Day
Promoter: Habitat Ltd Contractor: Habitat Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - PIED DES VARDES ( LES VARDES to GEORGE ROAD )
Description: CCTV Survey
Start date: Friday, 25/07/25 End date: Friday, 25/07/25 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: LMDC HS 5A;LMDC HS 5B;SS HS 1A Cycle Access: Dismount past works

ST. PETER PORT - ST. JULIAN`S AVENUE ( ROYAL AVENUE to LOWER CANICHERS )
Description: Crane lift
Start date: Sunday, 20/07/25 End date: Sunday, 20/07/25 Timing: Between AM and PM Peaks
Promoter: Siteweld ltd Contractor: Siteweld ltd
Bus Routes Affected: Vauvert 1B; 31;32;41;42;60;61;71;81;N2;N4 Cycle Access: No

ST. PETER PORT - ST. JULIAN`S AVENUE
Description: Tree works
Start date: Sunday, 20/07/25 End date: Sunday, 20/07/25 Timing: Between AM and PM Peaks
Promoter: RH Tree Services Contractor: RH Tree Services
Bus Routes Affected: Vauvert 1B; 31;32;41;42;60;61;71;81;N2;N4 Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND ( CLIFF STREET to HAVELET )
Description: Crane lifting scaffolding
Start date: Monday, 21/07/25 End date: Tuesday, 22/07/25 Timing: Between AM and PM Peaks
Promoter: Infinity Construction Ltd Contractor: Infinity Construction Ltd
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - VALNORD LANE
Description: High voltage cable overlay Phase 1
Start date: Monday, 21/07/25 End date: Friday, 19/09/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - VAUVERT ( LA COUPERDERIE to ALLEZ STREET )
Description: Stripping scaffolding.
Start date: Monday, 21/07/25 End date: Tuesday, 22/07/25 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Vauvert 1A; Vauvert 1B Cycle Access: Dismount past works

ST. PIERRE DU BOIS - Rocquaine Regatta
Description: Road closure
Start date: Saturday, 26/07/25 End date: Saturday, 26/07/25 Timing: All Day
Promoter: Rocquaine Regatta Committee Contractor: N/A
Bus Routes Affected: Houguette 1A; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LV 5A / LB 6A; LV 5B / LB 6B; 61;71;91;92;93;94;N3 Cycle Access: No

ST. PIERRE DU BOIS - RUE DE LA FONTENELLE ( to RUE DU BORDAGE )
Description: Work starting 08:00 AM on Wed 23 Jul 25 and finishing 05:00 PM on Thu 24 Jul 25 - Chamber and duct installation
Start date: Wednesday, 23/07/25 End date: Thursday, 24/07/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LE PARCQ LANE ( RUE GODFREY to PETILS LANE )
Description: service alteration
Start date: Monday, 21/07/25 End date: Tuesday, 22/07/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. ANDREW - Funeral at St Andrew`s Church
Description: Work starting 09:30 AM on Tue 22 Jul 25 and finishing 12:30 PM on Tue 22 Jul 25 - Funeral
Start date: Tuesday, 22/07/25 End date: Tuesday, 22/07/25 Timing: All Day
Promoter: Martels Funeral Services Contractor: N/A
Bus Routes Affected: LB 4A Cycle Access: Yes, in direction of one-way

ST. MARTIN - LES MERRIENNES ( LA GRANDE RUE to RUE DE L'EGLISE )
Description: Excavate blocked duct
Start date: Monday, 21/07/25 End date: Tuesday, 22/07/25 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Yes

Signals
ST. MARTIN - LA RUE MAZE; LONGUE RUE to LA GRANDE RUE ( LONGUE RUE to LA GRANDE RUE )
Description: Essential maintenance to gas services.
Start date: Wednesday, 23/07/25 End date: Friday, 25/07/25 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - LES BAS COURTILS ROAD
Description: to repostion new streetlight from pedestrian crossing
Start date: Thursday, 24/07/25 End date: Friday, 25/07/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LA ROUTE DU BRAYE; RUE DU TERTRE to CARRIERE LANE ( RUE DU TERTRE to CARRIERE LANE )
Description: Repair to roadside wall
Start date: Monday, 21/07/25 End date: Friday, 01/08/25 Timing: Between AM and PM Peaks
Promoter: M Tullier Ltd Contractor: M Tullier Ltd
Bus Routes Affected: Cycle Access: Yes