Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - LA NEUVE RUE
Description: Work starting 07:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Mon 18 Nov 24 - Upgrade foul water manhole
Start date: Monday, 28/10/24 End date: Monday, 18/11/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: P2, 51, 52 Cycle Access: Dismount past works

CASTEL - RUETTE DE ST. BRIOCQ
Description: Road resurfacing
Start date: Monday, 28/10/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Traffic and Highway Services (Capital Works)
Bus Routes Affected: 60, 61 Cycle Access: No: dismount

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Tuesday, 31/12/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

FOREST - LES REBOUQUETS
Description: Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - High and low voltage cable upgrade and duct lay
Start date: Wednesday, 09/10/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: No

FOREST - RUE DE LA CORBIERE ( to LA RUE DE MANOIR COTE SUD )
Description: Work starting 08:00 AM on Wed 30 Oct 24 and finishing 05:00 PM on Tue 05 Nov 24 - Chamber installation
Start date: Wednesday, 30/10/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - RUE DES BUTTES; ROUTE DE ST. ANDRE to LES HUNGUETS ( ROUTE DE ST. ANDRE to LES HUNGUETS )
Description: New supply for gas monitor
Start date: Saturday, 02/11/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - GEORGE STREET
Description: scaffolding laundrette; Property: Normandie washaterie; Purpose: External Decoration
Start date: Tuesday, 29/10/24 End date: Tuesday, 28/01/25 Timing: All Day
Promoter: Formula Scaffolding Contractor: Formula Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - HAVELET ( THE STRAND to HAUTEVILLE )
Description: Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
Start date: Tuesday, 01/10/24 End date: Friday, 17/01/25 Timing: All Day
Promoter: Bob Froome and Sons Contractor: Bob Froome and Sons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LOWER CANICHERS ( LE TRUCHOT to DOYLE STREET )
Description: Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
Start date: Monday, 30/09/24 End date: Monday, 28/04/25 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - MANSELL STREET
Description: Scaffolding ; Property: No 7, Mansell Street; Purpose: Other (see Details)
Start date: Thursday, 31/10/24 End date: Monday, 21/04/25 Timing: Between AM and PM Peaks
Promoter: Island Scaffolding Contractor: Island Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - SAUSMAREZ STREET; NORTH CLIFTON to GRANGE ROAD ( NORTH CLIFTON to GRANGE ROAD )
Description: Work starting 07:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Thu 07 Nov 24 - Install new water services
Start date: Monday, 04/11/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 32 Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
Start date: Wednesday, 10/07/24 End date: Saturday, 12/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UPLAND ROAD
Description: Urgent window repairs to 1 Grange Place. ; Property: 1 grange; Purpose: Installation
Start date: Tuesday, 29/10/24 End date: Thursday, 19/12/24 Timing: All Day
Promoter: Formula Scaffolding Contractor: Formula Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - VICTORIA ROAD
Description: service alteration
Start date: Monday, 04/11/24 End date: Wednesday, 06/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - VICTORIA ROAD ( VALNORD ROAD to MOUNT HERMON )
Description: service alteration
Start date: Monday, 04/11/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE LIHOU ( RUE DU LONGFRIE to RUE DES GRANDES RUES )
Description: Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 15 Nov 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
Start date: Thursday, 29/08/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Traffic and Highways Contractor: Traffic and Highways
Bus Routes Affected: Cycle Access: No

ST. PIERRE DU BOIS - RUE DES LANDES ( RUE DES RONDIAUX to RUE DES PRES )
Description: Work starting 07:00 AM on Sat 02 Nov 24 and finishing 05:00 PM on Mon 11 Nov 24 - Drainage works
Start date: Saturday, 02/11/24 End date: Monday, 11/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - LES MARTINS
Description: Low voltage cable upgrade
Start date: Monday, 04/11/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. SAMPSON - OATLANDS LANE; LES GIGANDS ROAD to LES SAUVAGEES ( LES GIGANDS ROAD to LES SAUVAGEES )
Description: Lateral / Service Repair
Start date: Monday, 04/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - RONDE CHEMINEE ( to BROCK ROAD )
Description: Roadside wall repairs.
Start date: Monday, 04/11/24 End date: Friday, 15/11/24 Timing: Between AM and PM Peaks
Promoter: Stoneworks Ltd Contractor: Stoneworks Ltd
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - ROUTE CARRE
Description: Work starting 07:00 AM on Sat 26 Oct 24 and finishing 05:00 PM on Fri 29 Nov 24 - Distribution pillar installation and low voltage cabling upgrade
Start date: Saturday, 26/10/24 End date: Friday, 29/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: P2, 13, 21, N1, Cycle Access: Dismount past works

ST. SAVIOUR - LES RUETTES ( RUE DES MEREZ to RUE DU GRON )
Description: Drainage works
Start date: Monday, 04/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Traffic and Highway Services (Highways Inspector)
Bus Routes Affected: Cycle Access: Yes

ST. SAVIOUR - ROUTE DES ROUVETS ( LA GRANDE RUE to RUE DE LA HOUGUE BACHELE )
Description: Chamber and duct installation
Start date: Monday, 04/11/24 End date: Wednesday, 06/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 60, 61 Cycle Access: Dismount past works

ST. SAVIOUR - RUE DES LOHIERS
Description: Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Tue 05 Nov 24 - Chamber and duct installation
Start date: Monday, 14/10/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: No

VALE - CARRIERE LANE ( to LA ROUTE DU BRAYE )
Description: Install new foul sewer
Start date: Monday, 04/11/24 End date: Monday, 18/11/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LA RUE DE LA MARAIVE ( ROCQUE ES ROUSSEE to LA ROUTE DE LA LANDE )
Description: Supply line upgrade
Start date: Thursday, 31/10/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - PORT SOIF LANE ( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
Description: Road reconstruction and resurfacing
Start date: Monday, 04/11/24 End date: Friday, 20/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: 41 Cycle Access: Dismount past works

VALE - ROUTE DE LA CHARRUEE ( RUE COHU to PRIVATE ROAD )
Description: service alteration
Start date: Monday, 04/11/24 End date: Wednesday, 06/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 41, 42, N2 Cycle Access: Dismount past works

VALE - RUE DES HAIZES ( SOHIER ROAD to ROSELAND LANE )
Description: new supply line
Start date: Thursday, 31/10/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE GODFREY
Description: Install new section of water main
Start date: Monday, 28/10/24 End date: Monday, 11/11/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
CASTEL - RETOT; LA GIFFARDIERE to LES QUERITES ( LA GIFFARDIERE to LES QUERITES )
Description: Repairs to roadside wall.
Start date: Monday, 07/10/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Island Formwork and Construction Ltd Contractor: Island Formwork and Construction Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PETER PORT - GRANGE ROAD
Description: Scaffolding erection
Start date: Friday, 01/11/24 End date: Tuesday, 05/11/24 Timing: All Day
Promoter: Island Scaffolding Contractor: Island Scaffolding
Bus Routes Affected: 31, 41, 42, 51, 52, 60, 61, 71, 81, N2 Cycle Access: Yes, in direction of one-way

ST. PETER PORT - LE BOUET
Description: Work starting 07:00 AM on Mon 23 Sep 24 and finishing 05:00 PM on Mon 30 Dec 24 - For construction of 3 flats
Start date: Monday, 23/09/24 End date: Monday, 30/12/24 Timing: All Day
Promoter: Just Build It Ltd Contractor: Just Build It Ltd
Bus Routes Affected: 31, 32 Cycle Access: Yes, in direction of one-way

ST. PETER PORT - LES GRAVEES
Description: Work starting 09:00 AM on Mon 04 Nov 24 and finishing 05:00 PM on Wed 06 Nov 24 - CUT OFF SERVICE ON MAIN IN ROAD
Start date: Monday, 04/11/24 End date: Wednesday, 06/11/24 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: 41, 42, 51, 52, N2 Cycle Access: Yes

Signals
CASTEL - COBO COAST ROAD ( ROUTE DE COBO to ROUTE DE CARTERET )
Description: Rebuilding of boundary wall
Start date: Monday, 30/09/24 End date: Sunday, 17/11/24 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUE DES ETURS; RUE DU PREEL to RUE DES DESLISLES ( RUE DU PREEL to RUE DES DESLISLES )
Description: Work starting 08:00 AM on Wed 30 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - Duct and chamber installations
Start date: Wednesday, 30/10/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - ROUTE DE PORT GRAT; ROUTE DE PULIAS to LES DICQS ( ROUTE DE PULIAS to LES DICQS )
Description: Rebuilding roadside wall.
Start date: Monday, 14/10/24 End date: Saturday, 16/11/24 Timing: All Day
Promoter: Another Level Ltd Contractor: Another Level Ltd
Bus Routes Affected: Cycle Access: No


Starting - next 7 days
Closures
CASTEL - GUERNSEY VELO CLUB – CYCLOCROSS
Description: GUERNSEY VELO CLUB – CYCLOCROSS
Start date: Sunday, 10/11/24 End date: Sunday, 10/11/24 Timing: Before AM Peak
Promoter: Guernsey Velo Club LBG Contractor: N/A
Bus Routes Affected: Cycle Access: No

CASTEL - Guernsey Velo Club - CycloCross Event
Description: Guernsey Velo Club - CycloCross Event - Vazon - Closure of Fort Houmet access road and car parks
Start date: Sunday, 10/11/24 End date: Sunday, 10/11/24 Timing: All Day
Promoter: Guernsey Velo Club LBG Contractor: N/A
Bus Routes Affected: Cycle Access: No

CASTEL - LA NEUVE RUE ( L'AUMONE ESTATE to RUE DES CAUVAINS )
Description: Crane Lift
Start date: Monday, 11/11/24 End date: Monday, 11/11/24 Timing: Between AM and PM Peaks
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: P2, 51, 52 Cycle Access: Yes

CASTEL - RUE DU GELE ( RUETTE DU ROCHER to VAZON ROAD )
Description: Tree surgery works.
Start date: Thursday, 07/11/24 End date: Thursday, 07/11/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: 60, 61, N2 Cycle Access: Dismount past works

CASTEL - RUE DU PRESBYTERE
Description: Work starting 07:00 AM on Mon 11 Nov 24 and finishing 05:00 PM on Fri 20 Dec 24 - Install new water main
Start date: Monday, 11/11/24 End date: Friday, 20/12/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: P2, 51, 52 Cycle Access: Dismount past works

CASTEL - RUETTE DU VILLOCQ; RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ ( RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ )
Description: supply line alteration
Start date: Tuesday, 05/11/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - LES VILLETS
Description: Chamber installation
Start date: Friday, 08/11/24 End date: Monday, 11/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - REMEMBRANCE PARADE – ST MARTINS ( LA BELLIEUSE to LES MERRIENNES )
Description: REMEMBRANCE PARADE – ST MARTINS
Start date: Sunday, 10/11/24 End date: Sunday, 10/11/24 Timing: Between AM and PM Peaks
Promoter: Constables of St Martin Contractor: N/A
Bus Routes Affected: 81 Cycle Access: Dismount past works

ST. MARTIN - STEAM MILL LANE ( to DOUIT DE LA PORTE )
Description: Work starting 08:00 AM and finishing 04:00 PM daily between Wed 06 Nov 24 and Fri 08 Nov 24 - Cable splicing
Start date: Wednesday, 06/11/24 End date: Friday, 08/11/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - VILLE AMPHREY ( RUETTE RABEY to )
Description: Road resurfacing
Start date: Monday, 11/11/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Traffic and Highway Services (Capital Works)
Bus Routes Affected: Cycle Access: No: dismount

ST. PETER PORT - BACK STREET ( MANSELL STREET to VAUVERT )
Description: Household removal.
Start date: Friday, 08/11/24 End date: Friday, 08/11/24 Timing: Between AM and PM Peaks
Promoter: Diamond Group Ltd Contractor: Diamond Group Ltd
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - BACK STREET ( MANSELL STREET to VAUVERT )
Description: Household removal.
Start date: Monday, 11/11/24 End date: Monday, 11/11/24 Timing: Between AM and PM Peaks
Promoter: White and Company Contractor: White and Company
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - FOUNTAIN STREET
Description: Erection of Christmas Lights
Start date: Sunday, 10/11/24 End date: Sunday, 10/11/24 Timing: All Day
Promoter: Event Hire Guernsey Ltd Contractor: Event Hire Guernsey Ltd
Bus Routes Affected: P2, 91, 92, 93, 94, 95, N3 Cycle Access: Dismount past works

ST. PETER PORT - KINGS ROAD
Description: CCTV Camera Clean
Start date: Monday, 04/11/24 End date: Tuesday, 05/11/24 Timing: Before AM Peak
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES CANICHERS ( BOSQ LANE to WELL ROAD )
Description: Relay loose granite kerb to pavement for TandHS. Some other RTM is schedualed in for the Monday and Tuesday after so limiting traffic would be beneficial as the kerb need some protection from vehicles driving on it. Maybe the RTM on Monday and Tueday will assist this.
Start date: Friday, 08/11/24 End date: Friday, 08/11/24 Timing: Between AM and PM Peaks
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Vaudin Stonemasons
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - MOUNT DURAND
Description: CCTV Camera Clean
Start date: Friday, 08/11/24 End date: Friday, 08/11/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - MOUNT DURAND ( VALNORD ROAD to PARK STREET )
Description: Check duct runs with CCTV camera
Start date: Friday, 08/11/24 End date: Friday, 08/11/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - REMEMBRANCE PARADE (Road Closure)
Description: REMEMBRANCE PARADE (Road Closure)
Start date: Sunday, 10/11/24 End date: Sunday, 10/11/24 Timing: Between AM and PM Peaks
Promoter: Bailiff`s Chambers Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - RUETTES BRAYES ( AVENUE VIVIER to COLBORNE ROAD )
Description: Road closed for centre & both edges of carriageway studs to be renewed
Start date: Monday, 11/11/24 End date: Monday, 11/11/24 Timing: Between AM and PM Peaks
Promoter: Traffic and Highway Services (Roadworks Coordination) Contractor: Traffic and Highway Services (Roadworks Coordination)
Bus Routes Affected: P2 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DES ADAMS ( RUE ROCHEUSE to ROUTE DU FELCONTE )
Description: service alteration
Start date: Wednesday, 06/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 61, 71, 93, 94, N3 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE L`ECLET ( RUE DES CARRIAUX to ROUTE DES PAYSANS )
Description: Excavate blocked duct
Start date: Monday, 11/11/24 End date: Wednesday, 13/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - NOCQ ROAD ( ROLAND ROAD to THE BRIDGE )
Description: Chamber and duct installation
Start date: Monday, 11/11/24 End date: Wednesday, 13/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - ROBERGERIE ( ROUTE MILITAIRE to RUE JACQUES )
Description: New electrical supply line
Start date: Monday, 11/11/24 End date: Wednesday, 13/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - ROUTE CARRE; SANDY HOOK to BRAYE DU VALLE ( SANDY HOOK to BRAYE DU VALLE )
Description: Install new water supply
Start date: Thursday, 07/11/24 End date: Monday, 11/11/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: P2, 13, 21, N1, Cycle Access: Dismount past works

ST. SAVIOUR - LA GRANDE LANDE ( RUE DES LOHIERS to RUE DES RIGNEAUX )
Description: Work starting 07:00 AM on Mon 11 Nov 24 and finishing 04:00 PM on Fri 15 Nov 24 - Crane Lift.
Start date: Monday, 11/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Verdellis Construction Contractor: Verdellis Construction
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - ROUTE DES BAS COURTILS ( RUE DU GRON to RUE DES LONGS CAMPS )
Description: Work starting 08:00 AM on Tue 05 Nov 24 and finishing 05:00 PM on Fri 15 Nov 24 - Chamber installations x 7
Start date: Tuesday, 05/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 71 Cycle Access: Dismount past works

TORTEVAL - ROUTE DES LAURENS
Description: Cable Splicing
Start date: Monday, 11/11/24 End date: Wednesday, 13/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: 71, 91, 92, 93, 94, N3 Cycle Access: Yes

VALE - LA MAISON AU COMPTE ( LA GRANDE RUE to RUETTE DES HAIZES )
Description: Install new water service
Start date: Thursday, 07/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 13, N1 Cycle Access: Dismount past works

VALE - LES ROUVETS ROAD ( RUE DES ANNEVILLES to RUE DES MARAIS )
Description: service alteration
Start date: Monday, 11/11/24 End date: Wednesday, 13/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

VALE - RUE DES LANDES ( LA CANURIE ROAD to LA HOUGUE )
Description: Supply line upgrade
Start date: Wednesday, 06/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - SEPT ETOILES ( LA MOYE ROAD to ROCQUE ES CAS )
Description: supply line upgrade
Start date: Thursday, 07/11/24 End date: Monday, 11/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. ANDREW - LE VAUQUIEDOR
Description: Repairs to failed covers
Start date: Monday, 11/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: P2, 60, 61, 71 Cycle Access: Yes, in direction of one-way

ST. ANDREW - LE VAUQUIEDOR ( LES MAUXMARQUIS (ROUTE DE ST. ANDRE) to RUE A L'OR )
Description: FW cover replacements
Start date: Monday, 11/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: P2, 60, 61, 71 Cycle Access: Dismount past works

ST. ANDREW - LE VAUQUIEDOR; LES MAUXMARQUIS (ROUTE DE ST. ANDRE) to RUE A L'OR ( LES MAUXMARQUIS (ROUTE DE ST. ANDRE) to RUE A L'OR )
Description: Repair defective gullies
Start date: Monday, 11/11/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: P2, 60, 61, 71 Cycle Access: Dismount past works

ST. MARTIN - LA ROUTE DES CORNUS
Description: Supply line upgrade
Start date: Tuesday, 05/11/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 81, 91, 92, 93, 94, 95, N3 Cycle Access: Dismount past works

ST. PETER PORT - AVENUE DU MANOIR
Description: Locate and excavate duct blockage
Start date: Wednesday, 06/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 91, 92, 93, 94, 95, N3 Cycle Access: Yes

ST. PETER PORT - KINGS ROAD
Description: To put up scaffolding; Property: La Maison du Carrosse; Purpose: Roofing Works
Start date: Thursday, 07/11/24 End date: Sunday, 10/11/24 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

VALE - Guernsey Scout Group - Bonfire Night ( LES ROUVETS ROAD to LE ROCHER LANE )
Description: Work starting 05:00 PM on Tue 05 Nov 24 and finishing 09:00 PM on Wed 06 Nov 24 - Guernsey Scout Group - Bonfire Night
Start date: Tuesday, 05/11/24 End date: Wednesday, 06/11/24 Timing: All Day
Promoter: Bailiwick of Guernsey Scouts Contractor: N/A
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

Signals
ST. PETER PORT - LA CHARROTERIE; PRINCE ALBERT ROAD to RUE DU PRE ( PRINCE ALBERT ROAD to RUE DU PRE )
Description: Erect scaffold & position plant
Start date: Monday, 11/11/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

TORTEVAL - ROUTE DE PLEINMONT; LES BUTTES to RUE DU BELLE ( LES BUTTES to RUE DU BELLE )
Description: Closure required for sitting heavy machinery / plant in road, in relation to installation of new cesspit in private property
Start date: Monday, 11/11/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: 71, 91, 92, 93, 94, N3 Cycle Access: Yes

VALE - CASTLE ROAD; NORTH SIDE to RUE DES BARRAS ( NORTH SIDE to RUE DES BARRAS )
Description: Work starting 08:00 AM on Thu 07 Nov 24 and finishing 05:00 PM on Fri 08 Nov 24 - Repair to cover
Start date: Thursday, 07/11/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes