Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Mon 30 Sep 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Monday, 30/09/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - RUE DU PRESBYTERE; RUE DES LES HOUARDS to LE BOURG
|
( RUE DES LES HOUARDS to LE BOURG )
|
Description:
|
Work starting 08:00 AM on Mon 16 Sep 24 and finishing 05:00 PM on Thu 19 Sep 24 - Chamber and duct installation
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Thursday, 19/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - CALAIS LANE
|
( ROUTE DE JERBOURG to CALAIS ROAD )
|
Description:
|
replacing streetlight
|
Start date:
|
Thursday, 19/09/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES HURETTES
|
|
Description:
|
Work starting 07:00 AM on Mon 19 Aug 24 and finishing 07:00 AM on Fri 18 Oct 24 - High and low voltage cabling upgrade
|
Start date:
|
Monday, 19/08/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. MARTIN - OLD MILL ROAD
|
( LES CAMPS DU MOULIN to LES CAMPS )
|
Description:
|
Work starting 07:00 AM on Mon 16 Sep 24 and finishing 04:00 PM on Fri 27 Sep 24 - Road resurfacing and installation of footpath
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
91, 93, 94, 95, N3
|
Cycle Access:
|
No: dismount
|
ST. MARTIN - RUE DE L`EGLISE
|
( LA BELLIEUSE to LES MERRIENNES )
|
Description:
|
Pole installation
|
Start date:
|
Thursday, 19/09/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DE LA FALAISE
|
|
Description:
|
Work starting 07:00 AM on Mon 02 Sep 24 and finishing 05:00 PM on Mon 30 Sep 24 - Upgrade existing water main and services.
|
Start date:
|
Monday, 02/09/24
|
End date:
|
Monday, 30/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BACK STREET
|
|
Description:
|
Scaffolding ; Property: No 3; Purpose: Demolition / New Build
|
Start date:
|
Friday, 08/03/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BRUCE LANE
|
( LES AMBALLES to CORBIN STEPS )
|
Description:
|
Work starting 07:00 AM on Thu 12 Sep 24 and finishing 05:00 PM on Fri 04 Oct 24 - For access of road works vehicles to work in top of Corbin steps for Trant Ltd to park their excavation equipment
|
Start date:
|
Thursday, 12/09/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Work starting 10:00 AM on Mon 02 Oct 23 and finishing 04:00 PM on Mon 30 Sep 24 - Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
|
Start date:
|
Monday, 02/10/23
|
End date:
|
Monday, 30/09/24
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 04 Oct 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
Work starting 12:00 AM on Mon 16 Sep 24 and finishing 11:59 PM on Fri 27 Sep 24 - Slip line 4` iron main prior to road resurfacing July 2025
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DES CLERCS
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - RUE DES MONTS
|
|
Description:
|
Scaffolding at - Flat 1, Nirvana, Rue des Monts, St Sampson. GY2 4HR; Property: Flat 1, Nirvana, Rue des Monts; Purpose: Access
|
Start date:
|
Saturday, 07/09/24
|
End date:
|
Sunday, 06/10/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DE LA TERRE NORGIOT
|
|
Description:
|
Work starting 07:00 AM on Mon 02 Sep 24 and finishing 04:00 PM on Fri 20 Sep 24 - Road resurfacing
|
Start date:
|
Monday, 02/09/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. SAVIOUR - RUE DU MONT SAINT
|
( RUE DES HURIAUX to LE MONT SAINT )
|
Description:
|
Work starting 07:00 AM on Thu 16 May 24 and finishing 05:00 PM on Fri 01 Nov 24 - Site compound
|
Start date:
|
Thursday, 16/05/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DU RIGNET
|
|
Description:
|
Works to install new services and upgrade underground cables
|
Start date:
|
Monday, 09/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
TORTEVAL - RUE DU BOUT
|
( RUE DU PLANEL to ROUTE DE PLEINMONT )
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. ANDREW - ROUTE DE ST. ANDRE
|
|
Description:
|
Repair roadside granite wall
|
Start date:
|
Monday, 09/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. MARTIN - RUE CAUCHEZ
|
|
Description:
|
New chamber installations
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Tuesday, 24/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ST. JAMES STREET; COLLEGE STREET to GRANGE ROAD
|
( COLLEGE STREET to GRANGE ROAD )
|
Description:
|
Essential gas works
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 20/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
31, 32, 41, 42, 51, 52, 60, 61, 71, 81, N2
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - ROUTE DES FRANCES
|
|
Description:
|
Scaffolding of barn wall under temporary traffic lights
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Stoneworks Ltd
|
Contractor:
|
Stoneworks Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - LES GRANDES ROCQUES
|
|
Description:
|
Work starting 08:00 AM on Mon 23 Sep 24 and finishing 05:00 PM on Fri 27 Sep 24 - Chamber and duct installation
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
N2
|
Cycle Access:
|
Dismount past works
|
CASTEL - ROUTE DE SAUMAREZ
|
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
P2, 41, 42, N2
|
Cycle Access:
|
No: dismount
|
FOREST - VUE DE L`EGLISE
|
( LA RUE DES VILLETS to RUE DES LES HOUARDS )
|
Description:
|
Work starting 08:00 AM on Thu 26 Sep 24 and finishing 05:00 PM on Fri 27 Sep 24 - Chamber and duct installation
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES MAUXMARQUIS (ROUTE DE ST. ANDRE)
|
|
Description:
|
Finishing of PEH roadworks for 33kv
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Tuesday, 24/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - ROUTE DES TALBOTS
|
( RUE DES ROQUETTES to L'ECLUSE )
|
Description:
|
service alteration
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Tuesday, 01/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - Guernsey Velo Club LBG - Cycling Hill Climb
|
( LA ROUTE DE SAUSMAREZ to )
|
Description:
|
Work starting 06:00 AM and finishing 12:00 PM - Guernsey Velo Club LBG - Cycling Hill Climb
|
Start date:
|
Sunday, 22/09/24
|
End date:
|
Sunday, 22/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. MARTIN - LA ROUTE DE SAUSMAREZ
|
( LE VARCLIN to FERMAIN LANE )
|
Description:
|
Tree surgery works.
|
Start date:
|
Sunday, 22/09/24
|
End date:
|
Sunday, 22/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Dave Brouard Limited
|
Contractor:
|
Dave Brouard Limited
|
Bus Routes Affected:
|
91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUE DES ESCALIERS
|
( LA RUE DES FRENES to RUE DE LA VILLETTE )
|
Description:
|
Cable splicing
|
Start date:
|
Wednesday, 25/09/24
|
End date:
|
Wednesday, 25/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA VERTE RUE
|
( LA PLANQUE LANE to RUE DES LANDES )
|
Description:
|
Cable splicing
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Thursday, 26/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DE LA QUEVILLETTE
|
( LA PLANQUE LANE to LES VAURIOUFS )
|
Description:
|
Cable splicing
|
Start date:
|
Wednesday, 25/09/24
|
End date:
|
Wednesday, 25/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ALLEZ STREET
|
|
Description:
|
Work starting 07:30 AM on Tue 24 Sep 24 and finishing 04:00 PM on Fri 25 Oct 24 - Footway repaving
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. PETER PORT - LE TRUCHOT
|
( DOYLE STREET to SIR WILLIAM PLACE )
|
Description:
|
To crane a pressure washer and some rubbish on and off a roof
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Tuesday, 24/09/24
|
Timing:
Before AM Peak
|
Promoter:
|
Q3 Services Ltd
|
Contractor:
|
Q3 Services Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES OBERLANDS
|
( LA RUE DE LA CORBINERIE to LES FRIETEAUX )
|
Description:
|
Work starting 07:00 AM on Thu 26 Sep 24 and finishing 05:00 PM on Thu 03 Oct 24 - service alteration
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Thursday, 03/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES OBERLANDS
|
|
Description:
|
Work starting 07:00 AM on Thu 26 Sep 24 and finishing 03:00 PM on Mon 07 Oct 24 - Install new water service(s)
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Monday, 07/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MOUNT DURAND
|
( PRINCE ALBERT ROAD to VALNORD ROAD )
|
Description:
|
To be able to park a crane and lift scaffolding over the property
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Tuesday, 24/09/24
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - PRINCE ALBERT ROAD
|
|
Description:
|
High and low voltage cable upgrade
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
( CLIFF STREET to HAVELET )
|
Description:
|
Stripping scaffolding.
|
Start date:
|
Wednesday, 25/09/24
|
End date:
|
Saturday, 28/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - TOWER HILL
|
( LE BORDAGE to LOWER HAUTEVILLE )
|
Description:
|
Stripping scaffolding.
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Friday, 27/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - VAUVERT
|
( GRANGE ROAD to LA COUPERDERIE )
|
Description:
|
Work starting 08:00 AM and finishing 12:00 PM - Road Closure - Palma, 1 Brock Terrace, Vauvert St Peter Port
|
Start date:
|
Saturday, 21/09/24
|
End date:
|
Saturday, 21/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
F Watson and Son
|
Contractor:
|
F Watson and Son
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA RUE DU HAMEL
|
( RUE DU DOS D`ANE to RUE DES HURIAUX )
|
Description:
|
Install new water service
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Thursday, 26/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LE NEUF CHEMIN ROAD
|
( RUE DU MOULIN to RUE DES CHOFFINS )
|
Description:
|
Tree surgery works.
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Thursday, 26/09/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES TREPIEDS
|
( RUE DES MASSIES to RUE DE L'EGLISE )
|
Description:
|
Replace collapsing chamber
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Thursday, 26/09/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - VIEILLE RUE
|
( RUE DES CINQ VERGES to RUE DE LA GIROUETTE )
|
Description:
|
closure to allow for service alteration
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Wednesday, 25/09/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - ROUTE DE PLEINMONT
|
|
Description:
|
Work starting 07:00 AM on Wed 25 Sep 24 and finishing 05:00 PM on Fri 04 Oct 24 - closure to allow for a service alteration
|
Start date:
|
Wednesday, 25/09/24
|
End date:
|
Friday, 04/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
71, 91, 92, 93, 94, N3
|
Cycle Access:
|
Dismount past works
|
VALE - LA ROUTE DU BRAYE
|
|
Description:
|
Low voltage cable upgrade
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
11, 12, 13, N1
|
Cycle Access:
|
Dismount past works
|
VALE - LES GRIPPIOS
|
( PETITE HOUGUES to RUE DES BORDEAUX )
|
Description:
|
Replacing gravel paths to church - Road closed Monday to Friday only
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
C. A. Duquemin Ltd
|
Contractor:
|
C. A. Duquemin Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
No future major delays due to one ways
No future major delays due to signals