Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - LA GIFFARDIERE
|
( RETOT to RUE D'ALBECQ )
|
Description:
|
Mains replacement program to enhance the safety, reliability, and efficiency of the gas network.
|
Start date:
|
Tuesday, 08/04/25
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
Castel 3B; 42;N2
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DU FRIE PLAIDY
|
|
Description:
|
Scaffolding; Property: Le Frie Plaidy; Purpose: Other (see Details)
|
Start date:
|
Saturday, 15/03/25
|
End date:
|
Saturday, 10/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DU PRESBYTERE
|
|
Description:
|
Work starting 08:30 AM on Mon 03 Mar 25 and finishing 05:00 PM on Mon 02 Jun 25 - Install new water transfer pipework
|
Start date:
|
Monday, 03/03/25
|
End date:
|
Monday, 02/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Castel 1A; St Martin 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Wed 30 Apr 25 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Wednesday, 30/04/25
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - CASTEL - ROUTE DE LA HOUGUE DU POMMIER
|
|
Description:
|
Work starting 07:18 PM on Tue 15 Apr 25 and finishing 05:00 PM on Wed 23 Apr 25 - Emergency Works - LV Fault
|
Start date:
|
Tuesday, 15/04/25
|
End date:
|
Wednesday, 23/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; SS 8A; SS 8B; 41;N2
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BACK STREET
|
( MANSELL STREET to VAUVERT )
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM daily between Mon 14 Apr 25 and Fri 25 Apr 25 - Cable splicing
|
Start date:
|
Monday, 14/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BERTHELOT STREET
|
|
Description:
|
Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Monday, 04/05/26
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BURNT LANE
|
|
Description:
|
Chamber and duct installations
|
Start date:
|
Monday, 14/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - HIGH STREET
|
( LEFEBVRE STREET to BERTHELOT STREET )
|
Description:
|
Work starting 10:00 AM and finishing 06:00 PM daily between Mon 10 Mar 25 and Wed 30 Apr 25 - Stripping scaffolding.
|
Start date:
|
Monday, 10/03/25
|
End date:
|
Wednesday, 30/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Wed 30 Apr 25 - wall repairs
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Wednesday, 30/04/25
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES VAUXLAURENS
|
|
Description:
|
Work starting 07:30 AM and finishing 05:00 PM daily between Fri 29 Nov 24 and Fri 30 May 25 - Scaffold to access for emergency works from storm damage; Property: Apartments 4 and 29 St Julians Avenue; Purpose: Roofing Works
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Friday, 30/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - PORT VASE
|
( BURNT LANE to )
|
Description:
|
Work starting 07:30 AM on Mon 14 Apr 25 and finishing 05:00 PM on Tue 22 Apr 25 - Supply line upgrade
|
Start date:
|
Monday, 14/04/25
|
End date:
|
Tuesday, 22/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 11:59 PM on Sat 31 May 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Saturday, 31/05/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Wednesday, 16/04/25
|
End date:
|
Sunday, 27/04/25
|
Timing:
All Day
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - VIEILLE RUE
|
( RUE DES CINQ VERGES to RUE DE LA GIROUETTE )
|
Description:
|
Work starting 07:00 AM and finishing 05:00 PM daily between Mon 03 Feb 25 and Thu 01 May 25 - Rebuilding roadside wall.
|
Start date:
|
Monday, 03/02/25
|
End date:
|
Thursday, 01/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - Guernsey Velo Club - Cycling race
|
|
Description:
|
Easter Festival
|
Start date:
|
Friday, 18/04/25
|
End date:
|
Friday, 18/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - ROUTE DE ST MAGLOIRE
|
|
Description:
|
Work starting 07:30 AM on Wed 16 Apr 25 and finishing 05:00 PM on Wed 30 Apr 25 - Replacing electricity cable in La Ruette de S. Magloire and La Rue De Paradis Vale
|
Start date:
|
Wednesday, 16/04/25
|
End date:
|
Wednesday, 30/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - ROUTE DES COUTURES
|
|
Description:
|
Work starting 07:30 AM on Mon 14 Apr 25 and finishing 04:00 PM on Fri 25 Apr 25 - Road resurfacing
|
Start date:
|
Monday, 14/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
Vale 1A; Vale 2A; P2;13
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM daily between Wed 16 Oct 24 and Sun 04 May 25 - Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Sunday, 04/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE D`ALBECQ
|
( SOUS LES COURTILS to LA NEUVE RUE )
|
Description:
|
Mains replacement program to enhance the safety, reliability, and efficiency of the gas network.
|
Start date:
|
Tuesday, 08/04/25
|
End date:
|
Monday, 12/05/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
Castel 3B; LMDC 4A; LMDC 4B; LV 3B; LV 8A; LMDC 3B / LB 8B; 42;91;92;N2
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BORDAGE
|
|
Description:
|
Phase 2 of St Peter's House; Property: St Peter`s House; Purpose: Roofing Works
|
Start date:
|
Saturday, 05/04/25
|
End date:
|
Monday, 30/06/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - RUE SAUVAGE; LA ROUTE DES CAPELLES to LES BASSES CAPELLES ROAD
|
( LA ROUTE DES CAPELLES to LES BASSES CAPELLES ROAD )
|
Description:
|
Rebuilding roadside wall.
|
Start date:
|
Monday, 14/04/25
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Paul Bonnel Stonemasons
|
Contractor:
|
Paul Bonnel Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LA RUE DU MONT MARCHE
|
( to LE MONT MARCHE ESTATE )
|
Description:
|
Chamber installation
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LES NICOLLES
|
( FST-MISC28 to LES REBOUQUETS )
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM daily between Thu 24 Apr 25 and Fri 25 Apr 25 - CBT install and cable splicing 8am - 4pm daily
|
Start date:
|
Thursday, 24/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES MOUILPIEDS
|
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM - CBT installations
|
Start date:
|
Wednesday, 23/04/25
|
End date:
|
Wednesday, 23/04/25
|
Timing:
Before AM Peak
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
St Martin PS 1A;St Martin PS 1B;LBHS 4A;LB HS 4A Overflow;LBHS 5A;LBHS 5B;LB HS 9B;LMDC HS 4A;LV HS 6B
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES MOUILPIEDS
|
( CHEMIN LE ROI to LA RUETTE DE LA POMPE )
|
Description:
|
Jetting culvert
|
Start date:
|
Thursday, 24/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
The Drain Squad
|
Contractor:
|
The Drain Squad
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - GMCCC Val Des Terres HILLCLIMB
|
|
Description:
|
GMCCC Val Des Terres HILLCLIMB
|
Start date:
|
Monday, 21/04/25
|
End date:
|
Monday, 21/04/25
|
Timing:
All Day
|
Promoter:
|
GMCCC Guernsey Motorcycle and Car Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 2A; LMDC 7B
|
Cycle Access:
|
No
|
ST. PETER PORT - IVY CASTLE LANE
|
|
Description:
|
Scaffolding.; Property: Apartment 1, Meadowview; Purpose: Roofing Works
|
Start date:
|
Thursday, 24/04/25
|
End date:
|
Saturday, 10/05/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - QUEENS ROAD
|
|
Description:
|
Replace failing chamber cover
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Vauvert 1B; LMDC 7A; 60;61;71;81;N4
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ROUTE DE LA RAMEE
|
( LA HAMEAU to LA ROUTE DES LONGS CAMPS )
|
Description:
|
Tree works
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Tuesday, 22/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Dave Brouard Limited
|
Contractor:
|
Dave Brouard Limited
|
Bus Routes Affected:
|
31;32
|
Cycle Access:
|
No
|
ST. PETER PORT - ROUTE DE LA RAMEE
|
|
Description:
|
New supply line
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31;32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPPER ST. JACQUES
|
|
Description:
|
CCTV Camera clean
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Tuesday, 22/04/25
|
Timing:
Before AM Peak
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VAUVERT
|
( LA COUPERDERIE to ALLEZ STREET )
|
Description:
|
Work starting 07:30 AM and finishing 05:00 PM daily between Wed 23 Apr 25 and Fri 25 Apr 25 - Erecting scaffolding.
|
Start date:
|
Wednesday, 23/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
Vauvert 1A; Vauvert 1B
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - Guernsey Football Association - Victoria Park Stadium
|
|
Description:
|
Guernsey Football Association - Victoria Park Stadium
|
Start date:
|
Monday, 21/04/25
|
End date:
|
Monday, 21/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Vale 2A
|
Cycle Access:
|
Yes
|
TORTEVAL - Guernsey Velo Club - Hill Climb
|
|
Description:
|
Easter Festival
|
Start date:
|
Saturday, 19/04/25
|
End date:
|
Saturday, 19/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Velo Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Houguette PS 1A;LB HS 6A;LB HS 6B;LMDC HS 1A 2A;LMDC HS 1B 2B;LV HS 5A;LV HS 5B;LMDC HS LB HS 1A;LMDC HS LB HS 1B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
No
|
VALE - Easter Festival Road Race
|
( LONGREE to TRAFALGAR ROAD )
|
Description:
|
Easter Festival Road Race
|
Start date:
|
Monday, 21/04/25
|
End date:
|
Monday, 21/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
13;N1
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Funeral at Notre Dame Church
|
( NEW PLACE to GEORGE STREET )
|
Description:
|
Funeral
|
Start date:
|
Thursday, 24/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Argent Funeral Care
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Vauvert 1B
|
Cycle Access:
|
Yes, in direction of one-way
|
VALE - Easter Festival Cross Country Race
|
|
Description:
|
Easter Festival Cross Country Race
|
Start date:
|
Saturday, 19/04/25
|
End date:
|
Saturday, 19/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
VALE - Easter Festival Les Amarreurs Cross Country Run OW
|
( Cotes de Amarreurs to L'Ancresse Road )
|
Description:
|
Easter Festival Les Amarreurs Cross Country Run OW
|
Start date:
|
Saturday, 19/04/25
|
End date:
|
Saturday, 19/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Athletics Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - COBO COAST ROAD; ROUTE DE COBO to ROUTE DE CARTERET
|
( ROUTE DE COBO to ROUTE DE CARTERET )
|
Description:
|
Supply line alteration
|
Start date:
|
Wednesday, 23/04/25
|
End date:
|
Friday, 25/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - QUEENS ROAD; BELMONT ROAD to MOUNT ROW
|
( BELMONT ROAD to MOUNT ROW )
|
Description:
|
Repair damaged duct
|
Start date:
|
Tuesday, 22/04/25
|
End date:
|
Thursday, 24/04/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|