Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - ROUTE DE LA HOUGUE DU POMMIER
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Mon 21 Dec 26 - Install new 400mm water ring main pipework
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Monday, 21/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUE DE LA CACHE
|
( to RUE DES VARENDES )
|
|
Description:
|
Work starting 08:00 AM on Mon 02 Nov 26 and finishing 05:00 PM on Sun 15 Nov 26 - Erect scaffold for re-roofing
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Sunday, 15/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
CASTEL - RUE DES BELLES
|
( RUE DE LA PORTE to RUE DES BERGERS )
|
|
Description:
|
Erect scaffolding in roadway to give access to build granite wall
|
|
Start date:
|
Wednesday, 07/10/26
|
End date:
|
Wednesday, 04/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
FOREST - RUE DES AUBERTS
|
( LE BOURG to )
|
|
Description:
|
Primary substation replacement
|
|
Start date:
|
Monday, 22/06/26
|
End date:
|
Friday, 27/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. ANDREW - ROUTE DE LA CROIX AU BAILIFF
|
|
|
Description:
|
Work starting 07:30 AM on Tue 27 Oct 26 and finishing 04:00 PM on Fri 06 Nov 26 - Road patching
|
|
Start date:
|
Monday, 26/10/26
|
End date:
|
Friday, 06/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
St Martin 1A; St Martin 1B; LB 1A; LB 1B; LB 2A; LB 2B; LB 3A; LB 3B; LV 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;51;52;60;61
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BERTHELOT STREET
|
( HIGH STREET to NEW STREET )
|
|
Description:
|
ROOMS REFURBISHMENT REQUIRING X3 SKIPS TO BE PUT ON BERTHELOT STREET BEHIND THE PICKLED PIG SECTION OF THE HOTEL.
|
|
Start date:
|
Monday, 19/10/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
The Duke of Normandie Hotel
|
Contractor:
|
The Duke of Normandie Hotel
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Thu 31 Dec 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 31/12/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - CROUTES HAVILLAND
|
( FORT ROAD to DAMOUETTES LANE )
|
|
Description:
|
Concrete Pour for 2 properties
|
|
Start date:
|
Tuesday, 03/11/26
|
End date:
|
Friday, 06/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - LES OZOUETS ROAD
|
|
|
Description:
|
Work starting 08:30 AM on Mon 05 Oct 26 and finishing 05:00 PM on Mon 09 Nov 26 - Foul manhole upgrade works
|
|
Start date:
|
Monday, 05/10/26
|
End date:
|
Monday, 09/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
SS 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MISC
|
|
|
Description:
|
Erect scaffold - road will remain closed due to width of the road; Property: 29 Victoria Road; Purpose: Roofing Works
|
|
Start date:
|
Wednesday, 07/10/26
|
End date:
|
Wednesday, 11/11/26
|
Timing:
All Day
|
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - THE STRAND
|
( CLIFF STREET to HAVELET )
|
|
Description:
|
works being done to 16 Hauteville in the back carpark which leads onto main road, large vehichels will need to access and will be in the way along with works to be carried out
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Tuesday, 01/12/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - LES REINES
|
|
|
Description:
|
Erect Scaffolding; Property: Les Reines; Purpose: Roofing Works
|
|
Start date:
|
Monday, 19/10/26
|
End date:
|
Friday, 11/12/26
|
Timing:
All Day
|
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
|
Bus Routes Affected:
|
Forest PS 1A;Forest PS 1B;LB HS 6A;LB HS 6B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
|
ST. PIERRE DU BOIS - RUE DU BORDAGE
|
( RUE DU CAMP AU PRETRE to RUE DE LA FONTENELLE )
|
|
Description:
|
building gable wall.
|
|
Start date:
|
Friday, 28/08/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - LES SAUVAGEES
|
|
|
Description:
|
Route Militaire high and low voltage cabling connection
|
|
Start date:
|
Monday, 26/10/26
|
End date:
|
Friday, 13/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - ROUTE MILITAIRE
|
|
|
Description:
|
High voltage substation installation, high and low voltage cable upgrade and service upgrades
|
|
Start date:
|
Monday, 28/09/26
|
End date:
|
Friday, 18/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21
|
Cycle Access:
|
Dismount past works
|
|
TORTEVAL - RUE DU PLANEL
|
( ROUTE DE PLEINMONT to )
|
|
Description:
|
supply line upgrade
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Wednesday, 04/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
LMDC 1A / LB 7A; LMDC 1B / LB 7B
|
Cycle Access:
|
Dismount past works
|
|
TORTEVAL - RUE DU PLANEL
|
( RUE DU BOUT to )
|
|
Description:
|
Service alteration
|
|
Start date:
|
Tuesday, 03/11/26
|
End date:
|
Wednesday, 04/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
VALE - ROUTE DE LA CHARRUEE
|
|
|
Description:
|
Work starting 08:30 AM on Tue 01 Sep 26 and finishing 05:00 PM on Wed 23 Dec 26 - Upsize existing water main
|
|
Start date:
|
Tuesday, 01/09/26
|
End date:
|
Wednesday, 23/12/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; 41;42;N2
|
Cycle Access:
|
Dismount past works
|
|
VALE - RUE DES HAIZES
|
|
|
Description:
|
Essential maintenance to gas Mains and Services.
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - RUE DU CHARDRONNET
|
( LA RUE DE PARADIS to RUE DE DESSOUS )
|
|
Description:
|
Erect Scaffold to enable roof repairs
|
|
Start date:
|
Monday, 26/10/26
|
End date:
|
Thursday, 26/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
VALE - VALE-MISC54
|
( ROCQUE ES CAS to LA MOYE ROAD )
|
|
Description:
|
Work starting 10:00 AM on Tue 14 Jul 26 and finishing 05:00 PM on Sat 14 Nov 26 - Deliveries and Barn renovations
|
|
Start date:
|
Tuesday, 14/07/26
|
End date:
|
Saturday, 14/11/26
|
Timing:
All Day
|
|
Promoter:
|
Omega Group
|
Contractor:
|
Omega Group
|
|
Bus Routes Affected:
|
Vale PS 2B;Vale PS 3B
|
Cycle Access:
|
Dismount past works
|
No current major delays due to one ways
|
CASTEL - RUE DE LA SALINE
|
( ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BU )
|
|
Description:
|
COASTAL WALL REPAIR.
|
|
Start date:
|
Monday, 07/09/26
|
End date:
|
Friday, 18/12/26
|
Timing:
All Day
|
|
Promoter:
|
States Property Unit
|
Contractor:
|
States Property Unit
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - ROUTE ST. CLAIR; RUE DES POINTUES ROCQUES to VALE ROAD
|
( RUE DES POINTUES ROCQUES to VALE ROAD )
|
|
Description:
|
Temporary Traffic Signals at St Clair Hill, St Sampsons - Repairing Damaged Granite wall - Monday to Friday 7am until 17:00 - for 2 weeks 2nd November until 13th November. (house name Charmouth)
|
|
Start date:
|
Monday, 02/11/26
|
End date:
|
Monday, 09/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. ANDREW - LES RUETTES
|
( ROUTE DE LA CROIX AU BAILIFF to FOULON ROAD )
|
|
Description:
|
House Move
|
|
Start date:
|
Thursday, 05/11/26
|
End date:
|
Friday, 06/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - LES RUETTES
|
( ROUTE DE LA CROIX AU BAILIFF to FOULON ROAD )
|
|
Description:
|
Works to roadside driveway
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Monday, 16/11/26
|
Timing:
All Day
|
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - COIN COLIN
|
|
|
Description:
|
Work starting 07:30 AM on Mon 09 Nov 26 and finishing 04:00 PM on Fri 20 Nov 26 - Road resurfacing
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Friday, 20/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. MARTIN - LA FOSSE DE BAS
|
( LA FOSSE DE HAUT to LE ROCHER )
|
|
Description:
|
Tree Surgery
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Monday, 09/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - LES PAGES
|
( RUE DES PAGES to LES MARTINS )
|
|
Description:
|
Roads Resurfacing
|
|
Start date:
|
Wednesday, 04/11/26
|
End date:
|
Friday, 06/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - LONG TRAC
|
|
|
Description:
|
Road resurfacing
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Tuesday, 10/11/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - Remembrance Sunday Service
|
( LA BELLIEUSE to LES MERRIENNES )
|
|
Description:
|
Road closed 10am to 12pm
|
|
Start date:
|
Sunday, 08/11/26
|
End date:
|
Sunday, 08/11/26
|
Timing:
All Day
|
|
Promoter:
|
Constables of St Martin
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
81, 93
|
Cycle Access:
|
No
|
|
ST. PETER PORT - FORT ROAD
|
|
|
Description:
|
Fermain Lane Substation replacement phase 2
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Monday, 30/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 2A; LB 3B; LV 4A; 91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - LOWER HAUTEVILLE
|
( CLIFF STREET to PEDVIN STREET )
|
|
Description:
|
House move
|
|
Start date:
|
Tuesday, 10/11/26
|
End date:
|
Tuesday, 10/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - Remembrance Day 2026 - St Peter Port
|
|
|
Description:
|
Closure of streets on Parade Route and around Cenotaph along with associated suspension of parking over period.
|
|
Start date:
|
Sunday, 08/11/26
|
End date:
|
Sunday, 08/11/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Bailiff`s Chambers
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - ST. JACQUES
|
|
|
Description:
|
New duct to property
|
|
Start date:
|
Thursday, 05/11/26
|
End date:
|
Friday, 06/11/26
|
Timing:
All Day
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - Guernsey Football Association
|
|
|
Description:
|
GFC match - road closure
|
|
Start date:
|
Saturday, 07/11/26
|
End date:
|
Saturday, 07/11/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Vale 2A
|
Cycle Access:
|
Yes:
|
|
ST. SAVIOUR - LES BUTTES
|
|
|
Description:
|
Tree surgery
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Friday, 13/11/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
No
|
|
ST. SAVIOUR - RUE DU BELIAL
|
( RUE CEVECQ to ROUTE DES DOMAINES )
|
|
Description:
|
Replace old water meter chambers
|
|
Start date:
|
Monday, 09/11/26
|
End date:
|
Thursday, 12/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - Guernsey Rugby Club Firework Display
|
|
|
Description:
|
Road one-way 4:30pm to 9pm
|
|
Start date:
|
Sunday, 08/11/26
|
End date:
|
Sunday, 08/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Rugby Club
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - 2nd Guernsey Scouts - Bonfire Night event
|
( LES ROUVETS ROAD to LES ARGUILLIERS LANE )
|
|
Description:
|
Work starting 05:00 PM and finishing 09:00 PM - One way working of road past Wayfarer Centre at Rue du Haut
|
|
Start date:
|
Thursday, 05/11/26
|
End date:
|
Thursday, 05/11/26
|
Timing:
After PM Peak
|
|
Promoter:
|
2nd Guernsey Scout Group
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
No future major delays due to signals