Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - ROUTE DE L`EGLISE
|
|
Description:
|
Work starting 04:00 PM on Mon 19 May 25 and finishing 11:59 PM on Wed 23 Jul 25 - Lay new water transfer main
|
Start date:
|
Monday, 19/05/25
|
End date:
|
Wednesday, 23/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Castel 1B; LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LV 3B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61
|
Cycle Access:
|
Dismount past works
|
CASTEL - ROUTE DE L`EGLISE
|
( RUE DU PREEL to RUETTE DE TOUILLETS )
|
Description:
|
Work starting 08:00 AM on Tue 15 Jul 25 and finishing 05:00 PM on Sun 03 Aug 25 - Urgent repairs to foul water manhole chambers
|
Start date:
|
Tuesday, 15/07/25
|
End date:
|
Sunday, 03/08/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Castel 1B; LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LV 3B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61
|
Cycle Access:
|
Dismount past works
|
CASTEL - ROUTE DE LA HOUGUE DU POMMIER; ROUTE DE CARTERET to LES GENATS ESTATE
|
|
Description:
|
Repair manhole cover & frame
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Sunday, 20/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
LMDC 6A / LV 6A; SS 8A; SS 8B; 41;N2
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DES MORTS
|
( RUE DU FRIE PLAIDY to RUE DU PREEL )
|
Description:
|
Work starting 07:30 AM on Thu 10 Jul 25 and finishing 05:00 PM on Wed 23 Jul 25 - Close the road to allow the lorry and machine enough room to operate on Route De L`Eglise
|
Start date:
|
Thursday, 10/07/25
|
End date:
|
Wednesday, 23/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:30 PM on Sun 31 Aug 25 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Sunday, 31/08/25
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - SOUS LES COURTILS; ROUTE DE LA MARE to RUE D'ALBECQ
|
( ROUTE DE LA MARE to RUE D'ALBECQ )
|
Description:
|
To replace a faulty Sub Station, and replacement of High Voltage Cable.
|
Start date:
|
Monday, 19/05/25
|
End date:
|
Monday, 11/08/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
Castel 2A; Castel 3B; 60
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BERTHELOT STREET
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Sun 30 Nov 25 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Sunday, 30/11/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - COUPEE LANE
|
( LE GALET STEPS to )
|
Description:
|
Work starting 07:00 AM and finishing 04:00 PM - Crane lift
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Saturday, 19/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Pipeline Services
|
Contractor:
|
Pipeline Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - GMCCC Val Des Terres HILLCLIMB
|
|
Description:
|
GMCCC Val Des Terres HILLCLIMB
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Saturday, 19/07/25
|
Timing:
All Day
|
Promoter:
|
GMCCC Guernsey Motorcycle and Car Club LBG
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 2A; LMDC 7B
|
Cycle Access:
|
No
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
piling works for new housing
|
Start date:
|
Wednesday, 09/07/25
|
End date:
|
Friday, 08/08/25
|
Timing:
All Day
|
Promoter:
|
ROWNEY SHARMAN
|
Contractor:
|
ROWNEY SHARMAN
|
Bus Routes Affected:
|
St Martin PS 3A;St Martin PS 3B;LBHS 2A;LBHS 3B;LV HS 4A;LV HS 6B
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - KINGS ROAD
|
|
Description:
|
Low voltage cabling upgrade and service connections
|
Start date:
|
Monday, 07/07/25
|
End date:
|
Friday, 29/08/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LA COUPERDERIE
|
|
Description:
|
Road resurfacing
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Sunday, 20/07/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE TRUCHOT
|
|
Description:
|
Scaffolding; Property: No 21; Purpose: External Decoration
|
Start date:
|
Friday, 18/07/25
|
End date:
|
Friday, 01/08/25
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Work starting 11:30 AM on Fri 22 Nov 24 and finishing 04:00 PM on Thu 31 Jul 25 - wall repairs
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Thursday, 31/07/25
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - SKINS LANE
|
( LES OZOUETS ROAD to LA NEUVE RUE )
|
Description:
|
Work starting 08:30 AM on Mon 14 Jul 25 and finishing 08:00 AM on Tue 29 Jul 25 - Install new surface water connection
|
Start date:
|
Monday, 14/07/25
|
End date:
|
Tuesday, 29/07/25
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
LMDC HS 7A;LMDC HS 7B;LV HS 1A;LV HS 1B;LV HS 2A;LV HS 2B;LV HS 7B;LV HS 8A;SS HS 1A;SS HS 1B;SS HS 4A NEW;SS HS 4B NEW
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VALNORD LANE
|
( VALNORD ESTATE to GREEN LANES )
|
Description:
|
Delivery of building materials.
|
Start date:
|
Monday, 23/06/25
|
End date:
|
Sunday, 30/11/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Hillstone Guernsey Ltd
|
Contractor:
|
Hillstone Guernsey Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PIERRE DU BOIS - RUE DU COUTEUR
|
( ROUTE DU COUDRE to RUE DE L'ISSUE )
|
Description:
|
Work starting 08:00 AM on Mon 09 Jun 25 and finishing 05:00 PM on Fri 01 Aug 25 - Repairing road side wall
|
Start date:
|
Monday, 09/06/25
|
End date:
|
Friday, 01/08/25
|
Timing:
All Day
|
Promoter:
|
Adie Exall Stonemason
|
Contractor:
|
Adie Exall Stonemason
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - RUE SAUVAGE
|
|
Description:
|
Rue Sauvage upgrade phase 1: Low voltage pillar replacement and enabling works for Rue Sauvage substation and cabling upgrade
|
Start date:
|
Monday, 30/06/25
|
End date:
|
Tuesday, 29/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
Capelles PS 2B;LV HS 1B;LV HS 8A;SS HS 1A;SS HS 1B
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - Torteval Scarecrow Festival
|
|
Description:
|
Road closures
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Sunday, 20/07/25
|
Timing:
All Day
|
Promoter:
|
Torteval Scarecrow Festival
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Forest PS 1A;Forest PS 1B;Houguette PS 1A;LB HS 6A;LB HS 6B;LMDC HS 1A 2A;LMDC HS 1B 2B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LMDC HS LB HS 1A;LMDC HS LB HS 1B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Yes
|
No current major delays due to one ways
ST. ANDREW - ROUTE DE ST. ANDRE
|
|
Description:
|
Work starting 07:00 AM on Thu 03 Jul 25 and finishing 07:00 PM on Sun 10 Aug 25 - Scaffolding to Coach House ; Property: The Coach House; Purpose: Roofing Works
|
Start date:
|
Thursday, 03/07/25
|
End date:
|
Sunday, 10/08/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Traffic and Highway Services (Parking Suspensions and Events)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - COLLEGE STREET
|
|
Description:
|
Work starting 07:00 AM on Mon 14 Jul 25 and finishing 04:00 PM on Mon 18 Aug 25 - Scaffolding to Ozanne Building - Elizabeth College ; Property: Ozanne Building - Elizabeth College ; Purpose: Access
|
Start date:
|
Monday, 14/07/25
|
End date:
|
Monday, 18/08/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BORDAGE
|
|
Description:
|
Removing scaffolding
|
Start date:
|
Saturday, 19/07/25
|
End date:
|
Monday, 21/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BORDAGE
|
|
Description:
|
Work starting 07:30 AM on Sat 05 Apr 25 and finishing 04:30 PM on Thu 31 Jul 25 - Phase 2 of St Peter`s House; Property: St Peter`s House; Purpose: Roofing Works
|
Start date:
|
Saturday, 05/04/25
|
End date:
|
Thursday, 31/07/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - LES QUERITES
|
( RUE DE LA HOUGUE to RUE ST. GERMAIN )
|
Description:
|
Road side wall repair
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Monday, 04/08/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Paulo`s Gardening Services
|
Contractor:
|
Paulo`s Gardening Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DES CHERFS
|
|
Description:
|
Install new electric feed (PHASE 2)
|
Start date:
|
Wednesday, 23/07/25
|
End date:
|
Monday, 28/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES MOURANTS
|
( MOURANTS ROAD to LA PLANQUE LANE )
|
Description:
|
service alteration
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Thursday, 24/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
LB 4B; LB 4A Overflow
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - RUE DE LA BOULLERIE
|
( ROUTE DE ST. ANDRE to RUE DES BAILLEULS )
|
Description:
|
Reset loose roadside Kerbs at Blind Association
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Wednesday, 23/07/25
|
Timing:
All Day
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
Forest 2A; Forest 2B; St Martin 1A; St Martin 1B; LB 4B
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA GRANDE RUE
|
( SCHOOL LANE to LES CAMPS )
|
Description:
|
Install new water service
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Monday, 28/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 1A; LB 1B; LB 2A; LB 3B; LV 4B; 81;91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA GRANDE RUE
|
( SCHOOL LANE to LES CAMPS )
|
Description:
|
Install new foul sewer connection
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Monday, 11/08/25
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LB 9B; LV 4A
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - OLD MILL ROAD
|
( LES CAMPS DU MOULIN to OLD MILL ROAD )
|
Description:
|
Cable splicing
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Monday, 21/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
91;93;94;95;N3
|
Cycle Access:
|
Yes
|
ST. MARTIN - UNNAMED ROAD
|
|
Description:
|
Full closure of carpark
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Monday, 01/09/25
|
Timing:
All Day
|
Promoter:
|
Infinity Construction Ltd
|
Contractor:
|
Infinity Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - CORDIER HILL
|
|
Description:
|
Work starting 07:30 AM on Mon 21 Jul 25 and finishing 04:00 PM on Fri 01 Aug 25 - Road resurfacing
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Friday, 01/08/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - GEORGE STREET
|
( VAUVERT to ALLEZ STREET )
|
Description:
|
Erecting scaffolding.
|
Start date:
|
Wednesday, 23/07/25
|
End date:
|
Wednesday, 23/07/25
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MOUNT DURAND
|
( PRINCE ALBERT ROAD to VALNORD ROAD )
|
Description:
|
Work starting 07:30 AM on Sun 20 Jul 25 and finishing 05:00 PM on Mon 21 Jul 25 - Concrete pump and deliveries of materials.
|
Start date:
|
Sunday, 20/07/25
|
End date:
|
Monday, 21/07/25
|
Timing:
All Day
|
Promoter:
|
Habitat Ltd
|
Contractor:
|
Habitat Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - PIED DES VARDES
|
( LES VARDES to GEORGE ROAD )
|
Description:
|
CCTV Survey
|
Start date:
|
Friday, 25/07/25
|
End date:
|
Friday, 25/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
LMDC HS 5A;LMDC HS 5B;SS HS 1A
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ST. JULIAN`S AVENUE
|
( ROYAL AVENUE to LOWER CANICHERS )
|
Description:
|
Crane lift
|
Start date:
|
Sunday, 20/07/25
|
End date:
|
Sunday, 20/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Siteweld ltd
|
Contractor:
|
Siteweld ltd
|
Bus Routes Affected:
|
Vauvert 1B; 31;32;41;42;60;61;71;81;N2;N4
|
Cycle Access:
|
No
|
ST. PETER PORT - ST. JULIAN`S AVENUE
|
|
Description:
|
Tree works
|
Start date:
|
Sunday, 20/07/25
|
End date:
|
Sunday, 20/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
RH Tree Services
|
Contractor:
|
RH Tree Services
|
Bus Routes Affected:
|
Vauvert 1B; 31;32;41;42;60;61;71;81;N2;N4
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
( CLIFF STREET to HAVELET )
|
Description:
|
Crane lifting scaffolding
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Tuesday, 22/07/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Infinity Construction Ltd
|
Contractor:
|
Infinity Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - VALNORD LANE
|
|
Description:
|
High voltage cable overlay Phase 1
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Friday, 19/09/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VAUVERT
|
( LA COUPERDERIE to ALLEZ STREET )
|
Description:
|
Stripping scaffolding.
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Tuesday, 22/07/25
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
Vauvert 1A; Vauvert 1B
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - Rocquaine Regatta
|
|
Description:
|
Road closure
|
Start date:
|
Saturday, 26/07/25
|
End date:
|
Saturday, 26/07/25
|
Timing:
All Day
|
Promoter:
|
Rocquaine Regatta Committee
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Houguette 1A; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LV 5A / LB 6A; LV 5B / LB 6B; 61;71;91;92;93;94;N3
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DE LA FONTENELLE
|
( to RUE DU BORDAGE )
|
Description:
|
Work starting 08:00 AM on Wed 23 Jul 25 and finishing 05:00 PM on Thu 24 Jul 25 - Chamber and duct installation
|
Start date:
|
Wednesday, 23/07/25
|
End date:
|
Thursday, 24/07/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LE PARCQ LANE
|
( RUE GODFREY to PETILS LANE )
|
Description:
|
service alteration
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Tuesday, 22/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - Funeral at St Andrew`s Church
|
|
Description:
|
Work starting 09:30 AM on Tue 22 Jul 25 and finishing 12:30 PM on Tue 22 Jul 25 - Funeral
|
Start date:
|
Tuesday, 22/07/25
|
End date:
|
Tuesday, 22/07/25
|
Timing:
All Day
|
Promoter:
|
Martels Funeral Services
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LB 4A
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. MARTIN - LES MERRIENNES
|
( LA GRANDE RUE to RUE DE L'EGLISE )
|
Description:
|
Excavate blocked duct
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Tuesday, 22/07/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. MARTIN - LA RUE MAZE; LONGUE RUE to LA GRANDE RUE
|
( LONGUE RUE to LA GRANDE RUE )
|
Description:
|
Essential maintenance to gas services.
|
Start date:
|
Wednesday, 23/07/25
|
End date:
|
Friday, 25/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LES BAS COURTILS ROAD
|
|
Description:
|
to repostion new streetlight from pedestrian crossing
|
Start date:
|
Thursday, 24/07/25
|
End date:
|
Friday, 25/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA ROUTE DU BRAYE; RUE DU TERTRE to CARRIERE LANE
|
( RUE DU TERTRE to CARRIERE LANE )
|
Description:
|
Repair to roadside wall
|
Start date:
|
Monday, 21/07/25
|
End date:
|
Friday, 01/08/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
M Tullier Ltd
|
Contractor:
|
M Tullier Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|