Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - ROUTE DE L`EGLISE
|
|
Description:
|
Work starting 04:00 PM on Mon 19 May 25 and finishing 05:00 PM on Fri 18 Jul 25 - Lay new water transfer main
|
Start date:
|
Monday, 19/05/25
|
End date:
|
Friday, 18/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Castel 1B; LB 1A; LB 2A; LB 2B; LB 3A; LB 3B; LV 3B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61
|
Cycle Access:
|
Dismount past works
|
CASTEL - ROUTE DE LA MARE; RUE DE LA VIEILLE MARE to SOUS LES COURTILS
|
( RUE DE LA VIEILLE MARE to SOUS LES COURTILS )
|
Description:
|
Work starting 08:00 AM on Fri 13 Jun 25 and finishing 05:00 PM on Tue 24 Jun 25 - Road closure is at the North end of Route De La Mare (junction intersection at Rue Des Goddards), whilst operators perform essential maintenance to gas services. A safe walkway will be made for pedestrians.
|
Start date:
|
Friday, 13/06/25
|
End date:
|
Tuesday, 24/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
Castel 2A; Castel 3B; 60
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DES GODDARDS
|
|
Description:
|
Work starting 08:00 AM on Tue 10 Jun 25 and finishing 05:00 PM on Mon 23 Jun 25 - Mains replacement program to enhance the safety, reliability, and efficiency of the gas network.
|
Start date:
|
Tuesday, 10/06/25
|
End date:
|
Monday, 23/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
Castel PS 2A;Castel PS 3B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 3A;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A;LMDC HS LB HS 3B
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DES GODDARDS
|
( VAZON ROAD to ROUTE DE LA MARE )
|
Description:
|
Work starting 09:00 AM on Mon 19 May 25 and finishing 05:00 PM on Mon 30 Jun 25 - Mains replacement program to enhance the safety, reliability, and efficiency of the gas network.
|
Start date:
|
Monday, 19/05/25
|
End date:
|
Monday, 30/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
Castel PS 2A;Castel PS 3B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 3A;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A;LMDC HS LB HS 3B
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Mon 30 Jun 25 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Monday, 30/06/25
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - SOUS LES COURTILS; ROUTE DE LA MARE to RUE D'ALBECQ
|
( ROUTE DE LA MARE to RUE D'ALBECQ )
|
Description:
|
To replace a faulty Sub Station, and replacement of High Voltage Cable.
|
Start date:
|
Monday, 19/05/25
|
End date:
|
Monday, 11/08/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
Castel 2A; Castel 3B; 60
|
Cycle Access:
|
Dismount past works
|
FOREST - LA PLANQUE LANE
|
( RUE DES LANDES to LES NOUETTES )
|
Description:
|
Work starting 08:00 AM on Sat 07 Jun 25 and finishing 11:59 PM on Mon 23 Jun 25 - Upgrade existing water main and services.
|
Start date:
|
Saturday, 07/06/25
|
End date:
|
Monday, 23/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - COIN COLIN
|
( LA ROUTE DE BLANCHES to LES MAINDONAUX )
|
Description:
|
Repairing road side wall
|
Start date:
|
Tuesday, 10/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Adie Exall Stonemason
|
Contractor:
|
Adie Exall Stonemason
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BERTHELOT STREET
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Sun 30 Nov 25 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Sunday, 30/11/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Mon 30 Jun 25 - wall repairs
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Monday, 30/06/25
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VALNORD ROAD
|
|
Description:
|
Work starting 08:00 AM and finishing 11:59 PM daily between Thu 06 Feb 25 and Fri 20 Jun 25 - various short duration road closures for delivery of materials to building site over a few month period.
|
Start date:
|
Thursday, 06/02/25
|
End date:
|
Friday, 20/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES PAYSANS
|
|
Description:
|
Work starting 10:00 AM on Thu 12 Jun 25 and finishing 04:00 PM on Wed 18 Jun 25 - ITS tactile crossing works across junction
|
Start date:
|
Thursday, 12/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DU COUTEUR
|
( ROUTE DU COUDRE to RUE DE L'ISSUE )
|
Description:
|
Repairing road side wall
|
Start date:
|
Monday, 09/06/25
|
End date:
|
Wednesday, 09/07/25
|
Timing:
All Day
|
Promoter:
|
Adie Exall Stonemason
|
Contractor:
|
Adie Exall Stonemason
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LES GRANDES MAISONS ROAD
|
( LES BAS COURTILS ROAD to LONGUE HOUGUE LANE )
|
Description:
|
Work starting 07:00 AM on Tue 06 May 25 and finishing 05:00 PM on Fri 11 Jul 25 - Low voltage cable upgrade and service connections
|
Start date:
|
Tuesday, 06/05/25
|
End date:
|
Friday, 11/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
Vale 2A; Vale 2B; LV 1A; LV 1B; LV 2B; SS 2B; SS 6A; SS 6B; 11;12;91;92;N1
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - RUE DU SAUCHET
|
|
Description:
|
Work starting 07:00 AM and finishing 04:00 PM daily between Mon 09 Jun 25 and Mon 16 Jun 25 - Scaffolding to Le Sauchet; Property: Le Sauchet; Purpose: External Decoration
|
Start date:
|
Monday, 09/06/25
|
End date:
|
Monday, 16/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - LA HOUGUE JEHANNET
|
( to NORTH SIDE )
|
Description:
|
Work starting 08:30 AM on Wed 04 Jun 25 and finishing 05:00 PM on Thu 03 Jul 25 - Install new water service
|
Start date:
|
Wednesday, 04/06/25
|
End date:
|
Thursday, 03/07/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
No current major delays due to one ways
ST. PETER PORT - LE BORDAGE
|
|
Description:
|
Phase 2 of St Peter's House; Property: St Peter`s House; Purpose: Roofing Works
|
Start date:
|
Saturday, 05/04/25
|
End date:
|
Monday, 30/06/25
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - Cobo Balcony Gig
|
( ROUTE DE COBO to ROUTE DE CARTERET )
|
Description:
|
Cobo Balcony Gig
|
Start date:
|
Sunday, 15/06/25
|
End date:
|
Sunday, 15/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Cobo Bay Hotel - Nut Tree Ltd
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LMDC 4A; LMDC 4B; LMDC 6B / LV 6B; LV 3B; LV 8A; LMDC 3B / LB 8B; 41;42;91;92;N2
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES VAURIOUFS - LA BRIGADE
|
|
Description:
|
Sewer Relining - Liner 1 ( les Vaurioufs )
|
Start date:
|
Thursday, 19/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
Forest PS 2A;Forest PS 2B;St Martin PS 1A;St Martin PS 1B;LBHS 1A;LBHS 1B;LBHS 2A;LBHS 2B;LBHS 3A;LBHS 3B;LV HS 4B;LV HS 5A;LV HS 6B;LV HS 9B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - ROUTE DE LA CROIX AU BAILIFF
|
|
Description:
|
Sewer Relining ( Enabling Works ) - Visit 1
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Sunday, 22/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
St Martin 1A; St Martin 1B; LB 1A; LB 1B; LB 2A; LB 2B; LB 3A; LB 3B; LV 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;51;52;60;61
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - RUE DU MONNAIE; ROUTE DE LA CROIX AU BAILIFF to LES POIDEVINS
|
( ROUTE DE LA CROIX AU BAILIFF to LES POIDEVINS )
|
Description:
|
Repair leaking chamber
|
Start date:
|
Wednesday, 18/06/25
|
End date:
|
Thursday, 19/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Forest 2A
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA ROUTE DE BLANCHES
|
( COIN COLIN to LES SALINES )
|
Description:
|
Repairs to road surface
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Tuesday, 17/06/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Yes
|
ST. MARTIN - SCHOOL LANE
|
( to LA GRANDE RUE )
|
Description:
|
Sewer Relining and Survey
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Sunday, 22/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - DAMOUETTES LANE
|
( COURTIL COLIN to CROUTES HAVILLAND )
|
Description:
|
Gas service disconnection outside Quelques Fleurs
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - DAMOUETTES LANE
|
( COURTIL COLIN to CROUTES HAVILLAND )
|
Description:
|
Service disconnection outside Little Gem under road closure
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - HAUTEVILLE
|
( PEDVIN STREET to HAVELET )
|
Description:
|
Supply line upgrade
|
Start date:
|
Wednesday, 18/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
LBHS 3B;LB HS 9B;LMDC HS 5B;LMDC HS 6B;SS HS 4B
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MOUNT DURAND
|
( VALNORD ROAD to PARK STREET )
|
Description:
|
Cable installations
|
Start date:
|
Wednesday, 18/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - RUE DU DOUIT
|
( WATER LANES to COUTURE LANE CRESCENT )
|
Description:
|
Work starting 08:00 AM on Mon 16 Jun 25 and finishing 05:00 PM on Thu 19 Jun 25 - Chamber and duct installation
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Thursday, 19/06/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES PAYSANS
|
|
Description:
|
Work starting 07:30 AM on Thu 19 Jun 25 and finishing 04:00 PM on Fri 11 Jul 25 - Road patching and footpath resurfacing.
|
Start date:
|
Thursday, 19/06/25
|
End date:
|
Friday, 11/07/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
Houguette 1A; Houguette 1B; Houguette 2A; Houguette 2B; Houguette 3A; Houguette 3B; Houguette 4A; LB 9B; LMDC 4A; LMDC 4B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61;71;93;94;N3
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES PAYSANS; RUE DE LA HOUGUETTE to ROUTE DES ADAMS
|
( RUE DE LA HOUGUETTE to ROUTE DES ADAMS )
|
Description:
|
to install new crossing lumieres
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Monday, 23/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
Houguette 1A; Houguette 1B; Houguette 2A; Houguette 2B; Houguette 3A; Houguette 3B; Houguette 4A; LB 9B; LMDC 4A; LMDC 4B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61;71;93;94;N3
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DES PAYSANS; RUE DU CAMP MASSY BREHAUT to RUE DES PAYSANS AU VAL
|
( RUE DU CAMP MASSY BREHAUT to RUE DES PAYSANS AU VA )
|
Description:
|
Crane lift
|
Start date:
|
Thursday, 19/06/25
|
End date:
|
Thursday, 19/06/25
|
Timing:
Before AM Peak
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
Houguette 1A; Houguette 1B; Houguette 2A; Houguette 2B; Houguette 3A; Houguette 3B; Houguette 4A; LB 9B; LMDC 4A; LMDC 4B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61;71;93;94;N3
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DE LA VALLEE
|
( RUE DES BUTTES to RUE TREMEL )
|
Description:
|
stripping scaffolding
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES VINAIRES
|
( RUE DES GRANDES RUES to RUE DES JULIENNES )
|
Description:
|
Work starting 08:00 AM on Mon 16 Jun 25 and finishing 04:00 PM on Mon 16 Jun 25 - Tree surgery works.
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Monday, 16/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
Houguette PS 3A;LB HS 6A;LB HS 6B;LMDC HS 1A 2A;LMDC HS 1B 2B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LMDC HS LB HS 1A;LMDC HS LB HS 1B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - COMMERCIAL ROAD
|
( NOCQ ROAD to THE BRIDGE )
|
Description:
|
Household removal.
|
Start date:
|
Friday, 20/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
R and R Removals
|
Contractor:
|
R and R Removals
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - EPINELLE ROAD
|
( LES SAUVAGEES to BAUBIGNY ROAD )
|
Description:
|
Work starting 09:00 AM on Mon 16 Jun 25 and finishing 04:00 PM on Fri 27 Jun 25 - Rebuild roadside granite wall to property called Port Clos
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Friday, 27/06/25
|
Timing:
All Day
|
Promoter:
|
Vaudin Stonemasons
|
Contractor:
|
Vaudin Stonemasons
|
Bus Routes Affected:
|
Vale PS 1A;Vale PS 3B;SS HS 2A;SS HS 3A;SS HS 3B;SS HS 7B
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - Guernsey Kart and Motor Club LBG (GK&MC)
|
( Rue A L'or; Rue Des Choffins; and Le Neuf Chemin Road RC. Mont Saint (Rue Des Hougues) is usually one way to the junction of Rue Du Hechet/Route De La Clos Au Comte OW.
)
|
Description:
|
Guernsey Kart and Motor Club LBG (GKandMC)
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Saturday, 21/06/25
|
Timing:
All Day
|
Promoter:
|
GKMC - Guernsey Kart and Motor Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LB 5A; LB 5B; LMDC 3A / LB 8A; LMDC 3B / LB 8B; N4
|
Cycle Access:
|
No
|
ST. SAVIOUR - RUE DU CAMP DU DOUIT
|
( RUE DES CRABBES to LA BILOTERIE ROAD )
|
Description:
|
Supply line alteration
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - CARRIERE LANE
|
( to LA ROUTE DU BRAYE )
|
Description:
|
Resurface road
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Infinity Construction Ltd
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
SS HS 2B;SS HS 3B;SS HS 4B;SS HS 4B NEW;SS HS 5B;SS HS 6B;SS HS 7B;SS HS 8B
|
Cycle Access:
|
No
|
VALE - LE PETIT MARAIS; GRANDE RUE to LES MARAIS LANE
|
( GRANDE RUE to LES MARAIS LANE )
|
Description:
|
Fix leaking meter
|
Start date:
|
Wednesday, 18/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Vale PS 1A;Vale PS 2B;LV HS 1A;LV HS 1B;LV HS 7B;SS HS 6A;SS HS 6B
|
Cycle Access:
|
Dismount past works
|
VALE - LE PICQUEREL
|
|
Description:
|
Repair failed tarmac around manhole chamber
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Sunday, 22/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LES CROUTES
|
( KING'S ROAD to RUE GODFREY )
|
Description:
|
Install new water service
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - St Mathews Church - Wedding - One Way
|
|
Description:
|
St Mathews Church - Wedding - One Way
|
Start date:
|
Saturday, 21/06/25
|
End date:
|
Sunday, 22/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 3A;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - the Classic Car Show
|
|
Description:
|
Guernsey Classic Vehicle Club
|
Start date:
|
Sunday, 15/06/25
|
End date:
|
Sunday, 15/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Classic Vehicle Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
Castel PS 1A;LMDC HS 5A;LMDC HS 6B;LMDC HS 7A;LV HS 5B;SS HS 4A NEW;LV HS LB HS 5B
|
Cycle Access:
|
Yes
|
ST. ANDREW - Funeral at St Andrews Church
|
( ROUTE DE ST. ANDRE to SA-MISC4 )
|
Description:
|
Funeral
|
Start date:
|
Monday, 16/06/25
|
End date:
|
Monday, 16/06/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Martels Funeral Services
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LB 4A
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. SAMPSON - LA ROUTE DE L'ISLET; SANDY LANE to LA ROUTE DU PICQUEREL
|
( SANDY LANE to LA ROUTE DU PICQUEREL )
|
Description:
|
Replace sunked chamber lid **TRIP HAZZARD ON FOOTPATH**
|
Start date:
|
Thursday, 19/06/25
|
End date:
|
Friday, 20/06/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
LV 1B; P2;13;21;91;92;N1
|
Cycle Access:
|
Yes
|
VALE - election day
|
|
Description:
|
Polling station access improvement
|
Start date:
|
Sunday, 15/06/25
|
End date:
|
Wednesday, 18/06/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
VALE - polling day
|
|
Description:
|
Election 2025
|
Start date:
|
Sunday, 15/06/25
|
End date:
|
Thursday, 19/06/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
LMDC HS 7B;LV HS 1A;LV HS 2A;LV HS 8A
|
Cycle Access:
|
Yes, in direction of one-way
|
No future major delays due to signals