Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - LES VIEUX BEAUCAMPS; RUETTE DES EFFARDS to RUE DE LA PERRUQUE
|
( RUETTE DES EFFARDS to RUE DE LA PERRUQUE )
|
Description:
|
Work starting 08:00 AM on Mon 06 Mar 23 and finishing 11:59 PM on Wed 29 Mar 23 - Slip line leaking main
|
Start date:
|
Monday, 06/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - ROUTE DE COBO
|
( LE DOUIT BOUDIN to RUE DE BOUVERIE )
|
Description:
|
Work starting 08:00 AM on Mon 20 Mar 23 and finishing 05:00 PM on Wed 29 Mar 23 - Chamber and duct installations
|
Start date:
|
Monday, 20/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Yes
|
FOREST - LES NICOLLES
|
( to FST-MISC28 )
|
Description:
|
Work starting 07:00 AM on Mon 27 Mar 23 and finishing 05:00 PM on Tue 11 Apr 23 - service alteration
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Tuesday, 11/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. MARTIN - LES HUBITS
|
|
Description:
|
Scaffolding ; Property: Maison des Arbres; Purpose: Roofing Works
|
Start date:
|
Monday, 13/03/23
|
End date:
|
Monday, 03/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LONG TRAC
|
( RUE DES CROUTES to RUE DES MARETTES )
|
Description:
|
Work starting 08:00 AM on Mon 20 Mar 23 and finishing 05:00 PM on Thu 06 Apr 23 - Network Upgrade
|
Start date:
|
Monday, 20/03/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - NEW PLACE
|
( VICTORIA ROAD to VAUVERT )
|
Description:
|
Loading and Unloading - Garden Excavation
|
Start date:
|
Friday, 24/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - NEW PLACE
|
|
Description:
|
Scaffolding No 34 Victoria Road ; Property: No 34 Victoria Road ; Purpose: Other (see Details)
|
Start date:
|
Wednesday, 01/03/23
|
End date:
|
Saturday, 01/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DE QUANTERAINE
|
( RUE DU BORDAGE to ROUTE DES SAGES )
|
Description:
|
large collapsed wall - blocking road
|
Start date:
|
Monday, 14/11/22
|
End date:
|
Friday, 28/04/23
|
Timing:
All Day
|
Promoter:
|
Jonathan Ogier
|
Contractor:
|
Jonathan Ogier
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Road is blocked by fallen debris - unsafe area
|
ST. SAVIOUR - ROUTE DES BORDAGES
|
|
Description:
|
Work starting 07:00 AM on Mon 20 Mar 23 and finishing 04:00 PM on Thu 06 Apr 23 - Road resurfacing
|
Start date:
|
Monday, 20/03/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Restricted: Walk through site
|
TORTEVAL - RUE DE LA FOLIE
|
( RUE DU GAINS to RUE DU HUREL )
|
Description:
|
Work starting 08:00 AM on Mon 20 Mar 23 and finishing 05:00 PM on Fri 31 Mar 23 - Excavating
|
Start date:
|
Monday, 20/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
Lotus Pools Ltd
|
Contractor:
|
Lotus Pools Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
TORTEVAL - RUE DES CAMBREES
|
( CHEMIN LE ROI to RUE GENETTE )
|
Description:
|
Closure to allow main overlay and services
|
Start date:
|
Monday, 20/02/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
TORTEVAL - RUE DU ROCHER
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Friday, 12/05/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: Road too narrow
|
VALE - LES CROUTES
|
( KING'S ROAD to RUE GODFREY )
|
Description:
|
Work starting 07:00 AM on Mon 27 Feb 23 and finishing 04:00 PM on Thu 06 Apr 23 - Demolishing and rebuilding roadside wall
|
Start date:
|
Monday, 27/02/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
East Coast Construction
|
Contractor:
|
East Coast Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - PORT SOIF LANE
|
( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
|
Description:
|
Work starting 07:30 AM on Mon 20 Feb 23 and finishing 05:00 PM on Fri 07 Apr 23 - Road resurfacing
|
Start date:
|
Monday, 20/02/23
|
End date:
|
Friday, 07/04/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Restricted: Dismount Signage
|
VALE - RUE DE L`ECOLE
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DES HAIZES
|
( LA BAILLOTERIE LANE to RUETTE DES HAIZES )
|
Description:
|
Install chamber and clear blocked duct
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA RUE DES FRENES
|
|
Description:
|
Temporary traffic signals for scaffolding in road
|
Start date:
|
Thursday, 23/03/23
|
End date:
|
Friday, 14/04/23
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - BOSQ LANE
|
|
Description:
|
Work starting 06:00 AM on Thu 28 Jul 22 and finishing 05:00 PM on Sun 27 Aug 23 - Scaffolding for internal building reconstruction; Property: Royal Terrace; Purpose: Other (see Details)
|
Start date:
|
Thursday, 28/07/22
|
End date:
|
Sunday, 27/08/23
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE COHU
|
( ROUTE DE SAUMAREZ to RUE DU FRIQUET )
|
Description:
|
Temporary traffic lights - Repair road side wall
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Friday, 14/04/23
|
Timing:
All Day
|
Promoter:
|
Keystone Masonry
|
Contractor:
|
Keystone Masonry
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - RUE DE LA VALLEE
|
( LES CAMPS DU MOULIN to LA RUE DES FRENES )
|
Description:
|
Work starting 09:00 AM on Thu 23 Mar 23 and finishing 03:00 PM on Thu 04 Jan 24 - Scaffolding and Construction Works
|
Start date:
|
Thursday, 23/03/23
|
End date:
|
Thursday, 04/01/24
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Traffic and Highway Services (Roadworks Coordination)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - ROUTE DES ADAMS
|
|
Description:
|
Final works to complete Les Adams substation replacement
|
Start date:
|
Monday, 27/03/23
|
End date:
|
Wednesday, 05/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61, 71, 93, 94, N3
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PIERRE DU BOIS - ROUTE DES PAYSANS
|
( RUE DE LA HOUGUETTE to ROUTE DES ADAMS )
|
Description:
|
Work starting 08:00 AM on Mon 20 Mar 23 and finishing 04:00 PM on Wed 05 Jul 23 - Rebuild of roadside wall.
|
Start date:
|
Monday, 20/03/23
|
End date:
|
Wednesday, 05/07/23
|
Timing:
All Day
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - LA BANQUETTE
|
|
Description:
|
Duct installation
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Tuesday, 11/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
42, N2
|
Cycle Access:
|
Yes
|
CASTEL - ROUTE DE COBO
|
( LA HAYE DU PUITS to RUETTE DE LA GENEROTTE )
|
Description:
|
Work starting 08:00 AM on Thu 30 Mar 23 and finishing 05:00 PM on Fri 31 Mar 23 - Duct installation across road
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DE LA VIEILLE MARE
|
|
Description:
|
Install new water main and services
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Friday, 28/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
42
|
Cycle Access:
|
Restricted: Cyclists to dismount
|
CASTEL - RUE DES EMRAIS
|
( RUE DES HOUMETS to ROUTE DE LA HOUGUE DU POMMIER )
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Monday, 03/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - Vazon Sprint - GKandMC
|
( RUE DU GELE to LA ROCQUETTE )
|
Description:
|
Guernsey Kart and Motor Club - Sprint
|
Start date:
|
Saturday, 01/04/23
|
End date:
|
Saturday, 01/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Kart and Motor Club
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
91, 92, N2
|
Cycle Access:
|
No: Motor Sport Event
|
ST. MARTIN - ICART ROAD
|
( RUE DES MARETTES to )
|
Description:
|
Closure of road section between Saints Bay Hotel and Icart Car Park for felling of pine trees. Car Park closed during works.
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Treevolution
|
Contractor:
|
Treevolution
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA PLANQUE LANE
|
|
Description:
|
Install ducting
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LE COURTILLET
|
( ROUTE DE JERBOURG to LE MONT DURAND )
|
Description:
|
Household removal
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Thursday, 30/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
A J Removals
|
Contractor:
|
A J Removals
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - School Street - Route des Coutures
|
|
Description:
|
Work starting 08:30 AM and finishing 09:00 AM - Closure of road section for School Street between: 8:30am and 9:00am
|
Start date:
|
Wednesday, 29/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
Before AM Peak
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - ST. MARTIN - ST. MARTIN - School Street - Route des Coutures
|
|
Description:
|
Closure of road section for School Street between: 2:45pm and 3:15pm
|
Start date:
|
Wednesday, 29/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - CHURCH SQUARE
|
|
Description:
|
Crane Lift
|
Start date:
|
Sunday, 02/04/23
|
End date:
|
Sunday, 02/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - GRANGE ROAD
|
|
Description:
|
Install new water service
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Friday, 07/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 41, 42, 51, 52, 60, 61, 71, 81, N2
|
Cycle Access:
|
Restricted: Dismount
|
ST. PETER PORT - Guernsey Marathon 2023
|
|
Description:
|
Work starting 08:00 AM on Sun 02 Apr 23 and finishing 05:00 PM on Sun 02 Apr 23 - Guernsey Marathon 2023
|
Start date:
|
Sunday, 02/04/23
|
End date:
|
Sunday, 02/04/23
|
Timing:
All Day
|
Promoter:
|
3D Events
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
12, 91, 92
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HAVILLAND STREET
|
|
Description:
|
Concrete pour at property. Pump and; x2 Agi
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Thursday, 30/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LA VRANGUE
|
|
Description:
|
Work starting 07:30 AM and finishing 04:30 PM daily between Thu 30 Mar 23 and Fri 31 Mar 23 - Tree Surgery Works
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Barrett Landscapes Ltd
|
Contractor:
|
Barrett Landscapes Ltd
|
Bus Routes Affected:
|
31, 32, 51, 52
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES VARDES
|
|
Description:
|
Tree Surgery Works
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Thursday, 30/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - ST STEPHEN`S HILL
|
|
Description:
|
service alteration
|
Start date:
|
Tuesday, 04/04/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VAUVERT
|
( GRANGE ROAD to LA COUPERDERIE )
|
Description:
|
Crane Lifts and Deliveries
|
Start date:
|
Saturday, 01/04/23
|
End date:
|
Saturday, 01/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
F Watson and Son
|
Contractor:
|
F Watson and Son
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DE L`ECLET
|
( RUE DES CARRIAUX to ROUTE DES PAYSANS )
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Tuesday, 04/04/23
|
End date:
|
Tuesday, 04/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - RUE DES ANNEVILLES; RUE DE LA TERRE NORGIOT to RUE DE LA HOUGUE MABAN
|
( RUE DE LA TERRE NORGIOT to RUE DE LA HOUGUE MABAN )
|
Description:
|
service alteration
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Wednesday, 05/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - RUE DE LA BELLEE
|
( RUE GENETTE to RUE DE LA PLANQUE )
|
Description:
|
Closure to allow for a mains overlay and services
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Tuesday, 23/05/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
TORTEVAL - RUE DE LA CROUTE
|
( RUE DES CLERCS to RUE COLLAS SIMON )
|
Description:
|
Tree Surgery Works
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Tuesday, 04/04/23
|
Timing:
All Day
|
Promoter:
|
Spruce Up
|
Contractor:
|
Spruce Up
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
TORTEVAL - RUE DES CAMBREES
|
|
Description:
|
LV fault in junction Les Sages and Cambrees
|
Start date:
|
Wednesday, 29/03/23
|
End date:
|
Wednesday, 05/04/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - ROUTE DES LANDES
|
( LA GRANDE RUE to LA RUE DU PASSEUR )
|
Description:
|
Chamber and ducting in road for new service install
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Wednesday, 05/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
11, 12, N1
|
Cycle Access:
|
Yes
|
VALE - RUE D`AVAL
|
( LES HAUTS COURTILS LANE to RUE COLIN )
|
Description:
|
Tree Surgery Works
|
Start date:
|
Wednesday, 29/03/23
|
End date:
|
Wednesday, 29/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - RUE DE LA GREVE
|
( LA VILLE BAUDU to LES HOUGUES PERES )
|
Description:
|
Chamber installation
|
Start date:
|
Wednesday, 29/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - Guernsey Marathon - Friday
|
|
Description:
|
Guernsey Marathon - Friday Set up day
|
Start date:
|
Friday, 31/03/23
|
End date:
|
Friday, 31/03/23
|
Timing:
All Day
|
Promoter:
|
3D Events
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - Guernsey Marathon - Saturday
|
|
Description:
|
Guernsey Marathon - Saturday - Set up day
|
Start date:
|
Saturday, 01/04/23
|
End date:
|
Saturday, 01/04/23
|
Timing:
All Day
|
Promoter:
|
3D Events
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - ROUTE DU COUDRE; RUE DE LA LICHOTERIE to RUE DU COUTEUR
|
( RUE DE LA LICHOTERIE to RUE DU COUTEUR )
|
Description:
|
Cable splicing
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Monday, 03/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - LA ROUTE DE L'ISLET
|
|
Description:
|
Road crossing trench from chamber to pole to lay new duct
|
Start date:
|
Monday, 03/04/23
|
End date:
|
Thursday, 06/04/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LES JUQUEURS ROAD
|
|
Description:
|
Cable splicing in chamber
|
Start date:
|
Tuesday, 04/04/23
|
End date:
|
Tuesday, 04/04/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - SOHIER ROAD
|
|
Description:
|
Cable jointing in chamber
|
Start date:
|
Thursday, 30/03/23
|
End date:
|
Thursday, 30/03/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|