Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - MONT D`AVAL
|
|
Description:
|
Work starting 07:00 AM on Tue 22 Oct 24 and finishing 11:59 PM on Sun 27 Oct 24 - Trial trench investigation works.
|
Start date:
|
Tuesday, 22/10/24
|
End date:
|
Sunday, 27/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
42, N2
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DE LA TRAPPE
|
( RUE DES MARAIS to DOUIT LANE )
|
Description:
|
Work starting 08:00 AM on Mon 21 Oct 24 and finishing 05:00 PM on Thu 24 Oct 24 - Duct installation
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Thursday, 24/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LES REBOUQUETS
|
|
Description:
|
Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - High and low voltage cable upgrade and duct lay
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. ANDREW - LA RUE DE LA CORBINERIE
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 21 Oct 24 and Thu 24 Oct 24 - CBT installations and cable splicing
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Thursday, 24/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES HUNGUETS
|
( ROUTE DES BLICQS to RUE DES BUTTES )
|
Description:
|
Duct installation
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - ROUTE DE ST. ANDRE
|
|
Description:
|
closure to allow for service alteration
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - ROUTE DES FAUCONNAIRES
|
( RUE DES TRUCHOTS to ROUTE DE LA CROIX AU BAILIFF )
|
Description:
|
Tree felling
|
Start date:
|
Tuesday, 22/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - CALAIS ROAD
|
( CALAIS to LE VARCLIN )
|
Description:
|
Closure to allow service upgrades
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES BLANCHES PIERRES
|
|
Description:
|
Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - ALLEZ STREET
|
|
Description:
|
Work starting 07:30 AM on Tue 24 Sep 24 and finishing 04:00 PM on Fri 25 Oct 24 - Footway repaving
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. PETER PORT - BACK STREET
|
|
Description:
|
Scaffolding ; Property: No 3; Purpose: Demolition / New Build
|
Start date:
|
Friday, 08/03/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
|
Start date:
|
Tuesday, 01/10/24
|
End date:
|
Friday, 17/01/25
|
Timing:
All Day
|
Promoter:
|
Bob Froome and Sons
|
Contractor:
|
Bob Froome and Sons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
( GAS LANE to LES AMBALLES )
|
Description:
|
Install new water service to new development
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
( GAS LANE to LES AMBALLES )
|
Description:
|
Install new telecoms service connection to new development
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET
|
( GAS LANE to LES AMBALLES )
|
Description:
|
Foul sewer connection to new property
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 15 Nov 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - ROUTE DE PLAISANCE
|
|
Description:
|
Work starting 07:30 AM on Mon 21 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Road resurfacing and patch repairs.
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
71, 93, 94, N3
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - RUE DES LOHIERS
|
|
Description:
|
Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
VALE - LA ROUTE MILITAIRE
|
( LA ROUTE DU BRAYE to LA FOLIE LANE )
|
Description:
|
Work starting 07:00 AM on Mon 21 Oct 24 and finishing 05:00 PM on Thu 24 Oct 24 - closure to allow for a service alteration
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Thursday, 24/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
12
|
Cycle Access:
|
Dismount past works
|
VALE - MAISON DE BAS ROAD
|
( LA CORVEE ROAD to LA MAISON AU COMPTE )
|
Description:
|
closure to allow for service alteration
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DU MARAIS
|
( LA VIELLE MARAIS to ROCQUE BALAN LANE )
|
Description:
|
Work starting 07:00 AM on Tue 15 Oct 24 and finishing 05:00 PM on Fri 25 Oct 24 - service alteration
|
Start date:
|
Tuesday, 15/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RETOT; LA GIFFARDIERE to LES QUERITES
|
( LA GIFFARDIERE to LES QUERITES )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Island Formwork and Construction Ltd
|
Contractor:
|
Island Formwork and Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
For construction of 3 flats
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Just Build It Ltd
|
Contractor:
|
Just Build It Ltd
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - COBO COAST ROAD
|
( ROUTE DE COBO to ROUTE DE CARTERET )
|
Description:
|
Rebuilding of boundary wall
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Sunday, 17/11/24
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. ANDREW - ROUTE DE ST ANDRE (LE BOUILLON ROAD); ROUTE DE L'ISSUE to RUETTE DES COURTILLETS
|
( ROUTE DE L'ISSUE to RUETTE DES COURTILLETS )
|
Description:
|
Work starting 08:00 AM on Mon 21 Oct 24 and finishing 06:00 PM on Wed 23 Oct 24 - Upgrade surface water network
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - ROUTE DE PORT GRAT; ROUTE DE PULIAS to LES DICQS
|
( ROUTE DE PULIAS to LES DICQS )
|
Description:
|
Rebuilding roadside wall.
|
Start date:
|
Monday, 14/10/24
|
End date:
|
Saturday, 16/11/24
|
Timing:
All Day
|
Promoter:
|
Another Level Ltd
|
Contractor:
|
Another Level Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAMPSON - SANDY HOOK
|
|
Description:
|
Building road side boundary wall.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Breaton Construction
|
Contractor:
|
Breaton Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DE L'ISLET; LA GARENNE to L'ABBAYE
|
( LA GARENNE to L'ABBAYE )
|
Description:
|
service alteration.
|
Start date:
|
Monday, 21/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - LA NEUVE RUE
|
|
Description:
|
Work starting 07:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Fri 15 Nov 24 - Upgrade foul water manhole
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 51, 52
|
Cycle Access:
|
Dismount past works
|
CASTEL - LES BEAUCAMPS
|
( LES VIEUX BEAUCAMPS to MONT D`AVAL )
|
Description:
|
Work starting 12:00 AM on Mon 28 Oct 24 and finishing 11:59 PM on Sun 03 Nov 24 - Undertake trial trench investigation works
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Sunday, 03/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DE GALAAD
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
41, N2
|
Cycle Access:
|
Yes
|
CASTEL - RUE DE LA MASSE
|
( RUE ST. GERMAIN to RUETTE DE LA GENEROTTE )
|
Description:
|
Tree surgery works.
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arborcraft Ltd
|
Contractor:
|
Arborcraft Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE ST. BRIOCQ
|
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 08/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Traffic and Highway Services (Capital Works)
|
Bus Routes Affected:
|
60, 61
|
Cycle Access:
|
No: dismount
|
CASTEL - RUETTE DU COURTIL SIMON
|
( ROUTE DE COBO to RUETTE DU VILLOCQ )
|
Description:
|
supply line alteration
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Thursday, 31/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - SOUS LES COURTILS
|
( ROUTE DE LA MARE to RUE D'ALBECQ )
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Friday, 25/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LA ROBERGE
|
( RUE DU CATOROHE to LA RUE DU BIGARD )
|
Description:
|
2 x Chamber installations
|
Start date:
|
Thursday, 24/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LA RUE DE L`EPINEL
|
( LA RUE DES VILLETS to LA RUE DE LA VRANGUE )
|
Description:
|
Work starting 08:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Tue 29 Oct 24 - Chamber installation
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LONGUE RUE
|
( LA RUE MAZE to LA ROUTE DES COUTURES )
|
Description:
|
Work starting 08:00 AM on Mon 28 Oct 24 and finishing 04:00 PM on Wed 30 Oct 24 - Cable splicing and excavate blocked duct
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ANN`S PLACE
|
( COLLEGE STREET to MOTOR CYCLE PARK )
|
Description:
|
Cable and CBT installations
|
Start date:
|
Wednesday, 23/10/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - DAMOUETTES LANE
|
|
Description:
|
Sewer Rehabilitation - Survey
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - FIRST TOWER LANE
|
( LE GRAND BOUET to LES BANQUES )
|
Description:
|
Dismantling scaffolding.
|
Start date:
|
Wednesday, 23/10/24
|
End date:
|
Thursday, 24/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - GEORGE STREET
|
( VAUVERT to ALLEZ STREET )
|
Description:
|
Trial pit in footpath
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LOWER POLLET
|
|
Description:
|
Erection of Christmas Lights
|
Start date:
|
Sunday, 27/10/24
|
End date:
|
Sunday, 27/10/24
|
Timing:
All Day
|
Promoter:
|
Event Hire Guernsey Ltd
|
Contractor:
|
Event Hire Guernsey Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - UPLAND ROAD
|
( GRANGE ROAD to MONUMENT GARDENS )
|
Description:
|
CBT and spine cable installation
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE ROCQUAINE
|
( RUE DE L'ISSUE to RUE DU DOUIT DU MOULIN )
|
Description:
|
service alteration
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Thursday, 31/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
61, 71, 91, 92, 93, 94, N3
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LA ROUTE DES CAPELLES
|
|
Description:
|
Repairs to footpath
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
All Day
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes
|
ST. SAMPSON - ROUTE CARRE
|
|
Description:
|
Work starting 07:00 AM on Fri 25 Oct 24 and finishing 05:00 PM on Fri 29 Nov 24 - Distribution pillar installation and low voltage cabling upgrade
|
Start date:
|
Friday, 25/10/24
|
End date:
|
Friday, 29/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2, 13, 21, N1,
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - ROUTE DU CAMP DU ROI
|
( RUE DES ANNEVILLES to LES ABREUVEURS ROAD )
|
Description:
|
Work starting 08:00 AM on Tue 29 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber installation, cable installation and splicing
|
Start date:
|
Tuesday, 29/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - RUE DES MONTS
|
( RUE DES POINTUES ROCQUES to )
|
Description:
|
Service alteration
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LA GRANDE LANDE
|
( RUE DES LOHIERS to RUE DES RIGNEAUX )
|
Description:
|
Crane Lift.
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Verdellis Construction
|
Contractor:
|
Verdellis Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - BELVAL ROAD
|
( ROUTE DES COUTURES to VILLE ES PIES )
|
Description:
|
Work starting 08:00 AM on Mon 28 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Chamber and duct installation
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LES BARRAS LANE
|
( LES GRANDES MIELLES LANE to PLEINHEAUME ROAD )
|
Description:
|
Excavate blocked duct
|
Start date:
|
Wednesday, 23/10/24
|
End date:
|
Thursday, 24/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DES HAIZES
|
( SOHIER ROAD to ROSELAND LANE )
|
Description:
|
Install new water service
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - COLLINGS ROAD
|
|
Description:
|
scaffolding erection; Property: Beehive; Purpose: External Decoration
|
Start date:
|
Saturday, 26/10/24
|
End date:
|
Sunday, 24/11/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - Bunker of Horrors 2024
|
( Route Des Adams to Bas Rouvets )
|
Description:
|
Bunker of Horrors 2024
|
Start date:
|
Saturday, 26/10/24
|
End date:
|
Monday, 28/10/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - ROUTE DE L'EGLISE; RUE DU PREEL to RUETTE DE TOUILLETS
|
( RUE DU PREEL to RUETTE DE TOUILLETS )
|
Description:
|
Splicing new connections
|
Start date:
|
Monday, 28/10/24
|
End date:
|
Wednesday, 30/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - COLLEGE STREET; ST. JAMES STREET to ST. JULIAN'S AVENUE
|
( ST. JAMES STREET to ST. JULIAN'S AVENUE )
|
Description:
|
Road repairs
|
Start date:
|
Sunday, 27/10/24
|
End date:
|
Sunday, 27/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32, 41, 42, 51, 52, 60, 61, 71, 81, N2
|
Cycle Access:
|
Yes
|