Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - RUE DU PRESBYTERE
Description: Drainage Repairs
Start date: Sunday, 01/12/24 End date: Tuesday, 03/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: P2, 51 Cycle Access: Dismount past works

CASTEL - RUE DU PRESBYTERE
Description: Install new water mains
Start date: Monday, 11/11/24 End date: Friday, 20/12/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: P2, 51, 52 Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Tuesday, 31/12/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

Emergency Activity - ST. PETER PORT - ROUGE RUE
Description: To repair an Electrical Fault
Start date: Monday, 25/11/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

Emergency Activity - VALE - LES ROCQUES BARREES ROAD
Description: To Repair An Electrical Fault
Start date: Friday, 29/11/24 End date: Monday, 02/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 11, 91, 92 Cycle Access: Dismount past works

FOREST - LA RUE DES CROISEE ( LES MESSURIERS to LE BOURG )
Description: Work starting 08:00 AM on Mon 25 Nov 24 and finishing 11:59 PM on Tue 03 Dec 24 - Chamber and duct installation
Start date: Monday, 25/11/24 End date: Tuesday, 03/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - LES REBOUQUETS
Description: Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 20 Dec 24 - High and low voltage cable upgrade and duct lay
Start date: Wednesday, 09/10/24 End date: Friday, 20/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: No

ST. ANDREW - ROUTE DE ST. ANDRE
Description: Tree surgery and pole replacement
Start date: Monday, 02/12/24 End date: Tuesday, 03/12/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: 71 Cycle Access: Dismount past works

ST. MARTIN - LA RUETTE DU NAVET ( ICART ROAD to SAINTS BAY ROAD )
Description: Work starting 08:00 AM on Tue 26 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Chamber installation
Start date: Tuesday, 26/11/24 End date: Monday, 02/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LA RUETTE DU NAVET
Description: Chamber and duct installation
Start date: Wednesday, 27/11/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Dismount past works

ST. MARTIN - LES CAMPS DU MOULIN
Description: Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Replace access cover on Camps du Moulin
Start date: Monday, 25/11/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Dismount past works

ST. MARTIN - LES CAMPS DU MOULIN ( RUE JACQUES GUILLE to RUE DE LA VALLEE )
Description: Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Fri 06 Dec 24 - Install new water services
Start date: Monday, 25/11/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Dismount past works

ST. MARTIN - RUE POUDREUSE
Description: Work starting 07:00 AM on Wed 27 Nov 24 and finishing 05:00 PM on Wed 04 Dec 24 - Undertake road surface repairs
Start date: Wednesday, 27/11/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Dismount past works

ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX ( RUE CAUCHEZ to LES FRIETEAUX )
Description: Work starting 08:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Mon 02 Dec 24 - Replace 2 x failing chamber covers
Start date: Monday, 25/11/24 End date: Monday, 02/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - RUE POUDREUSE; RUE CAUCHEZ to LES FRIETEAUX ( RUE CAUCHEZ to LES FRIETEAUX )
Description: Work starting 07:00 AM on Mon 25 Nov 24 and finishing 05:00 PM on Wed 04 Dec 24 - Repair failed reinstatements around water meters
Start date: Monday, 25/11/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 81 Cycle Access: Yes

ST. PETER PORT - HAVELET ( THE STRAND to HAUTEVILLE )
Description: Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
Start date: Tuesday, 01/10/24 End date: Friday, 17/01/25 Timing: All Day
Promoter: Bob Froome and Sons Contractor: Bob Froome and Sons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE BOUET
Description: Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
Start date: Wednesday, 16/10/24 End date: Thursday, 16/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LES PETITES FONTAINES ( MOUNT HERMON to VALNORD ROAD )
Description: Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Fri 31 Jan 25 - wall repairs
Start date: Friday, 22/11/24 End date: Friday, 31/01/25 Timing: All Day
Promoter: TNT Stonemasons Contractor: TNT Stonemasons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES VAUXLAURENS
Description: Scaffold to access for emergency works from storm damage; Property: Apartments 4 and 29 St Julians Avenue; Purpose: Roofing Works
Start date: Friday, 29/11/24 End date: Sunday, 26/01/25 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LOWER CANICHERS ( LE TRUCHOT to DOYLE STREET )
Description: Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
Start date: Monday, 30/09/24 End date: Monday, 28/04/25 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - NEW PLACE ( VICTORIA ROAD to VAUVERT )
Description: Erecting scaffolding.
Start date: Monday, 25/11/24 End date: Thursday, 12/12/24 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - RUE A L`OR ( RICHMOND AVENUE to KINGS ROAD )
Description: Rue a L`Or substation installation and high voltage cable upgrade (Phase 1)
Start date: Monday, 25/11/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
Start date: Wednesday, 10/07/24 End date: Saturday, 12/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE LIHOU ( RUE DU LONGFRIE to RUE DES GRANDES RUES )
Description: Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Sat 15 Mar 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
Start date: Thursday, 29/08/24 End date: Saturday, 15/03/25 Timing: All Day
Promoter: Traffic and Highways Contractor: Traffic and Highways
Bus Routes Affected: Cycle Access: No

ST. PIERRE DU BOIS - ROUTE DES SAGES
Description: Work starting 07:30 AM on Mon 25 Nov 24 and finishing 04:00 PM on Fri 13 Dec 24 - Road resurfacing
Start date: Monday, 25/11/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: 61 Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE ST PIERRE
Description: Chamber and duct installation
Start date: Wednesday, 27/11/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 71 Cycle Access: Dismount past works

ST. SAMPSON - LES MARTINS ( RUE SAUVAGE to LES TRACHERIES ROAD )
Description: Work starting 07:00 AM on Fri 29 Nov 24 and finishing 05:00 PM on Tue 03 Dec 24 - Repair existing cover and frame
Start date: Friday, 29/11/24 End date: Tuesday, 03/12/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. SAMPSON - LES MARTINS
Description: Low voltage cable upgrade
Start date: Monday, 04/11/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. SAMPSON - LOWLANDS ROAD ( to SALTPANS ROAD )
Description: new supply line
Start date: Monday, 02/12/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - LONGUE RUE ( LA GRANDE RUE to RUE DES CRABBES )
Description: Grit blasting railings.
Start date: Monday, 02/12/24 End date: Monday, 02/12/24 Timing: Between AM and PM Peaks
Promoter: C and D Carpenters Contractor: C and D Carpenters
Bus Routes Affected: Cycle Access: Yes

ST. SAVIOUR - RUE DES LONGS CAMPS
Description: Chamber and duct installation
Start date: Monday, 25/11/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - CARRIERE LANE ( to LA ROUTE DU BRAYE )
Description: Low voltage cabling upgrade and new connections
Start date: Monday, 18/11/24 End date: Wednesday, 18/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: No

VALE - PORT SOIF LANE ( LES GRANDES MIELLES LANE to PORT SOIF ROAD )
Description: Road reconstruction and resurfacing
Start date: Monday, 04/11/24 End date: Friday, 20/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: 41 Cycle Access: Dismount past works

VALE - RUE DE FRANCAIS ( LES MARAIS LANE to RUE DE L'ECOLE )
Description: supply line upgrade
Start date: Monday, 02/12/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DU MARAIS ( ROCQUE BALAN LANE to LES MIELLES ROAD )
Description: supply line upgrade
Start date: Wednesday, 27/11/24 End date: Tuesday, 03/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. PETER PORT - LE BOUET
Description: Work starting 07:00 AM on Mon 23 Sep 24 and finishing 05:00 PM on Mon 30 Dec 24 - For construction of 3 flats
Start date: Monday, 23/09/24 End date: Monday, 30/12/24 Timing: All Day
Promoter: Just Build It Ltd Contractor: Just Build It Ltd
Bus Routes Affected: 31, 32 Cycle Access: Yes, in direction of one-way

Signals
CASTEL - RUE DE LA SALINE; ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BUS STOP ( ROUTE DE LA MARE DE CARTERET to GRANDES ROCQUES BU )
Description: Work starting 08:00 AM on Mon 02 Dec 24 and finishing 05:00 PM on Fri 06 Dec 24 - Investigation and Repair
Start date: Monday, 02/12/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

VALE - LA ROUTE DU BRAYE; LES MARES PELLEES to SOHIER ROAD ( LES MARES PELLEES to SOHIER ROAD )
Description: Work starting 08:00 AM and finishing 05:00 PM daily between Mon 25 Nov 24 and Wed 11 Dec 24 - Rebuilding roadside wall.
Start date: Monday, 25/11/24 End date: Wednesday, 11/12/24 Timing: Between AM and PM Peaks
Promoter: meervelds Contractor: meervelds
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - ROUTE DE CARTERET
Description: CCTV Camera Clean
Start date: Monday, 02/12/24 End date: Tuesday, 03/12/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 42 Cycle Access: Yes

CASTEL - RUE DE LA FOIRE ( RUETTE DES EFFARDS to )
Description: Splicing joint
Start date: Friday, 06/12/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: JT Guernsey Contractor: JT Guernsey
Bus Routes Affected: Cycle Access: Yes

FOREST - LE CHEMIN LE ROI
Description: Fibre duct installation
Start date: Tuesday, 03/12/24 End date: Tuesday, 03/12/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - ROUTE DE ST. ANDRE; L'ECLUSE to RUE DE LA BOULLERIE ( L'ECLUSE to RUE DE LA BOULLERIE )
Description: Brick capping to roadside wall
Start date: Monday, 02/12/24 End date: Wednesday, 04/12/24 Timing: All Day
Promoter: Vaudin Stonemasons Contractor: Vaudin Stonemasons
Bus Routes Affected: Cycle Access: Yes

ST. ANDREW - ROUTE DES BLICQS
Description: Work starting 07:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Fri 06 Dec 24 - Drainage Works
Start date: Tuesday, 03/12/24 End date: Friday, 06/12/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - LA RUE MAZE
Description: CCTV Camera Clean
Start date: Sunday, 08/12/24 End date: Sunday, 08/12/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 81, 91, 92, 93, 94, 95, N3 Cycle Access: Yes

ST. MARTIN - LES HURETTES
Description: High and low voltage cable installation, jointing and fibre duct pull
Start date: Wednesday, 04/12/24 End date: Friday, 31/01/25 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - RUE DE LA VILLETTE
Description: CCTV camera clean
Start date: Thursday, 05/12/24 End date: Friday, 06/12/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 81 Cycle Access: Yes

ST. MARTIN - SAINTS BAY ROAD ( LA MOTTE to LA RUETTE DU NAVET )
Description: Chamber installation and repair blocked duct
Start date: Monday, 09/12/24 End date: Thursday, 12/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - St Martins Christmas Market
Description: St Martins Christmas Market
Start date: Monday, 02/12/24 End date: Monday, 02/12/24 Timing: After PM Peak
Promoter: Constables of St Martin Contractor: N/A
Bus Routes Affected: 81, 91, 92, 93, 94, 95, N3 Cycle Access: Dismount past works

ST. PETER PORT - BROCK ROAD
Description: Work starting 08:00 AM on Mon 09 Dec 24 and finishing 05:00 PM on Fri 13 Dec 24 - Chamber and duct installations
Start date: Monday, 09/12/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - DAMOUETTES LANE
Description: Site Investigation / Trial Trenches
Start date: Monday, 09/12/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES OZOUETS ROAD
Description: Trial Hole Excavations
Start date: Monday, 09/12/24 End date: Friday, 13/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: 51, 52 Cycle Access: Dismount past works

ST. PETER PORT - ST. PETER PORT - Christmas Late Night Shopping
Description: Christmas Late Night Shopping
Start date: Thursday, 05/12/24 End date: Thursday, 05/12/24 Timing: After PM Peak
Promoter: Black Vanilla Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UNION STREET ( ST. JOHN STREET to LITTLE ST. JOHN STREET )
Description: Crane for lifting scaffold beams
Start date: Saturday, 07/12/24 End date: Saturday, 07/12/24 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UPLAND ROAD ( GRANGE ROAD to MONUMENT GARDENS )
Description: Household removal.
Start date: Saturday, 07/12/24 End date: Saturday, 07/12/24 Timing: Between AM and PM Peaks
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE LA POMARE ( RUE DES SALINES to RUE DE LA CACHE )
Description: Work starting 09:00 AM and finishing 02:00 PM - Painting gable of house.
Start date: Tuesday, 03/12/24 End date: Tuesday, 03/12/24 Timing: Between AM and PM Peaks
Promoter: Event Hire Guernsey Ltd Contractor: Event Hire Guernsey Ltd
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - Bridge Christmas Lights 2024
Description: Bridge Christmas Lights 2024
Start date: Friday, 06/12/24 End date: Friday, 06/12/24 Timing: Between AM and PM Peaks
Promoter: Private Individual Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - LA GRANDE RUE
Description: Work starting 09:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Tue 03 Dec 24 - tree surgery
Start date: Tuesday, 03/12/24 End date: Tuesday, 03/12/24 Timing: All Day
Promoter: Arbology Contractor: Arbology
Bus Routes Affected: 60, 61 Cycle Access: Dismount past works

TORTEVAL - Guernsey Velo Club - Cyclocross
Description: Guernsey Velo Club - Cyclocross
Start date: Sunday, 08/12/24 End date: Sunday, 08/12/24 Timing: Before AM Peak
Promoter: Guernsey Velo Club LBG Contractor: N/A
Bus Routes Affected: Cycle Access: No

TORTEVAL - RUE DES BROUARDS ( RUE GENETTE to )
Description: Removal of earth bank.
Start date: Monday, 09/12/24 End date: Wednesday, 18/12/24 Timing: Between AM and PM Peaks
Promoter: Alabaster Austin Construction Contractor: Alabaster Austin Construction
Bus Routes Affected: Cycle Access: Yes

VALE - Bridge Christmas Lights 2024
Description: Bridge Christmas Lights 2024
Start date: Friday, 06/12/24 End date: Friday, 06/12/24 Timing: Between AM and PM Peaks
Promoter: Private Individual Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LES ROUVETS ROAD ( RUE DES ANNEVILLES to RUE DES MARAIS )
Description: Work starting 07:00 AM on Tue 03 Dec 24 and finishing 05:00 PM on Thu 05 Dec 24 - service alteration
Start date: Tuesday, 03/12/24 End date: Thursday, 05/12/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

One Ways
ST. SAVIOUR - Winter Wonderland - Rue Des Issues & Rue Au Page
Description: Winter Wonderland - Rue Des Issues and Rue Au Page
Start date: Wednesday, 04/12/24 End date: Thursday, 05/12/24 Timing: Between AM and PM Peaks
Promoter: Lions Club Guernsey Contractor: N/A
Bus Routes Affected: 71 Cycle Access: Yes, in direction of one-way

Signals
No future major delays due to signals