Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - CASTEL - ROUTE DE COBO
|
|
Description:
|
emergency water leak
|
Start date:
|
Saturday, 05/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
Emergency Activity - ST. PETER PORT - VAUVERT
|
|
Description:
|
Emergency cable fault repair
|
Start date:
|
Thursday, 03/10/24
|
End date:
|
Thursday, 10/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. MARTIN - LES HURETTES
|
|
Description:
|
Work starting 07:00 AM on Mon 19 Aug 24 and finishing 07:00 AM on Fri 18 Oct 24 - High and low voltage cabling upgrade
|
Start date:
|
Monday, 19/08/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. MARTIN - RUE JACQUES GUILLE
|
( LE ROCHER to LES CAMPS DU MOULIN )
|
Description:
|
Work starting 07:00 AM on Mon 30 Sep 24 and finishing 05:00 PM on Mon 14 Oct 24 - Connect raw water main
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 14/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ALLEZ STREET
|
|
Description:
|
Work starting 07:30 AM on Tue 24 Sep 24 and finishing 04:00 PM on Fri 25 Oct 24 - Footway repaving
|
Start date:
|
Tuesday, 24/09/24
|
End date:
|
Friday, 25/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. PETER PORT - BACK STREET
|
|
Description:
|
Scaffolding ; Property: No 3; Purpose: Demolition / New Build
|
Start date:
|
Friday, 08/03/24
|
End date:
|
Tuesday, 29/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HAVELET
|
( THE STRAND to HAUTEVILLE )
|
Description:
|
Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
|
Start date:
|
Tuesday, 01/10/24
|
End date:
|
Friday, 17/01/25
|
Timing:
All Day
|
Promoter:
|
Bob Froome and Sons
|
Contractor:
|
Bob Froome and Sons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Work starting 10:00 AM on Mon 02 Oct 23 and finishing 05:00 PM on Tue 31 Dec 24 - Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
|
Start date:
|
Monday, 02/10/23
|
End date:
|
Tuesday, 31/12/24
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES OBERLANDS
|
( LA RUE DE LA CORBINERIE to LES FRIETEAUX )
|
Description:
|
Work starting 07:00 AM on Thu 03 Oct 24 and finishing 05:00 PM on Wed 09 Oct 24 - service alteration
|
Start date:
|
Thursday, 03/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
P2, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES OBERLANDS
|
|
Description:
|
Work starting 07:00 AM on Mon 30 Sep 24 and finishing 05:00 PM on Wed 09 Oct 24 - Install new water service(s)
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 71, 81
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - PRINCE ALBERT ROAD
|
|
Description:
|
Work starting 07:00 AM on Sat 05 Oct 24 and finishing 05:00 PM on Fri 18 Oct 24 - High and low voltage cabling upgrade
|
Start date:
|
Saturday, 05/10/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
P2, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 15 Nov 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Friday, 15/11/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DES CLERCS
|
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 16/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - ROUTE DES HOUGUETS
|
|
Description:
|
Road resurfacing
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES JENEMIES
|
( LA BILOTERIE ROAD to RUE DU RIGNET )
|
Description:
|
Work starting 08:00 AM on Wed 02 Oct 24 and finishing 05:00 PM on Tue 08 Oct 24 - Chamber and duct installation
|
Start date:
|
Wednesday, 02/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DU MONT SAINT
|
( RUE DES HURIAUX to LE MONT SAINT )
|
Description:
|
Work starting 07:00 AM on Thu 16 May 24 and finishing 05:00 PM on Fri 01 Nov 24 - Site compound
|
Start date:
|
Thursday, 16/05/24
|
End date:
|
Friday, 01/11/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA MAZOTTE
|
( LA HOUGUE RICART to HOUMTEL LANE )
|
Description:
|
Dismantling scaffolding.
|
Start date:
|
Sunday, 06/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Elevations
|
Contractor:
|
Elevations
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DU BRAYE
|
|
Description:
|
Tarmac repairs
|
Start date:
|
Thursday, 26/09/24
|
End date:
|
Monday, 07/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
11, 12, 13, N1
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DU BRAYE
|
( CARRIERE LANE to CARRIERE LANE )
|
Description:
|
Supply line upgrade
|
Start date:
|
Saturday, 05/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
11, 12, 13, N1
|
Cycle Access:
|
Dismount past works
|
VALE - LA ROUTE DU BRAYE
|
|
Description:
|
Low voltage cable upgrade
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
11, 12, 13, N1
|
Cycle Access:
|
Dismount past works
|
VALE - LES GRIPPIOS
|
( PETITE HOUGUES to RUE DES BORDEAUX )
|
Description:
|
Replacing gravel paths to church - Road closed Monday to Friday only
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
C. A. Duquemin Ltd
|
Contractor:
|
C. A. Duquemin Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
For construction of 3 flats
|
Start date:
|
Monday, 23/09/24
|
End date:
|
Wednesday, 23/10/24
|
Timing:
All Day
|
Promoter:
|
Just Build It Ltd
|
Contractor:
|
Just Build It Ltd
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes, in direction of one-way
|
CASTEL - COBO COAST ROAD
|
( ROUTE DE COBO to ROUTE DE CARTERET )
|
Description:
|
Rebuilding of boundary wall
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Sunday, 17/11/24
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - ROUTE DE COBO; RUETTE DU COURTIL SIMON to RUETTE DE LA CROIX
|
( RUETTE DU COURTIL SIMON to RUETTE DE LA CROIX )
|
Description:
|
Work starting 08:00 AM on Thu 10 Oct 24 and finishing 05:00 PM on Tue 15 Oct 24 - Duct installation
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Tuesday, 15/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DES FAUXQUETS
|
( RUE DES BOULAINS to CANDIE ROAD )
|
Description:
|
Tree Root Damage Repair
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DES GODDARDS
|
( VAZON ROAD to ROUTE DE LA MARE )
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Tuesday, 08/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DU FRIE PLAIDY
|
|
Description:
|
Pothole Repairs
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE ST. GERMAIN
|
|
Description:
|
Hedge Cutting.
|
Start date:
|
Saturday, 12/10/24
|
End date:
|
Saturday, 12/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
States Works
|
Contractor:
|
States Works
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE LA CROIX
|
|
Description:
|
Work starting 08:00 AM on Mon 07 Oct 24 and finishing 05:00 PM on Wed 09 Oct 24 - Duct installation
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
FOREST - LA RUE DU BIGARD
|
( LA ROBERGE to CHASSE DES GALLIENNES )
|
Description:
|
Pothole repairs
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Thursday, 10/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LA RUE DU MONT MARCHE
|
( LA RUE DE L'EPINEL to )
|
Description:
|
Roadside driveway improvement and resurfacing - Maison Du Pre
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - LES REBOUQUETS
|
|
Description:
|
Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - High and low voltage cable upgrade and duct lay
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Friday, 22/11/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. ANDREW - LA RUE DE LA CORBINERIE
|
|
Description:
|
CBT installations and cable splicing
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - RUE DES POINTES
|
( ROUTE DE LA CROIX AU BAILIFF to )
|
Description:
|
Work starting 08:00 AM on Mon 07 Oct 24 and finishing 05:00 PM on Fri 11 Oct 24 - Chamber installations
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA ROUTE DE BLANCHES
|
( COIN COLIN to LES SALINES )
|
Description:
|
Pothole Repairs
|
Start date:
|
Friday, 11/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
81
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LE VARCLIN
|
( LA ROUTE DE SAUSMAREZ to LES MAINDONAUX )
|
Description:
|
Pothole repairs
|
Start date:
|
Friday, 11/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DES CROUTES
|
( LONG TRAC to RUE DES MARETTES )
|
Description:
|
Work starting 08:00 AM on Mon 07 Oct 24 and finishing 05:00 PM on Fri 11 Oct 24 - Chamber and duct installations
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - CANDIE ROAD
|
|
Description:
|
Gutter maintenance.
|
Start date:
|
Sunday, 13/10/24
|
End date:
|
Sunday, 13/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Q3 CI Ltd
|
Contractor:
|
Q3 CI Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - CHURCH SQUARE
|
( QUAY STREET to MARKET HILL )
|
Description:
|
Crane.
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
F Watson and Son
|
Contractor:
|
F Watson and Son
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - Court Circuited
|
( MOTOR CYCLE PARK to LA RUE MARGUERITE )
|
Description:
|
Work starting 07:00 AM on Fri 11 Oct 24 and finishing 04:00 PM on Fri 11 Oct 24 - Court Circuited
|
Start date:
|
Friday, 11/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Bailiff`s Chambers
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES PETITES FONTAINES
|
( QUEENS ROAD to MOUNT HERMON )
|
Description:
|
Tree Surgery Works
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Monday, 07/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MANSELL STREET
|
|
Description:
|
Duct installation
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - MOUNT HERMON
|
( LES PETITES FONTAINES to VICTORIA ROAD )
|
Description:
|
Crane lift
|
Start date:
|
Tuesday, 08/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
All Day
|
Promoter:
|
UCF Civil Engineering
|
Contractor:
|
UCF Civil Engineering
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - PARIS STREET
|
( NEW PARIS ROAD to ST. GEORGE'S ESPLANADE )
|
Description:
|
Striping scaffolding.
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DES CLERCS
|
( ROUTE DE LA LAGUE to RUE DU CAMPERE )
|
Description:
|
service alteration to electricity supply at a property
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - SANDY LANE
|
( LES PETITES MIELLES to LA ROUTE DE L'ISLET )
|
Description:
|
Work starting 07:00 AM on Mon 07 Oct 24 and finishing 05:00 PM on Fri 18 Oct 24 - Install new foul sewer and services
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 18/10/24
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUETTE DES VAUXBELETS
|
( to COURTIL RONCHIN )
|
Description:
|
Pothole repairs
|
Start date:
|
Wednesday, 09/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA MIELLETTE LANE
|
( DEHUS LANE to RUE DES CHAPELLES )
|
Description:
|
Tree surgery works.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Tuesday, 08/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Treevolution
|
Contractor:
|
Treevolution
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LES GRANDS MARAIS
|
( RUE DE FRANCAIS to LES HAUTES LANDES )
|
Description:
|
Work starting 07:00 AM on Mon 07 Oct 24 and finishing 05:00 PM on Wed 09 Oct 24 - Install water service and replace old meter chambers
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - NORTH SIDE
|
|
Description:
|
Work starting 07:15 PM and finishing 01:00 AM - Evening works CCTV Camera Clean
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
Before AM Peak
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
P2, 11, 12, 13, 92, N1
|
Cycle Access:
|
Yes
|
CASTEL - RETOT; LA GIFFARDIERE to LES QUERITES
|
( LA GIFFARDIERE to LES QUERITES )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Thursday, 07/11/24
|
Timing:
All Day
|
Promoter:
|
Island Formwork and Construction Ltd
|
Contractor:
|
Island Formwork and Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PETER PORT - LA BUTTE
|
|
Description:
|
Work starting 07:00 AM on Thu 10 Oct 24 and finishing 05:00 PM on Fri 11 Oct 24 - To unload scaffolding
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Friday, 11/10/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Yes, in direction of one-way
|
FOREST - ROUTE DES BLICQS; LE RUSSEL ROAD to LES BLICQS LANE
|
( LE RUSSEL ROAD to LES BLICQS LANE )
|
Description:
|
Pothole repairs
|
Start date:
|
Thursday, 10/10/24
|
End date:
|
Thursday, 10/10/24
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - AMHERST
|
|
Description:
|
streetlight replacement
|
Start date:
|
Tuesday, 08/10/24
|
End date:
|
Wednesday, 09/10/24
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - SANDY HOOK
|
|
Description:
|
Building road side boundary wall.
|
Start date:
|
Monday, 07/10/24
|
End date:
|
Friday, 25/10/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Breaton Construction
|
Contractor:
|
Breaton Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|