Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - LES GRANDES ROCQUES
Description: Supply line alteration
Start date: Monday, 19/01/26 End date: Wednesday, 21/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: LMDC 7B; SS 8A; SS 8B; N2 Cycle Access: Dismount past works

CASTEL - RUETTE DE LA GENEROTTE ( ROUTE DE COBO to RUETTE DE FRIES )
Description: Removal and rebuild of granite wall
Start date: Monday, 05/01/26 End date: Monday, 23/02/26 Timing: All Day
Promoter: Adie Exall Stonemason Contractor: Adie Exall Stonemason
Bus Routes Affected: Cycle Access: No

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Thu 30 Apr 26 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Thursday, 30/04/26 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

Emergency Activity - CASTEL - ROUTE DE COBO
Description: Work starting 08:00 AM on Fri 09 Jan 26 and finishing 05:00 PM on Thu 22 Jan 26 - fallen tree
Start date: Friday, 09/01/26 End date: Thursday, 22/01/26 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks Coordination) Contractor:
Bus Routes Affected: Castel 3B; LMDC 6B / LV 6B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; 41 Cycle Access: No

Emergency Activity - CASTEL - ROUTE DE COBO
Description: Work starting 05:45 AM on Fri 09 Jan 26 and finishing 06:00 PM on Fri 13 Feb 26 - Back entrance of park - tree down - road blocked
Start date: Friday, 09/01/26 End date: Friday, 13/02/26 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks Coordination) Contractor:
Bus Routes Affected: Castel 3B; LMDC 6B / LV 6B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; 41 Cycle Access: No

ST. ANDREW - LA VASSALERIE ( ROUTE DE ST. ANDRE to MOURANTS ROAD )
Description: Driveway works to Sleepy Hollow Bungalow
Start date: Monday, 19/01/26 End date: Thursday, 22/01/26 Timing: All Day
Promoter: Tarmac Services Contractor: Tarmac Services
Bus Routes Affected: Forest 2B; St Martin 1A Cycle Access: Yes

ST. ANDREW - ROHAIS DE BAS
Description: reinstating failed tarmac
Start date: Monday, 19/01/26 End date: Wednesday, 21/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Ronez (Patching)
Bus Routes Affected: Castel 1A; Castel 1B; LB 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; LMDC 7B; LV 3B; LV 4A; LV 4B; P2;41;42;N2 Cycle Access: Dismount past works

ST. ANDREW - ROHAIS DE BAS
Description: resurfacing due to failed works
Start date: Saturday, 17/01/26 End date: Wednesday, 21/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Ronez (Patching)
Bus Routes Affected: Castel 1A; Castel 1B; LB 1B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LMDC 7A; LMDC 7B; LV 3B; LV 4A; LV 4B; P2;41;42;N2 Cycle Access: Dismount past works

ST. PETER PORT - BERTHELOT STREET
Description: Work starting 07:30 AM on Mon 17 Mar 25 and finishing 04:00 PM on Thu 30 Apr 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
Start date: Monday, 17/03/25 End date: Thursday, 30/04/26 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - BRUCE LANE
Description: Work starting 07:00 AM and finishing 05:00 PM daily between Tue 28 Oct 25 and Sat 31 Jan 26 - Scaffolding; Property: Stratton House; Purpose: Roofing Works
Start date: Tuesday, 28/10/25 End date: Saturday, 31/01/26 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - BRUCE LANE
Description: Scaffolding; Property: No 4 Bruce Lane; Purpose: External Decoration
Start date: Monday, 13/10/25 End date: Friday, 13/02/26 Timing: Between AM and PM Peaks
Promoter: Island Scaffolding Contractor: Island Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - COLBORNE ROAD ( RUETTES BRAYES to HAVILLAND ROAD )
Description: Tree surgery
Start date: Monday, 19/01/26 End date: Wednesday, 21/01/26 Timing: Between AM and PM Peaks
Promoter: Treevolution Contractor: Treevolution
Bus Routes Affected: LB 3A; LB 3B; LMDC 7A; LMDC 7B; LV 4A; 91;92;93;94;95;N3 Cycle Access: No

ST. PETER PORT - CROUTES HAVILLAND ( FORT ROAD to DAMOUETTES LANE )
Description: Skips outside No 2
Start date: Thursday, 01/01/26 End date: Sunday, 15/02/26 Timing: Between AM and PM Peaks
Promoter: C M Building Contractor: C M Building
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LE POLLET
Description: Work starting 07:30 AM on Mon 19 Jan 26 and finishing 04:00 PM on Wed 28 Jan 26 - Road resurfacing
Start date: Monday, 19/01/26 End date: Wednesday, 28/01/26 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: St Martin PS 3A;St Martin PS 3B;LBHS 2A""LMDC HS 7B;LV HS 6B Cycle Access: No

ST. PETER PORT - LES PETITES FONTAINES ( MOUNT HERMON to VALNORD ROAD )
Description: wall repairs
Start date: Sunday, 21/12/25 End date: Friday, 27/02/26 Timing: All Day
Promoter: TNT Stonemasons Contractor: TNT Stonemasons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - MILL STREET
Description: Work starting 08:00 AM on Fri 02 Jan 26 and finishing 05:00 PM on Fri 27 Feb 26 - Relay 3` iron/asbestos main
Start date: Friday, 02/01/26 End date: Friday, 27/02/26 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Vauvert PS 1A Cycle Access: No

ST. PETER PORT - RUE DE BELVEDERE
Description: Work starting 08:00 AM and finishing 04:00 PM daily between Mon 19 Jan 26 and Fri 23 Jan 26 - Tree surgery
Start date: Monday, 19/01/26 End date: Friday, 23/01/26 Timing: Between AM and PM Peaks
Promoter: Arbology Contractor: Arbology
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - ST. STEPHEN`S LANE ( YORK AVENUE to LES CROUTES )
Description: Work starting 07:00 AM and finishing 05:00 PM daily between Mon 05 Jan 26 and Fri 23 Jan 26 - Removing road side wall and rebuilding gateway
Start date: Monday, 05/01/26 End date: Friday, 23/01/26 Timing: Between AM and PM Peaks
Promoter: Paul Bonnel Stonemasons Contractor: Paul Bonnel Stonemasons
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - VALNORD LANE ( VALNORD ESTATE to GREEN LANES )
Description: Work starting 08:00 AM and finishing 05:00 PM daily between Mon 23 Jun 25 and Sat 28 Feb 26 - Delivery of building materials.
Start date: Monday, 23/06/25 End date: Saturday, 28/02/26 Timing: Between AM and PM Peaks
Promoter: Hillstone Guernsey Ltd Contractor: Hillstone Guernsey Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PIERRE DU BOIS - ROUTE DE LIHOU ( RUE DU LONGFRIE to RUE DES GRANDES RUES )
Description: Tree surgery
Start date: Monday, 19/01/26 End date: Thursday, 22/01/26 Timing: Between AM and PM Peaks
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Houguette 1A Cycle Access: No

ST. PIERRE DU BOIS - RUE DES CACHES ( RUE DES BREHAUTS to RUE DES RONDIAUX )
Description: Lane blocked by two trees from Storm Goretti. Trees being removed during week ending Friday 23 JAN
Start date: Thursday, 08/01/26 End date: Friday, 23/01/26 Timing: All Day
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: LB HS 9B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 4A;LMDC HS 4B;LV HS 6B;LMDC HS LB HS 1A;LMDC HS LB HS 1B Cycle Access: No

ST. SAMPSON - LES SAUVAGEES ( OATLANDS LANE to DUVEAUX LANE )
Description: service alteration
Start date: Monday, 19/01/26 End date: Tuesday, 20/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - ROUTE DES BAS COURTILS
Description: Work starting 07:30 AM on Mon 19 Jan 26 and finishing 04:00 PM on Fri 06 Feb 26 - Road resurfacing
Start date: Monday, 19/01/26 End date: Friday, 06/02/26 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Houguette 2A; Houguette 2B; LMDC 3A / LB 8A; LMDC 3B / LB 8B; LV 5A / LB 6A; LV 5B / LB 6B; 71;N4 Cycle Access: Dismount past works

ST. SAVIOUR - RUE DE L`EGLISE ( ROUTE DE SOUS L'EGLISE to RUE DES COMTES )
Description: GW Assistance ( Abreuveurs Repair )
Start date: Monday, 19/01/26 End date: Friday, 23/01/26 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: LBHS 5A;LBHS 5B;LMDC HS 3A;LMDC HS 3B;LV HS 5A;LV HS 5B;LMDC HS LB HS 3A;LMDC HS LB HS 3B;LV HS LB HS 5A;LV HS LB HS 5B Cycle Access: No

ST. SAVIOUR - RUE PERELLE
Description: Asphalt rectification
Start date: Monday, 19/01/26 End date: Tuesday, 20/01/26 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Houguette 1B; Houguette 3B; LB 5A; LB 5B; LMDC 4A; LMDC 4B; LV 3B; LV 8A; LMDC 3A / LB 8A; LMDC 3B / LB 8B; 60;61 Cycle Access: Dismount past works

ST. SAVIOUR - RUE PERELLE
Description: Work starting 08:30 AM on Mon 19 Jan 26 and finishing 05:00 PM on Wed 21 Jan 26 - Install new water service
Start date: Monday, 19/01/26 End date: Wednesday, 21/01/26 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Houguette 1B; Houguette 3B; LB 5A; LB 5B; LMDC 4A; LMDC 4B; LV 3B; LV 8A; LMDC 3A / LB 8A; LMDC 3B / LB 8B; 60;61 Cycle Access: Dismount past works

VALE - L'ABBAYE
Description: Work starting 07:00 AM on Mon 19 Jan 26 and finishing 12:00 PM on Tue 20 Jan 26 - Removal of granite wall; Property: Vale Church; Purpose: Other (see Details)
Start date: Monday, 19/01/26 End date: Tuesday, 20/01/26 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: LV 1B; 13;91;92;N1 Cycle Access: No

VALE - LONGREE ( NORTH SIDE to )
Description: New service installation
Start date: Monday, 19/01/26 End date: Wednesday, 21/01/26 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Vale PS 2A;Vale PS 2B;LV HS 1A;LV HS 1B;LV HS 2B;SS HS 2B Cycle Access: Dismount past works

One Ways
No current major delays due to one ways
Signals
ST. PETER PORT - SOUTH ESPLANADE
Description: Work starting 09:00 AM on Mon 12 Jan 26 and finishing 05:00 PM on Mon 26 Jan 26 - Essential maintenance upgrade to gas services.
Start date: Monday, 12/01/26 End date: Monday, 26/01/26 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: St Martin 3A; St Martin 3B; LB 2A; LMDC 7B Cycle Access: Dismount past works


Starting - next 7 days
Closures
ST. ANDREW - LES MAUXMARQUIS (ROUTE DE ST. ANDRE)
Description: Supply line upgrade
Start date: Wednesday, 21/01/26 End date: Friday, 23/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: St Martin 1A; St Martin 1B; LV 5A / LB 6A; LV 5B / LB 6B; 71;N4 Cycle Access: Dismount past works

ST. ANDREW - ROUTE DE LA CROIX AU BAILIFF
Description: Trial Hole Excavations
Start date: Monday, 26/01/26 End date: Friday, 30/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: St Martin 1A; St Martin 1B; LB 1A; LB 1B; LB 2A; LB 2B; LB 3A; LB 3B; LV 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;51;52;60;61 Cycle Access: Dismount past works

ST. MARTIN - RUE DE L`EGLISE ( LA BELLIEUSE to LES MERRIENNES )
Description: Work starting 07:00 AM and finishing 06:00 PM daily between Mon 26 Jan 26 and Fri 30 Jan 26 - Tree surgery
Start date: Monday, 26/01/26 End date: Friday, 30/01/26 Timing: Between AM and PM Peaks
Promoter: Treemendous Contractor: Treemendous
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - GUELLES LANE ( MONT ARRIVE to GUELLES ROAD )
Description: CCTV Investigation
Start date: Sunday, 25/01/26 End date: Sunday, 25/01/26 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: LV HS 7B Cycle Access: Yes

ST. PETER PORT - LE VAL DES TERRES
Description: Work starting 09:30 AM and finishing 04:30 PM daily between Mon 26 Jan 26 and Fri 30 Jan 26 - Repair to rockfall netting
Start date: Monday, 26/01/26 End date: Friday, 30/01/26 Timing: Between AM and PM Peaks
Promoter: States Property Unit Contractor: Traffic and Highway Services (Parking Suspensions and Events)
Bus Routes Affected: St Martin 3A; St Martin 3B; LB 2A; LMDC 7B Cycle Access: No

ST. PETER PORT - LE VAL DES TERRES
Description: Work starting 07:30 AM on Mon 26 Jan 26 and finishing 05:00 PM on Fri 30 Jan 26 - Streetlight Replacement
Start date: Monday, 26/01/26 End date: Friday, 30/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: St Martin 3A; St Martin 3B; LB 2A; LMDC 7B Cycle Access: Dismount past works

ST. PETER PORT - LES COTILS
Description: Work starting 07:30 AM on Mon 26 Jan 26 and finishing 05:00 PM on Mon 02 Feb 26 - supply line alteration
Start date: Monday, 26/01/26 End date: Monday, 02/02/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - MONT ARRIVE
Description: Sewer Repair ( O/S Old Spa Del La Mare Site )
Start date: Saturday, 24/01/26 End date: Saturday, 24/01/26 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Amherst 1A; 32 Cycle Access: Yes

ST. PETER PORT - PARIS STREET ( NEW PARIS ROAD to ST. GEORGE'S ESPLANADE )
Description: House move
Start date: Tuesday, 20/01/26 End date: Tuesday, 20/01/26 Timing: Between AM and PM Peaks
Promoter: Safemoves Removals Contractor: Safemoves Removals
Bus Routes Affected: St Martin PS 3A;St Martin PS 3B;LBHS 2A""LMDC HS 7B;LV HS 6B Cycle Access: No

ST. SAMPSON - MONT MORIN ( RUE DES MONTS to RODLEY PARK )
Description: Supply line alteration
Start date: Monday, 26/01/26 End date: Wednesday, 28/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

TORTEVAL - RUE DU SAUCHET ( RUE DU BELLE to RUE DES ROCQUES )
Description: Supply line upgrade
Start date: Tuesday, 20/01/26 End date: Thursday, 22/01/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LANDES DU MARCHE
Description: Repair manhole cover
Start date: Monday, 26/01/26 End date: Thursday, 29/01/26 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: LMDC 7A; LMDC 7B; LV 1A; LV 1B; LV 2B; LV 8A; SS 1B; SS 4A; SS 4B; P2 Cycle Access: Dismount past works

VALE - LANDES DU MARCHE
Description: Repair various failed tarmac areas
Start date: Monday, 26/01/26 End date: Thursday, 29/01/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: LMDC 7A; LMDC 7B; LV 1A; LV 1B; LV 2B; LV 8A; SS 1B; SS 4A; SS 4B; P2 Cycle Access: No

One Ways
No future major delays due to one ways
Signals