Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DES BELLES
|
( RUE DE LA PORTE to RUE DES BERGERS )
|
Description:
|
Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Tue 05 Dec 23 - Chamber installations
|
Start date:
|
Tuesday, 28/11/23
|
End date:
|
Tuesday, 05/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DU PRESBYTERE
|
( CHEMIN ROBIN to ROUTE DE L'EGLISE )
|
Description:
|
Work starting 08:00 AM on Tue 21 Nov 23 and finishing 04:00 PM on Fri 22 Dec 23 - Duct Installation
|
Start date:
|
Tuesday, 21/11/23
|
End date:
|
Friday, 22/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
P2, 51, 52
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Mon 01 Jan 24 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Monday, 01/01/24
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
Emergency Activity - VALE - LA ROCHELLE ROAD
|
|
Description:
|
service fault to La Houguette
|
Start date:
|
Sunday, 03/12/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
11, 91, 92, N1
|
Cycle Access:
|
Dismount past works
|
FOREST - RUE DES ROULIAS
|
|
Description:
|
Work starting 07:00 AM on Mon 27 Nov 23 and finishing 05:00 PM on Fri 15 Dec 23 - High and low voltage cabling upgrade
|
Start date:
|
Monday, 27/11/23
|
End date:
|
Friday, 15/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES RUETTES
|
|
Description:
|
Work starting 07:00 AM on Fri 03 Nov 23 and finishing 06:00 AM on Tue 05 Dec 23 - PEH Project
|
Start date:
|
Friday, 03/11/23
|
End date:
|
Tuesday, 05/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ALLEZ STREET
|
( GEORGE STREET to VAUVERT )
|
Description:
|
Footway repaving
|
Start date:
|
Monday, 06/11/23
|
End date:
|
Wednesday, 20/12/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BROCK ROAD
|
( GRANGE ROAD to ROSAIRE AVENUE )
|
Description:
|
Closure to allow for main replacement, x2 new distribution pillars and new sub connections
|
Start date:
|
Tuesday, 17/10/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31
|
Cycle Access:
|
Yes
|
ST. PETER PORT - CLIFF STREET
|
|
Description:
|
Work starting 07:30 AM and finishing 11:59 PM daily between Tue 19 Sep 23 and Mon 04 Dec 23 - Removal of soil and deliveries
|
Start date:
|
Tuesday, 19/09/23
|
End date:
|
Monday, 04/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Breaton Construction
|
Contractor:
|
Breaton Construction
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Scaffolding ; Property: No 13, Le Pollet (Paper Chase); Purpose: Access
|
Start date:
|
Sunday, 19/11/23
|
End date:
|
Tuesday, 02/01/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
|
Start date:
|
Monday, 02/10/23
|
End date:
|
Monday, 01/04/24
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LEFEBVRE STREET
|
|
Description:
|
Scaffolding ; Property: Lefebvre Court; Purpose: Access
|
Start date:
|
Sunday, 12/11/23
|
End date:
|
Wednesday, 14/02/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - NORTH PLANTATION
|
|
Description:
|
Scaffolding ; Property: No 13, North Plantation (Choices); Purpose: Access
|
Start date:
|
Monday, 20/11/23
|
End date:
|
Tuesday, 02/01/24
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - ST. JAMES STREET
|
|
Description:
|
replacing cladding
|
Start date:
|
Saturday, 02/12/23
|
End date:
|
Sunday, 03/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
J W Rihoy Builders
|
Contractor:
|
J W Rihoy Builders
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE QUANTERAINE
|
( RUE DU BORDAGE to ROUTE DES SAGES )
|
Description:
|
Work starting 07:00 AM on Mon 20 Nov 23 and finishing 05:00 PM on Mon 04 Dec 23 - Install new water main
|
Start date:
|
Monday, 20/11/23
|
End date:
|
Monday, 04/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. SAMPSON - RUE DE BAS
|
( ROUTE ST. CLAIR to DUVEAUX ROAD )
|
Description:
|
Roadside wall collapsed.
|
Start date:
|
Wednesday, 25/10/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
Traffic and Highway Services (Roadworks and Events)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - LE FRIE AU FOUR
|
( RUE DE LA NEUVE MAISON to RUE FEVERESSE )
|
Description:
|
Rebuilding a gable
|
Start date:
|
Monday, 30/10/23
|
End date:
|
Sunday, 31/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - RUE DES HOUGUES
|
|
Description:
|
Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Tue 05 Dec 23 - Chamber and duct installation
|
Start date:
|
Tuesday, 28/11/23
|
End date:
|
Tuesday, 05/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA BAILLOTERIE LANE
|
|
Description:
|
scaffolding services; Property: unknown; Purpose: Roofing Works
|
Start date:
|
Monday, 13/11/23
|
End date:
|
Monday, 11/12/23
|
Timing:
All Day
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - ROUTE DE ST MAGLOIRE
|
( RUE DE DESSOUS to LA LANDE )
|
Description:
|
service alteration
|
Start date:
|
Monday, 27/11/23
|
End date:
|
Monday, 04/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DE DESSOUS
|
|
Description:
|
Network upgrade (duct installations)
|
Start date:
|
Monday, 06/11/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DE L`EPINE
|
( DEHUS LANE to RUE DU CHARDRONNET )
|
Description:
|
Work starting 06:00 PM on Fri 31 Mar 23 and finishing 05:00 PM on Fri 15 Dec 23 - Safety reasons pending structural investigations
|
Start date:
|
Friday, 31/03/23
|
End date:
|
Friday, 15/12/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
Traffic and Highway Services (Roadworks and Events)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - RUE DE L'EPINE
|
( DEHUS LANE to RUE DU CHARDRONNET )
|
Description:
|
Work starting 07:00 AM on Thu 01 Jun 23 and finishing 11:59 PM on Sat 30 Dec 23 - Investigations
|
Start date:
|
Thursday, 01/06/23
|
End date:
|
Saturday, 30/12/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Roadworks and Events)
|
Contractor:
|
Traffic and Highway Services (Roadworks and Events)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - SOUS LES HOUGUES
|
|
Description:
|
Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Fri 08 Dec 23 - Duct installation
|
Start date:
|
Tuesday, 28/11/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - BOSQ LANE
|
|
Description:
|
Work starting 06:00 AM on Thu 28 Jul 22 and finishing 05:00 PM on Wed 31 Jan 24 - Scaffolding for internal building reconstruction; Property: Royal Terrace; Purpose: Other (see Details)
|
Start date:
|
Thursday, 28/07/22
|
End date:
|
Wednesday, 31/01/24
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
No current major delays due to signals
CASTEL - ROUTE DE COBO
|
( LE DOUIT BOUDIN to RUE DE BOUVERIE )
|
Description:
|
service alteration
|
Start date:
|
Tuesday, 05/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
41
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DU GELE
|
( RUETTE DU ROCHER to VAZON ROAD )
|
Description:
|
Work starting 08:00 AM on Wed 06 Dec 23 and finishing 05:00 PM on Fri 08 Dec 23 - New chamber and duct for new connection
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
60, 61, N2
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUE DU GELE; RUETTE DU ROCHER to VAZON ROAD
|
( RUETTE DU ROCHER to VAZON ROAD )
|
Description:
|
CCTV Investigation
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
60, 61, N2
|
Cycle Access:
|
Yes
|
FOREST - LA RUE DES FOSSES
|
( RUE DU MANOIR to RUE DES REINES )
|
Description:
|
Daily `self sign` closures for cable splicing 8am - 4pm
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LA VASSALERIE
|
( ROUTE DE ST. ANDRE to MOURANTS ROAD )
|
Description:
|
Emergency Tree Surgery Works
|
Start date:
|
Thursday, 07/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arborcraft Ltd
|
Contractor:
|
Arborcraft Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. ANDREW - LES MAUXMARQUIS (ROUTE DE ST. ANDRE)
|
|
Description:
|
Work starting 07:00 AM on Wed 06 Dec 23 and finishing 06:00 AM on Mon 11 Dec 23 - Laying 33kv cable for PEH upgrade
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Monday, 11/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
P2, 60, 61, 71
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LA BOUVEE
|
|
Description:
|
Chamber and duct installations
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Friday, 15/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - St Martins Christmas Market
|
( LONGUE RUE to LA GRANDE RUE )
|
Description:
|
St Martins Christmas Market
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Monday, 04/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Constables of St Martin
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
81, 91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - CROUTES HAVILLAND
|
( FORT ROAD to DAMOUETTES LANE )
|
Description:
|
Work starting 07:00 AM on Mon 04 Dec 23 and finishing 04:00 PM on Fri 15 Dec 23 - Road resurfacing
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Friday, 15/12/23
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
States Works (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
Restricted: walk through the site
|
ST. PETER PORT - FORT ROAD
|
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
After PM Peak
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
91, 92, 93, 94, 95, N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
( ROUGE RUE to ELIZABETH AVENUE )
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE BOUET; ROUGE RUE to ELIZABETH AVENUE
|
( ROUGE RUE to ELIZABETH AVENUE )
|
Description:
|
replace streetlight
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
31, 32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES AMBALLES
|
( PIETTE ROAD to LES COTILS )
|
Description:
|
service alteration
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES ECHELONS
|
( SOUTH ESPLANADE to SOUTH ESPLANADE )
|
Description:
|
Gutter Cleaning
|
Start date:
|
Sunday, 10/12/23
|
End date:
|
Sunday, 10/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
q3 services
|
Contractor:
|
q3 services
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES OZOUETS ROAD
|
( LES BAISSIERES to SKINS LANE )
|
Description:
|
Work starting 08:00 AM and finishing 04:00 PM - Tree surgery works
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Monday, 04/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
Bus Routes Affected:
|
51, 52
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - NORTH ESPLANADE
|
|
Description:
|
Crane lift for scaffold build
|
Start date:
|
Sunday, 10/12/23
|
End date:
|
Sunday, 10/12/23
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
11, 12, 13, 21, 31, 32, 41, 42, 51, 52, 60, 61, 71, 81, 92, N1, N2
|
Cycle Access:
|
Yes
|
ST. PETER PORT - PARIS STREET
|
( NEW PARIS ROAD to ST. GEORGE'S ESPLANADE )
|
Description:
|
Dismantling Scaffolding
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - St Peter Port Constables - Carol Service
|
( RUE DU MANOIR to HIGH STREET )
|
Description:
|
St Peter Port Constables - Carol Service
|
Start date:
|
Thursday, 07/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
After PM Peak
|
Promoter:
|
Constables of St Peter Port
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPLAND ROAD
|
|
Description:
|
Work starting 09:00 AM on Mon 04 Dec 23 and finishing 05:00 PM on Tue 05 Dec 23 - Cable pull from the bottom of Candie road to upland business Centre.
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Tuesday, 05/12/23
|
Timing:
All Day
|
Promoter:
|
JT Guernsey
|
Contractor:
|
JT Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE LA POMARE
|
( RUE DES SALINES to RUE DE LA CACHE )
|
Description:
|
Replace chamber cover and clear blocked duct
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Friday, 08/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - RUE DE QUANTERAINE
|
( RUE DU BORDAGE to ROUTE DES SAGES )
|
Description:
|
Low voltage cabling upgrade
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Wednesday, 13/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - HALF WAY JUNCTION
|
|
Description:
|
Stream Cleaning
|
Start date:
|
Sunday, 10/12/23
|
End date:
|
Sunday, 10/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
21, 91
|
Cycle Access:
|
No
|
ST. SAVIOUR - Autism Guernsey - Winter Wonderland
|
|
Description:
|
Autism Guernsey - Winter Wonderland
|
Start date:
|
Wednesday, 06/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
All Day
|
Promoter:
|
Autism Guernsey
|
Contractor:
|
N/A
|
Bus Routes Affected:
|
71
|
Cycle Access:
|
Yes, in direction of one-way
|
ST. SAVIOUR - LE FRIE BATON ROAD
|
( RUE DE LA CROIX CREVE COEUR to RUE DU PRE BOURDON )
|
Description:
|
service alteration
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
TORTEVAL - LA RUE DE LA VALLEE
|
( RUE DE LA VILTOLE to RUE DU HUREL )
|
Description:
|
Household Removal
|
Start date:
|
Tuesday, 05/12/23
|
End date:
|
Wednesday, 06/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
R and R Removals
|
Contractor:
|
R and R Removals
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
TORTEVAL - RUE DE LA VARDE
|
( PEZERIES to RUE DU PORTELET )
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 04 Dec 23 and Thu 07 Dec 23 - Tree surgery works
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
VALE - LA ROUTE DU PICQUEREL
|
|
Description:
|
Install new utility services
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Monday, 18/12/23
|
Timing:
All Day
|
Promoter:
|
Geomarine
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31, 32, 91, 92
|
Cycle Access:
|
Dismount past works
|
No future major delays due to one ways
ST. MARTIN - ROUTE DE LA FORET; LA ROUTE DES CORNUS to LA RUETTE
|
( LA ROUTE DES CORNUS to LA RUETTE )
|
Description:
|
CBT installations and cable splicing
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Thursday, 07/12/23
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. SAMPSON - BULWER AVENUE; LONGUE HOUGUE LANE to RUE DOREY
|
( LONGUE HOUGUE LANE to RUE DOREY )
|
Description:
|
Work starting 09:00 AM on Mon 04 Dec 23 and finishing 05:00 PM on Tue 05 Dec 23 - Replace noisy frame and cover
|
Start date:
|
Monday, 04/12/23
|
End date:
|
Tuesday, 05/12/23
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|