Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - ROUTE DE COBO
Description: High and low voltage cabling upgrade, replacement of roadside distribution pillar and service upgrades
Start date: Monday, 23/03/26 End date: Friday, 17/07/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Castel 3B; LMDC 6B / LV 6B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; 41 Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Mon 31 Aug 26 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Monday, 31/08/26 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

FOREST - LA RUE DES CROISEE
Description: Work starting 07:30 AM on Mon 11 May 26 and finishing 04:00 PM on Fri 29 May 26 - Road resurfacing
Start date: Monday, 11/05/26 End date: Friday, 29/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - VAL AU BOURG
Description: Install new substation and associated high and low voltage cabling, lay down area for ongoing works in Rue Tonnelle
Start date: Tuesday, 07/04/26 End date: Friday, 19/06/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: LBHS 1A;LBHS 2A Cycle Access: Dismount past works

ST. PETER PORT - BERTHELOT STREET
Description: Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Thu 31 Dec 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
Start date: Monday, 17/03/25 End date: Thursday, 31/12/26 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - HAVILLAND STREET
Description: Work starting 06:00 AM and finishing 10:00 AM daily between Sat 04 Apr 26 and Sat 30 May 26 - SCAFFOLDING WORKS; Property: HAVILLAND COTTAGE; Purpose: Roofing Works
Start date: Saturday, 04/04/26 End date: Saturday, 30/05/26 Timing: Between AM and PM Peaks
Promoter: Action Scaffolding Contractor: Action Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES COTILS
Description: Erecting scaffolding.; Property: Mont Bleu ; Purpose: Roofing Works
Start date: Friday, 10/04/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Advanced Scaffolding (Guernsey) Contractor: Advanced Scaffolding (Guernsey)
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES PETITES FONTAINES ( MOUNT HERMON to VALNORD ROAD )
Description: wall repairs
Start date: Saturday, 02/05/26 End date: Friday, 31/07/26 Timing: All Day
Promoter: TNT Stonemasons Contractor: TNT Stonemasons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - PIETTE ROAD
Description: ERECTING SCAFFOLDING; Property: BURNLEY; Purpose: Roofing Works
Start date: Wednesday, 22/04/26 End date: Sunday, 12/07/26 Timing: Between AM and PM Peaks
Promoter: Advanced Scaffolding (Guernsey) Contractor: Advanced Scaffolding (Guernsey)
Bus Routes Affected: Vauvert PS 1B Cycle Access: Yes

ST. PETER PORT - VALNORD LANE ( VALNORD ESTATE to GREEN LANES )
Description: Work starting 08:00 AM and finishing 11:59 PM daily between Mon 23 Jun 25 and Tue 30 Jun 26 - Delivery of building materials.
Start date: Monday, 23/06/25 End date: Tuesday, 30/06/26 Timing: Between AM and PM Peaks
Promoter: Hillstone Guernsey Ltd Contractor: Hillstone Guernsey Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PETER PORT - WATER LANES
Description: Low voltage distribution pillar installation and low voltage network upgrades
Start date: Tuesday, 05/05/26 End date: Friday, 05/06/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Capelles PS 1A;SS HS 1B Cycle Access: No

ST. SAMPSON - ROUTE MILITAIRE
Description: Repair manhole covers
Start date: Monday, 11/05/26 End date: Monday, 18/05/26 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21 Cycle Access: Dismount past works

ST. SAMPSON - ROUTE MILITAIRE
Description: Work starting 09:30 AM on Mon 11 May 26 and finishing 05:30 PM on Fri 22 May 26 - Various repairs
Start date: Monday, 11/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Vale 1A; Vale 3B; SS 4A; SS 5A; SS 6A; SS 8A; 13;21 Cycle Access: Yes

ST. SAVIOUR - LA RUE DU HAMEL
Description: Work starting 08:00 AM on Mon 16 Mar 26 and finishing 05:00 PM on Fri 22 May 26 - Low voltage cabling and service upgrade
Start date: Monday, 16/03/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Houguette PS 1B;Houguette PS 3B;LBHS 5A;LBHS 5B;LMDC HS 1A 2A;LMDC HS 1B 2B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A Cycle Access: Dismount past works

ST. SAVIOUR - RUE DES CRABBES; RUE DE ST. APPOLINE to RUE PERELLE ( RUE DE ST. APPOLINE to RUE PERELLE )
Description: Work starting 08:30 AM on Fri 15 May 26 and finishing 05:00 PM on Tue 19 May 26 - Repair water leak
Start date: Friday, 15/05/26 End date: Tuesday, 19/05/26 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Houguette PS 1B;Houguette PS 3B;LBHS 5A;LBHS 5B;LMDC HS 3A;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A;LMDC HS LB HS 3A;LMDC HS LB HS 3B Cycle Access: Dismount past works

ST. SAVIOUR - RUE DES HURIAUX ( LA RUE DU HAMEL to RUE DU MONT SAINT )
Description: Work starting 08:00 AM on Wed 15 Apr 26 and finishing 05:00 PM on Fri 22 May 26 - Low voltage cabling and service upgrades
Start date: Wednesday, 15/04/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

VALE - SUMMERFIELD ROAD
Description: Work starting 07:30 AM on Tue 05 May 26 and finishing 04:00 PM on Sun 17 May 26 - Road resurfacing
Start date: Tuesday, 05/05/26 End date: Sunday, 17/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Vale 1A; Vale 3B; LV 1A; LV 1B; SS 6A; SS 6B; 11;13;91;92 Cycle Access: Dismount past works

One Ways
CASTEL - ROUTE DU TERTRE; RUE DE LA MASSE to LES QUERITES ( RUE DE LA MASSE to LES QUERITES )
Description: Repair and rebuild road side wall
Start date: Monday, 09/03/26 End date: Friday, 12/06/26 Timing: All Day
Promoter: Fixt Ltd Contractor: Fixt Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. MARTIN - RUE DE LA VALLEE
Description: SCAFFOLDING ERECTION; Property: BELLA LUCE; Purpose: Installation
Start date: Monday, 13/04/26 End date: Friday, 29/05/26 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: LV 4A; LV 4B; 81 Cycle Access: Yes

Signals
CASTEL - KING'S MILLS ROAD; RUE DES BERGERS to LA SAUVARINERIE ( RUE DES BERGERS to LA SAUVARINERIE )
Description: Work starting 08:00 AM on Mon 23 Mar 26 and finishing 04:00 PM on Fri 12 Jun 26 - Rebuilding a Roadside Wall.
Start date: Monday, 23/03/26 End date: Friday, 12/06/26 Timing: All Day
Promoter: NSP Foundations Contractor: NSP Foundations
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - Our Race For Life
Description: Charity race between 10:30am and 1:00pm
Start date: Sunday, 17/05/26 End date: Sunday, 17/05/26 Timing: All Day
Promoter: race for life Contractor: N/A
Bus Routes Affected: LMDC 7A; 41 Cycle Access: No

CASTEL - RUE A L`EAU ( MOULIN DE HAUT to LA SAUVARINERIE )
Description: Work starting 07:30 AM on Sat 16 May 26 and finishing 05:00 PM on Fri 22 May 26 - Repair defective bitmac
Start date: Saturday, 16/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: LB 4A; LB 4B; LB 4A Overflow Cycle Access: Yes

CASTEL - RUETTE DES MAROTTES ( RUETTE DE FRIES to RUETTE DU FROCQ )
Description: Repairs to defective Asphalt
Start date: Monday, 18/05/26 End date: Tuesday, 19/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Tarmac Services
Bus Routes Affected: Cycle Access: Yes

SEAFRONT SUNDAY - GSPCA Sunday 2026
Description: Town seafront closed between 7am to 6pm
Start date: Sunday, 17/05/26 End date: Sunday, 17/05/26 Timing: All Day
Promoter: GSPCA Contractor: N/A
Bus Routes Affected: St Martin PS 3A;St Martin PS 3B;LBHS 2A;LMDC HS 5A;LMDC HS 6B;LV HS 4A;SS HS 1A;SS HS 2A Cycle Access: Dismount past works:

ST. ANDREW - ROUTE DE LA CROIX AU BAILIFF
Description: Install new water service
Start date: Monday, 18/05/26 End date: Wednesday, 20/05/26 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: St Martin 1A; St Martin 1B; LB 1A; LB 1B; LB 2A; LB 2B; LB 3A; LB 3B; LV 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;51;52;60;61 Cycle Access: Dismount past works

ST. ANDREW - ROUTE DE LA CROIX AU BAILIFF ( RUE DES POINTES to LES RUETTES )
Description: New supply line
Start date: Wednesday, 20/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: St Martin 1A; St Martin 1B; LB 1A; LB 1B; LB 2A; LB 2B; LB 3A; LB 3B; LV 4B; LV 5A / LB 6A; LV 5B / LB 6B; P2;51;52;60;61 Cycle Access: Dismount past works

ST. MARTIN - ICART ROAD
Description: Work starting 07:30 AM on Mon 18 May 26 and finishing 04:00 PM on Fri 05 Jun 26 - Road resurfacing
Start date: Monday, 18/05/26 End date: Friday, 05/06/26 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - HAVELET ( THE STRAND to HAUTEVILLE )
Description: Skip outside property to carry out renovation
Start date: Friday, 22/05/26 End date: Sunday, 07/06/26 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: St Martin PS 3A;St Martin PS 3B;LBHS 2A;LBHS 3B;LV HS 4A;LV HS 6B Cycle Access: Yes

ST. PETER PORT - LE TRUCHOT
Description: cherry picker for roof repairs
Start date: Thursday, 21/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Savills Contractor: Savills
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES AMBALLES ( ST. JOHN'S ROAD to LE BOUET )
Description: Main Drainage Investigation CCTV
Start date: Friday, 22/05/26 End date: Friday, 22/05/26 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Vale PS 2A;LV HS 1A;SS HS 6A Cycle Access: Dismount past works

ST. PETER PORT - LES COTILS ( LES AMBALLES to BEAUREGARD LANE )
Description: Work starting 09:00 AM on Tue 19 May 26 and finishing 05:00 PM on Wed 20 May 26 - home furniture deliveries
Start date: Tuesday, 19/05/26 End date: Wednesday, 20/05/26 Timing: All Day
Promoter: White and Company Contractor: White and Company
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LES VAUXLAURENS
Description: Gutter cleaning
Start date: Sunday, 17/05/26 End date: Sunday, 17/05/26 Timing: All Day
Promoter: Premium Cleaning Services Contractor: Premium Cleaning Services
Bus Routes Affected: 31;32;41;42;60;61;71;81;N2;N4 Cycle Access: Yes

ST. PETER PORT - VICTORIA ROAD
Description: Work starting 08:30 AM on Wed 20 May 26 and finishing 05:00 PM on Fri 22 May 26 - Install new water service
Start date: Wednesday, 20/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE LA CACHE ( RUE DE LA POMARE to RUE DU DOUIT DU MOULIN )
Description: Work starting 08:30 AM on Wed 20 May 26 and finishing 05:00 PM on Tue 26 May 26 - Drainage works
Start date: Wednesday, 20/05/26 End date: Tuesday, 26/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Houguette PS 1A;Houguette PS 1B;Houguette PS 2A;Houguette PS 2B;Houguette PS 3A;Houguette PS 4B;LB HS 6A;LB HS 6B;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 5A;LV HS 5B;LV HS LB HS 5A;LV HS LB HS 5B Cycle Access: No

ST. SAVIOUR - SSAV-MISC6 ( RUE FEVERESSE to RUE DES ISSUES )
Description: Tree surgery work
Start date: Monday, 18/05/26 End date: Monday, 18/05/26 Timing: All Day
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Houguette PS 2A;Houguette PS 2B;Houguette PS 4B;LB HS 6A;LB HS 6B;LV HS 6B Cycle Access: No

TORTEVAL - RUE DES BROUARDS
Description: Replace decayed telephone pole
Start date: Wednesday, 20/05/26 End date: Wednesday, 20/05/26 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes

VALE - BUNKER HILL
Description: concrete pump
Start date: Monday, 18/05/26 End date: Monday, 18/05/26 Timing: Between AM and PM Peaks
Promoter: Ray Green Ltd Contractor: Ray Green Ltd
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LA HOUGUE JEHANNET; SUMMERFIELD ROAD to ( SUMMERFIELD ROAD to )
Description: High voltage cabling for emergency substation replacement
Start date: Monday, 18/05/26 End date: Friday, 26/06/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
No future major delays due to one ways
Signals
CASTEL - COBO COAST ROAD ( ROUTE DE COBO to ROUTE DE CARTERET )
Description: Work starting 07:30 AM on Mon 18 May 26 and finishing 05:00 PM on Fri 22 May 26 - Rendering to roadside face of boundary wall and installing glazing
Start date: Monday, 18/05/26 End date: Friday, 22/05/26 Timing: All Day
Promoter: J W Rihoy Builders Contractor: J W Rihoy Builders
Bus Routes Affected: LMDC 4A; LMDC 4B; LMDC 6B / LV 6B; LV 3B; LV 8A; LMDC 3B / LB 8B; 41;42;91;92;N2 Cycle Access: Yes

ST. PETER PORT - FORT ROAD; LE VAL DES TERRES to CROUTES HAVILLAND ( LE VAL DES TERRES to CROUTES HAVILLAND )
Description: Supply line upgrade
Start date: Monday, 18/05/26 End date: Wednesday, 20/05/26 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE PLAISANCE
Description: Work starting 08:30 AM on Mon 18 May 26 and finishing 05:00 PM on Wed 20 May 26 - Repair defective gully
Start date: Monday, 18/05/26 End date: Wednesday, 20/05/26 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

VALE - L'ANCRESSE ROAD
Description: Essential maintenance to gas Mains and Services.
Start date: Monday, 18/05/26 End date: Monday, 08/06/26 Timing: All Day
Promoter: Guernsey Gas Contractor: Guernsey Gas
Bus Routes Affected: Cycle Access: Yes