Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
CASTEL - RUE DU FRIE PLAIDY
|
|
Description:
|
Scaffolding; Property: Le Frie Plaidy; Purpose: Other (see Details)
|
Start date:
|
Saturday, 15/03/25
|
End date:
|
Saturday, 10/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUE DU PRESBYTERE
|
|
Description:
|
Work starting 08:30 AM on Mon 03 Mar 25 and finishing 05:00 PM on Mon 02 Jun 25 - Install new water transfer pipework
|
Start date:
|
Monday, 03/03/25
|
End date:
|
Monday, 02/06/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
Castel 1A; St Martin 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Wed 30 Apr 25 - Investigation and repairs to roadside wall
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Wednesday, 30/04/25
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
CASTEL - RUETTE DU VILLOCQ; RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ
|
( RUETTE DU COURTIL SIMON to ROUTE DE SAUMAREZ )
|
Description:
|
Repair leaking service
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Tuesday, 18/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
LMDC HS 5A;LMDC HS 5B;LMDC HS 6B;LMDC HS 7A;SS HS 4A NEW;SS HS 4B NEW
|
Cycle Access:
|
Dismount past works
|
Emergency Activity - CASTEL - KING'S MILLS ROAD
|
|
Description:
|
Work starting 09:52 AM on Sun 16 Mar 25 and finishing 05:00 PM on Tue 18 Mar 25 - Excavations required to repair an LV cable fault
|
Start date:
|
Sunday, 16/03/25
|
End date:
|
Tuesday, 18/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
Castel 1B; LB 5A; LB 5B; LB 9B; LV 3B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; LMDC 3B / LB 8B; 61;N2
|
Cycle Access:
|
Dismount past works
|
Emergency Activity - CASTEL - RUE DE LA PORTE
|
|
Description:
|
Emergency Work - LV Fault
|
Start date:
|
Friday, 14/03/25
|
End date:
|
Friday, 21/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
Castel 1B; LB 4A; LB 4B; LB 4A Overflow; LB 5A; LB 5B; LB 9B; LV 3B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; LMDC 3B / LB 8B; 61;N2
|
Cycle Access:
|
Dismount past works
|
FOREST - RUE DES AUBERTS
|
( LE BOURG to )
|
Description:
|
Work starting 08:00 AM on Mon 10 Mar 25 and finishing 05:00 PM on Fri 18 Apr 25 - Trenching for high voltage cable upgrade, cable installation and high voltage jointing
|
Start date:
|
Monday, 10/03/25
|
End date:
|
Friday, 18/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
FOREST - RUE DES GLAGEULS
|
( LA RUE DES CROISEE to RUE DES LES HOUARDS )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 10/03/25
|
End date:
|
Tuesday, 18/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES PAGES
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 04:00 PM on Fri 04 Apr 25 - Road resurfacing
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Friday, 04/04/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
States Works (Patching)
|
Bus Routes Affected:
|
|
Cycle Access:
|
No: dismount
|
ST. PETER PORT - BERTHELOT STREET
|
|
Description:
|
Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Monday, 04/05/26
|
Timing:
All Day
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - FOUNTAIN STREET; LE BORDAGE to CHURCH SQUARE
|
|
Description:
|
To repair an electrical fault
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 20/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 3B; LB 9B; LMDC 6A / LV 6A; LMDC 6B / LV 6B; LV 4A; P2;51;52;91;92;93;94;95;N3
|
Cycle Access:
|
Yes
|
ST. PETER PORT - HIGH STREET
|
( LEFEBVRE STREET to BERTHELOT STREET )
|
Description:
|
Stripping scaffolding.
|
Start date:
|
Monday, 10/03/25
|
End date:
|
Saturday, 19/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Formula Scaffolding
|
Contractor:
|
Formula Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LA BUTTE
|
( L'HYVREUSE AVENUE to BROCK ROAD )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Friday, 21/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
31;32
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE POLLET
|
|
Description:
|
Work starting 07:00 AM on Sun 26 Jan 25 and finishing 05:00 PM on Sun 27 Apr 25 - Property: CAFE EMILIA; Purpose: External Decoration
|
Start date:
|
Sunday, 26/01/25
|
End date:
|
Sunday, 27/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES PETITES FONTAINES
|
( MOUNT HERMON to VALNORD ROAD )
|
Description:
|
Work starting 11:30 AM on Fri 22 Nov 24 and finishing 05:00 PM on Mon 31 Mar 25 - wall repairs
|
Start date:
|
Friday, 22/11/24
|
End date:
|
Monday, 31/03/25
|
Timing:
All Day
|
Promoter:
|
TNT Stonemasons
|
Contractor:
|
TNT Stonemasons
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES VAUXLAURENS
|
|
Description:
|
Work starting 07:30 AM and finishing 07:30 AM daily between Fri 29 Nov 24 and Sun 30 Mar 25 - Scaffold to access for emergency works from storm damage; Property: Apartments 4 and 29 St Julians Avenue; Purpose: Roofing Works
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Sunday, 30/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LES VAUXLAURENS
|
|
Description:
|
Work starting 07:30 AM and finishing 07:30 AM daily between Fri 29 Nov 24 and Sun 30 Mar 25 - Scaffolding; Property: No 1 St Julians Avenue; Purpose: Roofing Works
|
Start date:
|
Friday, 29/11/24
|
End date:
|
Sunday, 30/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LOWER CANICHERS
|
( LE TRUCHOT to DOYLE STREET )
|
Description:
|
Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
|
Start date:
|
Monday, 30/09/24
|
End date:
|
Monday, 28/04/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - PRINCE ALBERT ROAD
|
|
Description:
|
Work starting 07:00 AM on Mon 17 Mar 25 and finishing 05:00 PM on Mon 31 Mar 25 - Fibre optic chamber and duct installation
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Monday, 31/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - THE STRAND
|
|
Description:
|
Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 10/07/24
|
End date:
|
Saturday, 12/04/25
|
Timing:
All Day
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - UPPER MANSELL STREET
|
( PARK STREET to TRINITY SQUARE )
|
Description:
|
Chamber and duct installation
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - VALNORD ROAD
|
|
Description:
|
crane lifts 8am to 5pm daily.
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Sunday, 23/03/25
|
Timing:
All Day
|
Promoter:
|
Ravenscroft Construction Ltd
|
Contractor:
|
Ravenscroft Construction Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PIERRE DU BOIS - ROUTE DE LIHOU
|
( RUE DU LONGFRIE to RUE DES GRANDES RUES )
|
Description:
|
Work starting 09:00 AM on Thu 29 Aug 24 and finishing 11:59 PM on Sat 31 May 25 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
|
Start date:
|
Thursday, 29/08/24
|
End date:
|
Saturday, 31/05/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highways
|
Contractor:
|
Traffic and Highways
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DE L`ISSUE
|
|
Description:
|
Installation of new distribution pillar
|
Start date:
|
Monday, 10/03/25
|
End date:
|
Friday, 28/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PIERRE DU BOIS - RUE DES MENAGES
|
( ROUTE DE LA PALLOTERIE to RUE DES CORBINETS )
|
Description:
|
Repairs to roadside wall.
|
Start date:
|
Wednesday, 12/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
All Day
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
Bus Routes Affected:
|
Houguette 1A
|
Cycle Access:
|
Yes
|
ST. SAMPSON - CAMP CODE LANE
|
( LES BAS COURTILS ROAD to DELANCEY LANE )
|
Description:
|
Duct installation
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAMPSON - LES BASSES CAPELLES ROAD
|
( LES PETITES CAPELLES ROAD to RUE SAUVAGE )
|
Description:
|
Remedial works to channel kerbs
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
All Day
|
Promoter:
|
Tarmac Services
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
SS HS 1B
|
Cycle Access:
|
Yes
|
ST. SAVIOUR - VIEILLE RUE
|
( RUE DES CINQ VERGES to RUE DE LA GIROUETTE )
|
Description:
|
Work starting 07:00 AM and finishing 05:00 PM daily between Mon 03 Feb 25 and Thu 01 May 25 - Rebuilding roadside wall.
|
Start date:
|
Monday, 03/02/25
|
End date:
|
Thursday, 01/05/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - LA ROUTE DU BRAYE
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 04:00 PM on Fri 04 Apr 25 - Road Resurfacing
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Friday, 04/04/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
Bus Routes Affected:
|
Vale 2B; Vale 3B; LV 2B; SS 2B; SS 5A; SS 5B; 11;12;13;N1
|
Cycle Access:
|
Dismount past works
|
VALE - RUE DE HAUT
|
( LES ROUVETS ROAD to LES ARGUILLIERS LANE )
|
Description:
|
Rebuilding roadside wall.
|
Start date:
|
Tuesday, 04/03/25
|
End date:
|
Tuesday, 01/04/25
|
Timing:
All Day
|
Promoter:
|
Stoneworks Ltd
|
Contractor:
|
Stoneworks Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE BOUET
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Wed 16 Oct 24 and Fri 04 Apr 25 - Scaffolding.; Property: No 10, Le Bouet; Purpose: Demolition / New Build
|
Start date:
|
Wednesday, 16/10/24
|
End date:
|
Friday, 04/04/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
VALE - VALE AVENUE
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Mon 06 Jan 25 and Tue 25 Mar 25 - Scaffolding.; Property: Northside House.; Purpose: Roofing Works
|
Start date:
|
Monday, 06/01/25
|
End date:
|
Tuesday, 25/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Scaffolding Services
|
Contractor:
|
Scaffolding Services
|
Bus Routes Affected:
|
Vale 2A; Vale 2B; LV 1A; LV 1B; LV 2B; SS 2B; SS 5A; SS 5B; SS 6A; SS 6B; P2;11;12;13;91;92;N1
|
Cycle Access:
|
Yes, in direction of one-way
|
No current major delays due to signals
CASTEL - CANDIE ROAD
|
( RUE A L'EAU to LES VALINGUETS )
|
Description:
|
Node installations and splicing 8am - 4pm dialy
|
Start date:
|
Tuesday, 18/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
Bus Routes Affected:
|
LB 4B; LB 4A Overflow
|
Cycle Access:
|
Dismount past works
|
CASTEL - LA ROCQUETTE
|
( RUE DE LA VIEILLE MARE to VAZON ROAD )
|
Description:
|
CCTV Camera Clean
|
Start date:
|
Wednesday, 19/03/25
|
End date:
|
Wednesday, 19/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
Castel 2A; Castel 3B; LMDC 3B / LB 8B; 42
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - LES CACHES
|
( LA GRANDE RUE to LA RUE MAZE )
|
Description:
|
Work starting 07:00 AM on Sat 22 Mar 25 and finishing 06:00 PM on Mon 24 Mar 25 - Tree surgery works.
|
Start date:
|
Saturday, 22/03/25
|
End date:
|
Monday, 24/03/25
|
Timing:
All Day
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
Bus Routes Affected:
|
LB 1A; LB 2A; LB 2B; LB 3B; LB 9B; LV 4A
|
Cycle Access:
|
Dismount past works
|
ST. MARTIN - RUE DE LA VALLEE
|
( to LES CAMPS DU MOULIN )
|
Description:
|
Work starting 08:00 AM on Mon 24 Mar 25 and finishing 05:00 PM on Wed 26 Mar 25 - Chamber and duct installation
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Wednesday, 26/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - HIGH STREET
|
( BERTHELOT STREET to QUAY STREET )
|
Description:
|
Work starting 08:30 AM on Mon 24 Mar 25 and finishing 05:00 PM on Fri 04 Apr 25 - Install new water service
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Friday, 04/04/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
LBHS 2A;LBHS 3B;LB HS 9B;LMDC HS 5B;LMDC HS 6B;SS HS 4B
|
Cycle Access:
|
Yes
|
ST. PETER PORT - LE FOULON
|
( ROUTE ISABELLE to ROHAIS )
|
Description:
|
Crane Lift.
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Monday, 24/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Mimosa Ltd
|
Contractor:
|
Mimosa Ltd
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LE TRUCHOT
|
( DOYLE STREET to SIR WILLIAM PLACE )
|
Description:
|
Crane lift
|
Start date:
|
Sunday, 23/03/25
|
End date:
|
Sunday, 23/03/25
|
Timing:
Before AM Peak
|
Promoter:
|
J W Rihoy Builders
|
Contractor:
|
J W Rihoy Builders
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES BAISSIERES
|
|
Description:
|
Replace Faulty Chambers
|
Start date:
|
Tuesday, 18/03/25
|
End date:
|
Friday, 21/03/25
|
Timing:
All Day
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Guernsey Water
|
Bus Routes Affected:
|
SS 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - LES COTILS
|
( LES AMBALLES to BEAUREGARD LANE )
|
Description:
|
Household removal.
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Tuesday, 25/03/25
|
Timing:
All Day
|
Promoter:
|
R and R Removals
|
Contractor:
|
R and R Removals
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
ST. PETER PORT - LES ECHELONS
|
( SOUTH ESPLANADE to SOUTH ESPLANADE )
|
Description:
|
Work starting 08:00 AM on Thu 20 Mar 25 and finishing 05:00 PM on Fri 21 Mar 25 - Chamber installation
|
Start date:
|
Thursday, 20/03/25
|
End date:
|
Friday, 21/03/25
|
Timing:
All Day
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - ST. JULIAN'S AVENUE
|
|
Description:
|
crane lift to RBS (bottom section closed)
|
Start date:
|
Sunday, 23/03/25
|
End date:
|
Sunday, 23/03/25
|
Timing:
All Day
|
Promoter:
|
AFM
|
Contractor:
|
AFM
|
Bus Routes Affected:
|
31;32;41;42;60;61;71;81;N2;N4
|
Cycle Access:
|
No
|
ST. PIERRE DU BOIS - RUE DES PRES
|
( RUE DES LANDES to RUE DES MARCHEZ )
|
Description:
|
concrete pour
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Monday, 24/03/25
|
Timing:
All Day
|
Promoter:
|
davy
|
Contractor:
|
davy
|
Bus Routes Affected:
|
Houguette PS 1A
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - LONGUE RUE
|
( LA GRANDE RUE to RUE DES CRABBES )
|
Description:
|
Grit blasting railings.
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Monday, 24/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
C and D Carpenters
|
Contractor:
|
C and D Carpenters
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
ST. SAVIOUR - RUE DES CRABBES
|
( RUE DE ST. APPOLINE to RUE PERELLE )
|
Description:
|
Repair damaged drainage channels and surrounding bitmac
|
Start date:
|
Monday, 24/03/25
|
End date:
|
Friday, 28/03/25
|
Timing:
All Day
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Tarmac Services
|
Bus Routes Affected:
|
Houguette PS 1B;Houguette PS 3B;LBHS 5A;LBHS 5B;LMDC HS 3A;LMDC HS 3B;LMDC HS 4A;LMDC HS 4B;LV HS 3B;LV HS 8A;LMDC HS LB HS 3A;LMDC HS LB HS 3B
|
Cycle Access:
|
Yes
|
VALE - SOHIER ROAD
|
|
Description:
|
CCTV Camera clean
|
Start date:
|
Friday, 21/03/25
|
End date:
|
Friday, 21/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
Bus Routes Affected:
|
LV 2B; SS 5A; SS 5B; P2;11;12
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - GRANGE ROAD
|
|
Description:
|
Crane lift.
|
Start date:
|
Tuesday, 18/03/25
|
End date:
|
Thursday, 20/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
Bus Routes Affected:
|
31;41;42;60;61;71;81;N2;N4
|
Cycle Access:
|
Dismount past works
|
ST. PETER PORT - SOUTH ESPLANADE; LES ECHELONS to LES ECHELONS FILTER
|
( LES ECHELONS to LES ECHELONS FILTER )
|
Description:
|
Tree surgery works.
|
Start date:
|
Wednesday, 19/03/25
|
End date:
|
Thursday, 20/03/25
|
Timing:
Between AM and PM Peaks
|
Promoter:
|
Treevolution
|
Contractor:
|
Treevolution
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|