Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - MONT D`AVAL
Description: Work starting 07:00 AM on Tue 22 Oct 24 and finishing 11:59 PM on Sun 27 Oct 24 - Trial trench investigation works.
Start date: Tuesday, 22/10/24 End date: Sunday, 27/10/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: 42, N2 Cycle Access: Dismount past works

CASTEL - RUE DE LA TRAPPE ( RUE DES MARAIS to DOUIT LANE )
Description: Work starting 08:00 AM on Mon 21 Oct 24 and finishing 05:00 PM on Thu 24 Oct 24 - Duct installation
Start date: Monday, 21/10/24 End date: Thursday, 24/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Tue 31 Dec 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Tuesday, 31/12/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

FOREST - LES REBOUQUETS
Description: Work starting 07:00 AM on Wed 09 Oct 24 and finishing 05:00 PM on Fri 22 Nov 24 - High and low voltage cable upgrade and duct lay
Start date: Wednesday, 09/10/24 End date: Friday, 22/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: No

ST. ANDREW - LA RUE DE LA CORBINERIE
Description: Work starting 08:00 AM and finishing 05:00 PM daily between Mon 21 Oct 24 and Thu 24 Oct 24 - CBT installations and cable splicing
Start date: Monday, 21/10/24 End date: Thursday, 24/10/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LES HUNGUETS ( ROUTE DES BLICQS to RUE DES BUTTES )
Description: Duct installation
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - ROUTE DE ST. ANDRE
Description: closure to allow for service alteration
Start date: Monday, 21/10/24 End date: Friday, 25/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 71 Cycle Access: Dismount past works

ST. ANDREW - ROUTE DES FAUCONNAIRES ( RUE DES TRUCHOTS to ROUTE DE LA CROIX AU BAILIFF )
Description: Tree felling
Start date: Tuesday, 22/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Cycle Access: Yes

ST. MARTIN - CALAIS ROAD ( CALAIS to LE VARCLIN )
Description: Closure to allow service upgrades
Start date: Monday, 21/10/24 End date: Friday, 25/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LES BLANCHES PIERRES
Description: Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber and duct installation
Start date: Monday, 14/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - ALLEZ STREET
Description: Work starting 07:30 AM on Tue 24 Sep 24 and finishing 04:00 PM on Fri 25 Oct 24 - Footway repaving
Start date: Tuesday, 24/09/24 End date: Friday, 25/10/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: No: dismount

ST. PETER PORT - BACK STREET
Description: Scaffolding ; Property: No 3; Purpose: Demolition / New Build
Start date: Friday, 08/03/24 End date: Tuesday, 29/10/24 Timing: Between AM and PM Peaks
Promoter: Formula Scaffolding Contractor: Formula Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - HAVELET ( THE STRAND to HAUTEVILLE )
Description: Work starting 08:00 AM on Tue 01 Oct 24 and finishing 04:00 PM on Fri 17 Jan 25 - House demolition.
Start date: Tuesday, 01/10/24 End date: Friday, 17/01/25 Timing: All Day
Promoter: Bob Froome and Sons Contractor: Bob Froome and Sons
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET ( GAS LANE to LES AMBALLES )
Description: Install new water service to new development
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET ( GAS LANE to LES AMBALLES )
Description: Install new telecoms service connection to new development
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET ( GAS LANE to LES AMBALLES )
Description: Foul sewer connection to new property
Start date: Monday, 21/10/24 End date: Monday, 28/10/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - LOWER CANICHERS ( LE TRUCHOT to DOYLE STREET )
Description: Work starting 08:00 AM on Mon 30 Sep 24 and finishing 07:00 AM on Mon 28 Apr 25 - building repair and refit
Start date: Monday, 30/09/24 End date: Monday, 28/04/25 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - THE STRAND
Description: Scaffold for construction; Property: La Coquere; Purpose: Demolition / New Build
Start date: Wednesday, 10/07/24 End date: Saturday, 12/04/25 Timing: All Day
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE LIHOU ( RUE DU LONGFRIE to RUE DES GRANDES RUES )
Description: Work starting 09:00 AM on Thu 29 Aug 24 and finishing 05:00 PM on Fri 15 Nov 24 - Road blocked due to collapsed granite wall approx 10m from the Route de Lihou and Rue du Longfrie junction, near property Longfrie House.
Start date: Thursday, 29/08/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Traffic and Highways Contractor: Traffic and Highways
Bus Routes Affected: Cycle Access: No

ST. PIERRE DU BOIS - ROUTE DE PLAISANCE
Description: Work starting 07:30 AM on Mon 21 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Road resurfacing and patch repairs.
Start date: Monday, 21/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: 71, 93, 94, N3 Cycle Access: Yes

ST. SAVIOUR - RUE DES LOHIERS
Description: Work starting 08:00 AM on Mon 14 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber and duct installation
Start date: Monday, 14/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: No

VALE - LA ROUTE MILITAIRE ( LA ROUTE DU BRAYE to LA FOLIE LANE )
Description: Work starting 07:00 AM on Mon 21 Oct 24 and finishing 05:00 PM on Thu 24 Oct 24 - closure to allow for a service alteration
Start date: Monday, 21/10/24 End date: Thursday, 24/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 12 Cycle Access: Dismount past works

VALE - MAISON DE BAS ROAD ( LA CORVEE ROAD to LA MAISON AU COMPTE )
Description: closure to allow for service alteration
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DU MARAIS ( LA VIELLE MARAIS to ROCQUE BALAN LANE )
Description: Work starting 07:00 AM on Tue 15 Oct 24 and finishing 05:00 PM on Fri 25 Oct 24 - service alteration
Start date: Tuesday, 15/10/24 End date: Friday, 25/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
CASTEL - RETOT; LA GIFFARDIERE to LES QUERITES ( LA GIFFARDIERE to LES QUERITES )
Description: Repairs to roadside wall.
Start date: Monday, 07/10/24 End date: Thursday, 07/11/24 Timing: All Day
Promoter: Island Formwork and Construction Ltd Contractor: Island Formwork and Construction Ltd
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PETER PORT - LE BOUET
Description: For construction of 3 flats
Start date: Monday, 23/09/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Just Build It Ltd Contractor: Just Build It Ltd
Bus Routes Affected: 31, 32 Cycle Access: Yes, in direction of one-way

Signals
CASTEL - COBO COAST ROAD ( ROUTE DE COBO to ROUTE DE CARTERET )
Description: Rebuilding of boundary wall
Start date: Monday, 30/09/24 End date: Sunday, 17/11/24 Timing: All Day
Promoter: Ravenscroft Construction Ltd Contractor: Ravenscroft Construction Ltd
Bus Routes Affected: Cycle Access: Yes

ST. ANDREW - ROUTE DE ST ANDRE (LE BOUILLON ROAD); ROUTE DE L'ISSUE to RUETTE DES COURTILLETS ( ROUTE DE L'ISSUE to RUETTE DES COURTILLETS )
Description: Work starting 08:00 AM on Mon 21 Oct 24 and finishing 06:00 PM on Wed 23 Oct 24 - Upgrade surface water network
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - ROUTE DE PORT GRAT; ROUTE DE PULIAS to LES DICQS ( ROUTE DE PULIAS to LES DICQS )
Description: Rebuilding roadside wall.
Start date: Monday, 14/10/24 End date: Saturday, 16/11/24 Timing: All Day
Promoter: Another Level Ltd Contractor: Another Level Ltd
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - SANDY HOOK
Description: Building road side boundary wall.
Start date: Monday, 07/10/24 End date: Friday, 25/10/24 Timing: Between AM and PM Peaks
Promoter: Breaton Construction Contractor: Breaton Construction
Bus Routes Affected: Cycle Access: Yes

VALE - LA ROUTE DE L'ISLET; LA GARENNE to L'ABBAYE ( LA GARENNE to L'ABBAYE )
Description: service alteration.
Start date: Monday, 21/10/24 End date: Wednesday, 23/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Yes


Starting - next 7 days
Closures
CASTEL - LA NEUVE RUE
Description: Work starting 07:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Fri 15 Nov 24 - Upgrade foul water manhole
Start date: Monday, 28/10/24 End date: Friday, 15/11/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: P2, 51, 52 Cycle Access: Dismount past works

CASTEL - LES BEAUCAMPS ( LES VIEUX BEAUCAMPS to MONT D`AVAL )
Description: Work starting 12:00 AM on Mon 28 Oct 24 and finishing 11:59 PM on Sun 03 Nov 24 - Undertake trial trench investigation works
Start date: Monday, 28/10/24 End date: Sunday, 03/11/24 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Geomarine
Bus Routes Affected: 60, 61 Cycle Access: Dismount past works

CASTEL - RUE DE GALAAD
Description: CCTV Camera Clean
Start date: Monday, 28/10/24 End date: Monday, 28/10/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 41, N2 Cycle Access: Yes

CASTEL - RUE DE LA MASSE ( RUE ST. GERMAIN to RUETTE DE LA GENEROTTE )
Description: Tree surgery works.
Start date: Tuesday, 29/10/24 End date: Wednesday, 30/10/24 Timing: Between AM and PM Peaks
Promoter: Arborcraft Ltd Contractor: Arborcraft Ltd
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUETTE DE ST. BRIOCQ
Description: Road resurfacing
Start date: Monday, 28/10/24 End date: Friday, 08/11/24 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Traffic and Highway Services (Capital Works)
Bus Routes Affected: 60, 61 Cycle Access: No: dismount

CASTEL - RUETTE DU COURTIL SIMON ( ROUTE DE COBO to RUETTE DU VILLOCQ )
Description: supply line alteration
Start date: Tuesday, 29/10/24 End date: Thursday, 31/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - SOUS LES COURTILS ( ROUTE DE LA MARE to RUE D'ALBECQ )
Description: CCTV Camera Clean
Start date: Friday, 25/10/24 End date: Friday, 25/10/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Yes

FOREST - LA ROBERGE ( RUE DU CATOROHE to LA RUE DU BIGARD )
Description: 2 x Chamber installations
Start date: Thursday, 24/10/24 End date: Monday, 28/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

FOREST - LA RUE DE L`EPINEL ( LA RUE DES VILLETS to LA RUE DE LA VRANGUE )
Description: Work starting 08:00 AM on Mon 28 Oct 24 and finishing 05:00 PM on Tue 29 Oct 24 - Chamber installation
Start date: Monday, 28/10/24 End date: Tuesday, 29/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - LONGUE RUE ( LA RUE MAZE to LA ROUTE DES COUTURES )
Description: Work starting 08:00 AM on Mon 28 Oct 24 and finishing 04:00 PM on Wed 30 Oct 24 - Cable splicing and excavate blocked duct
Start date: Monday, 28/10/24 End date: Wednesday, 30/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - ANN`S PLACE ( COLLEGE STREET to MOTOR CYCLE PARK )
Description: Cable and CBT installations
Start date: Wednesday, 23/10/24 End date: Wednesday, 23/10/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - DAMOUETTES LANE
Description: Sewer Rehabilitation - Survey
Start date: Tuesday, 29/10/24 End date: Tuesday, 29/10/24 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - FIRST TOWER LANE ( LE GRAND BOUET to LES BANQUES )
Description: Dismantling scaffolding.
Start date: Wednesday, 23/10/24 End date: Thursday, 24/10/24 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - GEORGE STREET ( VAUVERT to ALLEZ STREET )
Description: Trial pit in footpath
Start date: Monday, 28/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LOWER POLLET
Description: Erection of Christmas Lights
Start date: Sunday, 27/10/24 End date: Sunday, 27/10/24 Timing: All Day
Promoter: Event Hire Guernsey Ltd Contractor: Event Hire Guernsey Ltd
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - UPLAND ROAD ( GRANGE ROAD to MONUMENT GARDENS )
Description: CBT and spine cable installation
Start date: Monday, 28/10/24 End date: Monday, 28/10/24 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - ROUTE DE ROCQUAINE ( RUE DE L'ISSUE to RUE DU DOUIT DU MOULIN )
Description: service alteration
Start date: Tuesday, 29/10/24 End date: Thursday, 31/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 61, 71, 91, 92, 93, 94, N3 Cycle Access: Dismount past works

ST. SAMPSON - LA ROUTE DES CAPELLES
Description: Repairs to footpath
Start date: Monday, 28/10/24 End date: Monday, 28/10/24 Timing: All Day
Promoter: Tarmac Services Contractor: Tarmac Services
Bus Routes Affected: 31, 32 Cycle Access: Yes

ST. SAMPSON - ROUTE CARRE
Description: Work starting 07:00 AM on Fri 25 Oct 24 and finishing 05:00 PM on Fri 29 Nov 24 - Distribution pillar installation and low voltage cabling upgrade
Start date: Friday, 25/10/24 End date: Friday, 29/11/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: P2, 13, 21, N1, Cycle Access: Dismount past works

ST. SAMPSON - ROUTE DU CAMP DU ROI ( RUE DES ANNEVILLES to LES ABREUVEURS ROAD )
Description: Work starting 08:00 AM on Tue 29 Oct 24 and finishing 05:00 PM on Fri 01 Nov 24 - Chamber installation, cable installation and splicing
Start date: Tuesday, 29/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: P2 Cycle Access: Dismount past works

ST. SAMPSON - RUE DES MONTS ( RUE DES POINTUES ROCQUES to )
Description: Service alteration
Start date: Monday, 28/10/24 End date: Wednesday, 30/10/24 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAVIOUR - LA GRANDE LANDE ( RUE DES LOHIERS to RUE DES RIGNEAUX )
Description: Crane Lift.
Start date: Monday, 28/10/24 End date: Friday, 01/11/24 Timing: Between AM and PM Peaks
Promoter: Verdellis Construction Contractor: Verdellis Construction
Bus Routes Affected: Cycle Access: Dismount past works

VALE - BELVAL ROAD ( ROUTE DES COUTURES to VILLE ES PIES )
Description: Work starting 08:00 AM on Mon 28 Oct 24 and finishing 04:00 PM on Fri 01 Nov 24 - Chamber and duct installation
Start date: Monday, 28/10/24 End date: Friday, 01/11/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LES BARRAS LANE ( LES GRANDES MIELLES LANE to PLEINHEAUME ROAD )
Description: Excavate blocked duct
Start date: Wednesday, 23/10/24 End date: Thursday, 24/10/24 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DES HAIZES ( SOHIER ROAD to ROSELAND LANE )
Description: Install new water service
Start date: Monday, 28/10/24 End date: Wednesday, 30/10/24 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. PETER PORT - COLLINGS ROAD
Description: scaffolding erection; Property: Beehive; Purpose: External Decoration
Start date: Saturday, 26/10/24 End date: Sunday, 24/11/24 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PIERRE DU BOIS - Bunker of Horrors 2024 ( Route Des Adams to Bas Rouvets )
Description: Bunker of Horrors 2024
Start date: Saturday, 26/10/24 End date: Monday, 28/10/24 Timing: All Day
Promoter: Private Individual Contractor: N/A
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

Signals
CASTEL - ROUTE DE L'EGLISE; RUE DU PREEL to RUETTE DE TOUILLETS ( RUE DU PREEL to RUETTE DE TOUILLETS )
Description: Splicing new connections
Start date: Monday, 28/10/24 End date: Wednesday, 30/10/24 Timing: Between AM and PM Peaks
Promoter: JT Guernsey Contractor: JT Guernsey
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - COLLEGE STREET; ST. JAMES STREET to ST. JULIAN'S AVENUE ( ST. JAMES STREET to ST. JULIAN'S AVENUE )
Description: Road repairs
Start date: Sunday, 27/10/24 End date: Sunday, 27/10/24 Timing: All Day
Promoter: Traffic and Highway Services (Highways Inspector) Contractor: Geomarine
Bus Routes Affected: 31, 32, 41, 42, 51, 52, 60, 61, 71, 81, N2 Cycle Access: Yes