Only closures of main traffic routes are listed in this summary.
For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.
|
CASTEL - LES BAISSIERES
|
|
|
Description:
|
Work starting 08:30 AM on Mon 20 Jul 26 and finishing 05:00 PM on Sun 23 Aug 26 - Foul Manhole chamber refurbishments
|
|
Start date:
|
Monday, 20/07/26
|
End date:
|
Sunday, 23/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LV 1B; LV 2B; SS 1B; 51;52
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - LES BEAUCAMPS
|
|
|
Description:
|
Work starting 07:30 AM on Mon 20 Jul 26 and finishing 04:00 PM on Sat 29 Aug 26 - Road resurfacing
|
|
Start date:
|
Monday, 20/07/26
|
End date:
|
Saturday, 29/08/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Capital Works)
|
Contractor:
|
Ronez (Patching)
|
|
Bus Routes Affected:
|
LB 1B; LMDC 1A / LB 7A; LMDC 1B / LB 7B; LMDC 3A / LB 8A; LMDC 3B / LB 8B; LV 5A / LB 6A; LV 5B / LB 6B; 60;61
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - LES QUERITES
|
( RUE DE LA HOUGUE to ROUTE DU TERTRE )
|
|
Description:
|
REBUILD ROADSIDE WALL
|
|
Start date:
|
Monday, 03/08/26
|
End date:
|
Sunday, 30/08/26
|
Timing:
All Day
|
|
Promoter:
|
Granite Le Pelley
|
Contractor:
|
Granite Le Pelley
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - ROUTE DE CARTERET
|
|
|
Description:
|
Work starting 08:00 AM on Mon 27 Jul 26 and finishing 08:00 AM on Mon 17 Aug 26 - erect scaffolding on the iconic bridge; Property: Le Genats Bridge; Purpose: External Decoration
|
|
Start date:
|
Monday, 27/07/26
|
End date:
|
Monday, 17/08/26
|
Timing:
All Day
|
|
Promoter:
|
Advanced Scaffolding (Guernsey)
|
Contractor:
|
Advanced Scaffolding (Guernsey)
|
|
Bus Routes Affected:
|
SS 8A; SS 8B; 42
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUE DE LA MASSE
|
|
|
Description:
|
Extend water main
|
|
Start date:
|
Monday, 10/08/26
|
End date:
|
Monday, 24/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
Castel 1A; Castel 2A; Castel 1B; Castel 3B
|
Cycle Access:
|
No
|
|
CASTEL - RUE DES CORNEILLES
|
( RUETTE DE FRIES to )
|
|
Description:
|
roadside wall repairs. Pedestrian and cycle access.
|
|
Start date:
|
Monday, 10/08/26
|
End date:
|
Sunday, 23/08/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
Castel PS 2A;LMDC HS LB HS 3B
|
Cycle Access:
|
Yes
|
|
CASTEL - RUETTE DE TOUILLETS
|
( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
|
|
Description:
|
Work starting 08:00 AM on Sat 19 Aug 23 and finishing 05:00 PM on Mon 31 Aug 26 - Investigation and repairs to roadside wall
|
|
Start date:
|
Saturday, 19/08/23
|
End date:
|
Monday, 31/08/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
Private Individual
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
FOREST - RUE DES AUBERTS
|
( LE BOURG to )
|
|
Description:
|
Primary substation replacement
|
|
Start date:
|
Monday, 22/06/26
|
End date:
|
Friday, 27/11/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. MARTIN - LA GRANDE RUE
|
|
|
Description:
|
Substation connection and low voltage network upgrade
|
|
Start date:
|
Monday, 10/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 1A; LB 1B; LB 2A; LB 3B; LV 4B; 81;91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BERTHELOT STREET
|
|
|
Description:
|
Work starting 07:30 AM on Mon 17 Mar 25 and finishing 11:59 PM on Thu 31 Dec 26 - Scaffolding at La Bigoterie no. 14.; Property: La Bigoterie no. 14; Purpose: External Decoration
|
|
Start date:
|
Monday, 17/03/25
|
End date:
|
Thursday, 31/12/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - DAMOUETTES LANE
|
|
|
Description:
|
Work starting 08:00 AM on Mon 27 Jul 26 and finishing 05:00 PM on Tue 08 Sep 26 - Sewer Renovation Works ( GEO _ ET )
|
|
Start date:
|
Monday, 27/07/26
|
End date:
|
Tuesday, 08/09/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - GEORGE ROAD
|
( HAUTEVILLE to LE VAL DES TERRES )
|
|
Description:
|
Roadside wall stabilisation for the length of Tangletrees property (approx 40meters).
Drilling of soil nails and netting on earth bank above roadside wall
|
|
Start date:
|
Monday, 10/08/26
|
End date:
|
Friday, 04/09/26
|
Timing:
All Day
|
|
Promoter:
|
NSP Foundations
|
Contractor:
|
NSP Foundations
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - MILL STREET
|
|
|
Description:
|
Scaffolding for structural repairs; Property: 17 Mill St; Purpose: Other (see Details)
|
|
Start date:
|
Saturday, 15/08/26
|
End date:
|
Tuesday, 15/09/26
|
Timing:
All Day
|
|
Promoter:
|
Island Scaffolding
|
Contractor:
|
Island Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - PIETTE ROAD
|
|
|
Description:
|
Work starting 08:00 AM and finishing 05:00 PM daily between Wed 22 Apr 26 and Thu 20 Aug 26 - ERECTING SCAFFOLDING; Property: BURNLEY; Purpose: Roofing Works
|
|
Start date:
|
Wednesday, 22/04/26
|
End date:
|
Friday, 21/08/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Advanced Scaffolding (Guernsey)
|
Contractor:
|
Advanced Scaffolding (Guernsey)
|
|
Bus Routes Affected:
|
Vauvert PS 1B
|
Cycle Access:
|
Yes
|
|
ST. PIERRE DU BOIS - RUE DU BORDAGE
|
( RUE DU CAMP AU PRETRE to RUE DE LA FONTENELLE )
|
|
Description:
|
rebuild roadside wall
|
|
Start date:
|
Monday, 15/06/26
|
End date:
|
Tuesday, 25/08/26
|
Timing:
All Day
|
|
Promoter:
|
Breton Construction
|
Contractor:
|
Breton Construction
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - RONDE CHEMINEE
|
|
|
Description:
|
Low voltage cabling and distribution pillar upgrades
|
|
Start date:
|
Monday, 15/06/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Guernsey Electricity
|
|
Bus Routes Affected:
|
Vale PS 1A;Vale PS 3B;SS HS 1A;SS HS 3B;SS HS 4A;SS HS 4A NEW;SS HS 5A;SS HS 6A;SS HS 7B;SS HS 8A
|
Cycle Access:
|
Dismount past works
|
|
VALE - VALE-MISC54
|
( ROCQUE ES CAS to LA MOYE ROAD )
|
|
Description:
|
Deliveries and Barn renovations
|
|
Start date:
|
Tuesday, 14/07/26
|
End date:
|
Monday, 14/09/26
|
Timing:
All Day
|
|
Promoter:
|
Omega Group
|
Contractor:
|
Omega Group
|
|
Bus Routes Affected:
|
Vale PS 2B;Vale PS 3B
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - GRANGE ROAD
|
|
|
Description:
|
Work starting 08:00 AM on Mon 10 Aug 26 and finishing 04:00 PM on Fri 21 Aug 26 - unloading scaffolding
|
|
Start date:
|
Monday, 10/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Impact Scaffolding
|
Contractor:
|
Impact Scaffolding
|
|
Bus Routes Affected:
|
31;32;41;42;60;61;71;81;N2;N4
|
Cycle Access:
|
Yes, in direction of one-way
|
|
VALE - TRAFALGAR ROAD
|
|
|
Description:
|
Erect Scaffolding ; Property: New Home Base store Project; Purpose: Access
|
|
Start date:
|
Monday, 27/07/26
|
End date:
|
Thursday, 27/08/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes, in direction of one-way
|
|
TORTEVAL - ROUTE DE LA LAGUE
|
( RUE DE LA VILTOLE to RUE DU HUREL )
|
|
Description:
|
Work starting 08:00 AM on Mon 08 Jun 26 and finishing 05:00 PM on Fri 02 Oct 26 - repair roadside wall
|
|
Start date:
|
Monday, 08/06/26
|
End date:
|
Friday, 02/10/26
|
Timing:
All Day
|
|
Promoter:
|
States Committee of the Environment and Infrastructure
|
Contractor:
|
States Committee of the Environment and Infrastructure
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
CASTEL - RUE DU FRIQUET
|
|
|
Description:
|
Work starting 07:30 AM on Sat 22 Aug 26 and finishing 05:00 PM on Mon 24 Aug 26 - Service alteration
|
|
Start date:
|
Saturday, 22/08/26
|
End date:
|
Monday, 24/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
LMDC 7B; LV 1A; LV 8A; P2;51;52
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - RUETTE DES SAUMAREZ
|
( RUE DES HOUMETS to ROUTE DE SAUMAREZ )
|
|
Description:
|
Telephone Pole maintenance
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Wednesday, 19/08/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Sure Guernsey
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
FOREST - LA RUE DES FOSSES
|
( RUE DU MANOIR to RUE DES REINES )
|
|
Description:
|
service alteration
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Thursday, 20/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Forest PS 1A;Forest PS 1B;LB HS 6A;LB HS 6B;LV HS 5A;LV HS 5A Overflow;LV HS 5B;LV HS LB HS 5A;LV HS LB HS 5B
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - FOULON ROAD
|
( LE FOULON to ROUTE DES FAUCONNAIRES )
|
|
Description:
|
TREE SURGERY
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Monday, 17/08/26
|
Timing:
All Day
|
|
Promoter:
|
Arbology
|
Contractor:
|
Arbology
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. ANDREW - LA MARE
|
( RUETTE DES VAUXBELETS to RUE FRAIRIES )
|
|
Description:
|
Excavate blocked duct - rectification work
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Wednesday, 19/08/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
LBHS 4A
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - LA GRANDE RUE
|
( SCHOOL LANE to LES CAMPS )
|
|
Description:
|
Tree Surgery Work
|
|
Start date:
|
Friday, 21/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 1A; LB 1B; LB 2A; LB 3B; LV 4B; 81;91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. MARTIN - LES CAMPS
|
|
|
Description:
|
Replacing two old streetlights
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Wednesday, 19/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
St Martin 3A; St Martin 3B; LB 1A; LB 1B; LB 2A; LB 3B; LV 4B; 81;91;92;93;94;95;N3
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - BRUCE LANE
|
( LES AMBALLES to CORBIN STEPS )
|
|
Description:
|
Essential maintenance to gas service.
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Tuesday, 18/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Gas
|
Contractor:
|
Guernsey Gas
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - Crown Pier Asian and Farmer`s Market
|
|
|
Description:
|
Careening Hard Arm closure 7am to 5pm
|
|
Start date:
|
Sunday, 23/08/26
|
End date:
|
Sunday, 23/08/26
|
Timing:
All Day
|
|
Promoter:
|
Private Individual
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No:
|
|
ST. PETER PORT - LA COUPERDERIE
|
( VICTORIA ROAD to CORDIER HILL )
|
|
Description:
|
Tree surgery
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Friday, 28/08/26
|
Timing:
All Day
|
|
Promoter:
|
treeworks
|
Contractor:
|
treeworks
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
ST. PETER PORT - MONUMENT GARDENS
|
( to UPLAND ROAD )
|
|
Description:
|
Supply line upgrade
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Thursday, 20/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. PETER PORT - WELL ROAD
|
( LES AMBALLES to GLATEGNY ESPLANADE )
|
|
Description:
|
Repair foul water drain
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
ST. SAMPSON - BAUBIGNY ROAD
|
( DUVEAUX ROAD to RUE DE DOL )
|
|
Description:
|
Work starting 08:00 AM on Mon 17 Aug 26 and finishing 04:00 PM on Tue 18 Aug 26 - Tree Surgery Works
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Tuesday, 18/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Tree Service Ltd
|
Contractor:
|
Guernsey Tree Service Ltd
|
|
Bus Routes Affected:
|
SS 2B; SS 4B; SS 5B; SS 6B; SS 8B; 21
|
Cycle Access:
|
No
|
|
ST. SAMPSON - LES GIGANDS ROAD
|
|
|
Description:
|
Repairs to raised bitmac table
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Thursday, 20/08/26
|
Timing:
All Day
|
|
Promoter:
|
Traffic and Highway Services (Highways Inspector)
|
Contractor:
|
Tarmac Services
|
|
Bus Routes Affected:
|
Vale PS 1A;Vale PS 3B;SS HS 2A;SS HS 3A;SS HS 3B;SS HS 7B
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - O eh sis @ Victoria Park
|
|
|
Description:
|
Road closed from 16:30 to 23:00 except for access to businesses and properties.
|
|
Start date:
|
Saturday, 22/08/26
|
End date:
|
Saturday, 22/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Football Association
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Vale 2A
|
Cycle Access:
|
Yes
|
|
ST. SAMPSON - ROBERGERIE
|
( ROUTE MILITAIRE to RUE JACQUES )
|
|
Description:
|
Work starting 09:00 AM and finishing 02:00 PM - Drainage cleaning and CCTV
|
|
Start date:
|
Friday, 21/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
Between AM and PM Peaks
|
|
Promoter:
|
Guernsey Water (Wastewater)
|
Contractor:
|
Guernsey Water (Wastewater)
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Dismount past works
|
|
TORTEVAL - Guernsey Mind 10K Challange
|
|
|
Description:
|
Rue de Portelet closed 8am to 10am and all parking by wall suspended
Grandes Rocques car park parking suspended 8am to 12pm
|
|
Start date:
|
Sunday, 23/08/26
|
End date:
|
Sunday, 23/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Mind
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
No
|
|
VALE - RUE DE L`ECOLE
|
|
|
Description:
|
Excavations required to replace a faulty streetlight
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Friday, 21/08/26
|
Timing:
All Day
|
|
Promoter:
|
Guernsey Electricity
|
Contractor:
|
Trant
|
|
Bus Routes Affected:
|
Vale PS 1A;Vale PS 2B;LV HS 1A;LV HS 1B;LV HS 7B;SS HS 6A;SS HS 6B
|
Cycle Access:
|
Dismount past works
|
|
CASTEL - Donkey Derby
|
|
|
Description:
|
Temporary one-ways from 10am to 8pm
|
|
Start date:
|
Saturday, 22/08/26
|
End date:
|
Saturday, 22/08/26
|
Timing:
All Day
|
|
Promoter:
|
Lions Club Guernsey
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
Castel PS 1A;LMDC HS 5A;LMDC HS 6B;LMDC HS 7A;LV HS 5B;SS HS 4A NEW;LV HS LB HS 5B
|
Cycle Access:
|
Yes, in direction of one-way
|
|
ST. PETER PORT - AMHERST
|
( LA BUTTE to GUELLES ROAD )
|
|
Description:
|
unloading of scaffolding
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Monday, 24/08/26
|
Timing:
All Day
|
|
Promoter:
|
Access Scaffolding
|
Contractor:
|
Access Scaffolding
|
|
Bus Routes Affected:
|
SS 2B; SS 3A; 31;32
|
Cycle Access:
|
Yes, in direction of one-way
|
|
ST. PIERRE DU BOIS - The West Show
|
|
|
Description:
|
West United Agricultural and Horticultural Society - West Show
|
|
Start date:
|
Wednesday, 19/08/26
|
End date:
|
Thursday, 20/08/26
|
Timing:
All Day
|
|
Promoter:
|
West United Agricultural and Horticultural Society
|
Contractor:
|
N/A
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|
|
ST. PETER PORT - LA ROUTE DES LONGS CAMPS; ROUTE DE LA RAMEE to LES PORTES
|
( ROUTE DE LA RAMEE to LES PORTES )
|
|
Description:
|
Replace and reset noisy manhole cover
|
|
Start date:
|
Monday, 17/08/26
|
End date:
|
Tuesday, 18/08/26
|
Timing:
All Day
|
|
Promoter:
|
Sure Guernsey
|
Contractor:
|
Geomarine
|
|
Bus Routes Affected:
|
|
Cycle Access:
|
Yes
|