Road closures and delays

Only closures of main traffic routes are listed in this summary. For information of closures and other traffic management on minor roads please check the Traffic & Highways Road Information Map
Please note, the timings shown relate to when works are planned to be taking place within the road section.
Traffic Management (e.g. road closures and one-ways) will often be placed out in advance of the works and, unless otherwise advised, remain in place until early morning the day following the works. This is to ensure the safety of operatives setting out and collecting the signage. It also allows asphalt to cure before the road is trafficked.

Closures
CASTEL - RUE DES BELLES ( RUE DE LA PORTE to RUE DES BERGERS )
Description: Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Tue 05 Dec 23 - Chamber installations
Start date: Tuesday, 28/11/23 End date: Tuesday, 05/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

CASTEL - RUE DU PRESBYTERE ( CHEMIN ROBIN to ROUTE DE L'EGLISE )
Description: Work starting 08:00 AM on Tue 21 Nov 23 and finishing 04:00 PM on Fri 22 Dec 23 - Duct Installation
Start date: Tuesday, 21/11/23 End date: Friday, 22/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: P2, 51, 52 Cycle Access: Dismount past works

CASTEL - RUETTE DE TOUILLETS ( ROUTE DE L'EGLISE to RUETTE DES PONCHEZ )
Description: Work starting 08:00 AM on Sat 19 Aug 23 and finishing 11:59 PM on Mon 01 Jan 24 - Investigation and repairs to roadside wall
Start date: Saturday, 19/08/23 End date: Monday, 01/01/24 Timing: All Day
Promoter: Private Individual Contractor: Private Individual
Bus Routes Affected: Cycle Access: Yes

Emergency Activity - VALE - LA ROCHELLE ROAD
Description: service fault to La Houguette
Start date: Sunday, 03/12/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 11, 91, 92, N1 Cycle Access: Dismount past works

FOREST - RUE DES ROULIAS
Description: Work starting 07:00 AM on Mon 27 Nov 23 and finishing 05:00 PM on Fri 15 Dec 23 - High and low voltage cabling upgrade
Start date: Monday, 27/11/23 End date: Friday, 15/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LES RUETTES
Description: Work starting 07:00 AM on Fri 03 Nov 23 and finishing 06:00 AM on Tue 05 Dec 23 - PEH Project
Start date: Friday, 03/11/23 End date: Tuesday, 05/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - ALLEZ STREET ( GEORGE STREET to VAUVERT )
Description: Footway repaving
Start date: Monday, 06/11/23 End date: Wednesday, 20/12/23 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: Ronez (Patching)
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - BROCK ROAD ( GRANGE ROAD to ROSAIRE AVENUE )
Description: Closure to allow for main replacement, x2 new distribution pillars and new sub connections
Start date: Tuesday, 17/10/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 31 Cycle Access: Yes

ST. PETER PORT - CLIFF STREET
Description: Work starting 07:30 AM and finishing 11:59 PM daily between Tue 19 Sep 23 and Mon 04 Dec 23 - Removal of soil and deliveries
Start date: Tuesday, 19/09/23 End date: Monday, 04/12/23 Timing: Between AM and PM Peaks
Promoter: Breaton Construction Contractor: Breaton Construction
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - LE POLLET
Description: Scaffolding ; Property: No 13, Le Pollet (Paper Chase); Purpose: Access
Start date: Sunday, 19/11/23 End date: Tuesday, 02/01/24 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LE POLLET
Description: Scaffolding ; Property: Christies - Warwick House; Purpose: Roofing Works
Start date: Monday, 02/10/23 End date: Monday, 01/04/24 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - LEFEBVRE STREET
Description: Scaffolding ; Property: Lefebvre Court; Purpose: Access
Start date: Sunday, 12/11/23 End date: Wednesday, 14/02/24 Timing: Between AM and PM Peaks
Promoter: Impact Scaffolding Contractor: Impact Scaffolding
Bus Routes Affected: Cycle Access: Yes

ST. PETER PORT - NORTH PLANTATION
Description: Scaffolding ; Property: No 13, North Plantation (Choices); Purpose: Access
Start date: Monday, 20/11/23 End date: Tuesday, 02/01/24 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: No

ST. PETER PORT - ST. JAMES STREET
Description: replacing cladding
Start date: Saturday, 02/12/23 End date: Sunday, 03/12/23 Timing: Between AM and PM Peaks
Promoter: J W Rihoy Builders Contractor: J W Rihoy Builders
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE QUANTERAINE ( RUE DU BORDAGE to ROUTE DES SAGES )
Description: Work starting 07:00 AM on Mon 20 Nov 23 and finishing 05:00 PM on Mon 04 Dec 23 - Install new water main
Start date: Monday, 20/11/23 End date: Monday, 04/12/23 Timing: All Day
Promoter: Guernsey Water Contractor: Geomarine
Bus Routes Affected: Cycle Access: No

ST. SAMPSON - RUE DE BAS ( ROUTE ST. CLAIR to DUVEAUX ROAD )
Description: Roadside wall collapsed.
Start date: Wednesday, 25/10/23 End date: Wednesday, 06/12/23 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks and Events) Contractor: Traffic and Highway Services (Roadworks and Events)
Bus Routes Affected: Cycle Access: Yes

ST. SAVIOUR - LE FRIE AU FOUR ( RUE DE LA NEUVE MAISON to RUE FEVERESSE )
Description: Rebuilding a gable
Start date: Monday, 30/10/23 End date: Sunday, 31/12/23 Timing: Between AM and PM Peaks
Promoter: Granite Le Pelley Contractor: Granite Le Pelley
Bus Routes Affected: Cycle Access: Yes

ST. SAVIOUR - RUE DES HOUGUES
Description: Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Tue 05 Dec 23 - Chamber and duct installation
Start date: Tuesday, 28/11/23 End date: Tuesday, 05/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LA BAILLOTERIE LANE
Description: scaffolding services; Property: unknown; Purpose: Roofing Works
Start date: Monday, 13/11/23 End date: Monday, 11/12/23 Timing: All Day
Promoter: Scaffolding Services Contractor: Scaffolding Services
Bus Routes Affected: Cycle Access: Yes

VALE - ROUTE DE ST MAGLOIRE ( RUE DE DESSOUS to LA LANDE )
Description: service alteration
Start date: Monday, 27/11/23 End date: Monday, 04/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DE DESSOUS
Description: Network upgrade (duct installations)
Start date: Monday, 06/11/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

VALE - RUE DE L`EPINE ( DEHUS LANE to RUE DU CHARDRONNET )
Description: Work starting 06:00 PM on Fri 31 Mar 23 and finishing 05:00 PM on Fri 15 Dec 23 - Safety reasons pending structural investigations
Start date: Friday, 31/03/23 End date: Friday, 15/12/23 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks and Events) Contractor: Traffic and Highway Services (Roadworks and Events)
Bus Routes Affected: Cycle Access: Yes

VALE - RUE DE L'EPINE ( DEHUS LANE to RUE DU CHARDRONNET )
Description: Work starting 07:00 AM on Thu 01 Jun 23 and finishing 11:59 PM on Sat 30 Dec 23 - Investigations
Start date: Thursday, 01/06/23 End date: Saturday, 30/12/23 Timing: All Day
Promoter: Traffic and Highway Services (Roadworks and Events) Contractor: Traffic and Highway Services (Roadworks and Events)
Bus Routes Affected: Cycle Access: Yes

VALE - SOUS LES HOUGUES
Description: Work starting 08:00 AM on Tue 28 Nov 23 and finishing 05:00 PM on Fri 08 Dec 23 - Duct installation
Start date: Tuesday, 28/11/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

One Ways
ST. PETER PORT - BOSQ LANE
Description: Work starting 06:00 AM on Thu 28 Jul 22 and finishing 05:00 PM on Wed 31 Jan 24 - Scaffolding for internal building reconstruction; Property: Royal Terrace; Purpose: Other (see Details)
Start date: Thursday, 28/07/22 End date: Wednesday, 31/01/24 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Yes

Signals
No current major delays due to signals

Starting - next 7 days
Closures
CASTEL - ROUTE DE COBO ( LE DOUIT BOUDIN to RUE DE BOUVERIE )
Description: service alteration
Start date: Tuesday, 05/12/23 End date: Thursday, 07/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 41 Cycle Access: Dismount past works

CASTEL - RUE DU GELE ( RUETTE DU ROCHER to VAZON ROAD )
Description: Work starting 08:00 AM on Wed 06 Dec 23 and finishing 05:00 PM on Fri 08 Dec 23 - New chamber and duct for new connection
Start date: Wednesday, 06/12/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: 60, 61, N2 Cycle Access: Dismount past works

CASTEL - RUE DU GELE; RUETTE DU ROCHER to VAZON ROAD ( RUETTE DU ROCHER to VAZON ROAD )
Description: CCTV Investigation
Start date: Wednesday, 06/12/23 End date: Wednesday, 06/12/23 Timing: All Day
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 60, 61, N2 Cycle Access: Yes

FOREST - LA RUE DES FOSSES ( RUE DU MANOIR to RUE DES REINES )
Description: Daily `self sign` closures for cable splicing 8am - 4pm
Start date: Monday, 04/12/23 End date: Wednesday, 06/12/23 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LA VASSALERIE ( ROUTE DE ST. ANDRE to MOURANTS ROAD )
Description: Emergency Tree Surgery Works
Start date: Thursday, 07/12/23 End date: Thursday, 07/12/23 Timing: Between AM and PM Peaks
Promoter: Arborcraft Ltd Contractor: Arborcraft Ltd
Bus Routes Affected: Cycle Access: Dismount past works

ST. ANDREW - LES MAUXMARQUIS (ROUTE DE ST. ANDRE)
Description: Work starting 07:00 AM on Wed 06 Dec 23 and finishing 06:00 AM on Mon 11 Dec 23 - Laying 33kv cable for PEH upgrade
Start date: Wednesday, 06/12/23 End date: Monday, 11/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Guernsey Electricity
Bus Routes Affected: P2, 60, 61, 71 Cycle Access: Dismount past works

ST. MARTIN - LA BOUVEE
Description: Chamber and duct installations
Start date: Wednesday, 06/12/23 End date: Friday, 15/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. MARTIN - St Martins Christmas Market ( LONGUE RUE to LA GRANDE RUE )
Description: St Martins Christmas Market
Start date: Monday, 04/12/23 End date: Monday, 04/12/23 Timing: Between AM and PM Peaks
Promoter: Constables of St Martin Contractor: N/A
Bus Routes Affected: 81, 91, 92, 93, 94, 95, N3 Cycle Access: Dismount past works

ST. PETER PORT - CROUTES HAVILLAND ( FORT ROAD to DAMOUETTES LANE )
Description: Work starting 07:00 AM on Mon 04 Dec 23 and finishing 04:00 PM on Fri 15 Dec 23 - Road resurfacing
Start date: Monday, 04/12/23 End date: Friday, 15/12/23 Timing: All Day
Promoter: Traffic and Highway Services (Capital Works) Contractor: States Works (Patching)
Bus Routes Affected: Cycle Access: Restricted: walk through the site

ST. PETER PORT - FORT ROAD
Description: CCTV Camera Clean
Start date: Monday, 04/12/23 End date: Wednesday, 06/12/23 Timing: After PM Peak
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 91, 92, 93, 94, 95, N3 Cycle Access: Yes

ST. PETER PORT - LE BOUET ( ROUGE RUE to ELIZABETH AVENUE )
Description: service alteration
Start date: Monday, 04/12/23 End date: Thursday, 07/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - LE BOUET; ROUGE RUE to ELIZABETH AVENUE ( ROUGE RUE to ELIZABETH AVENUE )
Description: replace streetlight
Start date: Wednesday, 06/12/23 End date: Thursday, 07/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: 31, 32 Cycle Access: Dismount past works

ST. PETER PORT - LES AMBALLES ( PIETTE ROAD to LES COTILS )
Description: service alteration
Start date: Wednesday, 06/12/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES ECHELONS ( SOUTH ESPLANADE to SOUTH ESPLANADE )
Description: Gutter Cleaning
Start date: Sunday, 10/12/23 End date: Sunday, 10/12/23 Timing: Between AM and PM Peaks
Promoter: q3 services Contractor: q3 services
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - LES OZOUETS ROAD ( LES BAISSIERES to SKINS LANE )
Description: Work starting 08:00 AM and finishing 04:00 PM - Tree surgery works
Start date: Monday, 04/12/23 End date: Monday, 04/12/23 Timing: Between AM and PM Peaks
Promoter: Arbology Contractor: Arbology
Bus Routes Affected: 51, 52 Cycle Access: Dismount past works

ST. PETER PORT - NORTH ESPLANADE
Description: Crane lift for scaffold build
Start date: Sunday, 10/12/23 End date: Sunday, 10/12/23 Timing: All Day
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: 11, 12, 13, 21, 31, 32, 41, 42, 51, 52, 60, 61, 71, 81, 92, N1, N2 Cycle Access: Yes

ST. PETER PORT - PARIS STREET ( NEW PARIS ROAD to ST. GEORGE'S ESPLANADE )
Description: Dismantling Scaffolding
Start date: Wednesday, 06/12/23 End date: Wednesday, 06/12/23 Timing: Between AM and PM Peaks
Promoter: Access Scaffolding Contractor: Access Scaffolding
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - St Peter Port Constables - Carol Service ( RUE DU MANOIR to HIGH STREET )
Description: St Peter Port Constables - Carol Service
Start date: Thursday, 07/12/23 End date: Thursday, 07/12/23 Timing: After PM Peak
Promoter: Constables of St Peter Port Contractor: N/A
Bus Routes Affected: Cycle Access: Dismount past works

ST. PETER PORT - UPLAND ROAD
Description: Work starting 09:00 AM on Mon 04 Dec 23 and finishing 05:00 PM on Tue 05 Dec 23 - Cable pull from the bottom of Candie road to upland business Centre.
Start date: Monday, 04/12/23 End date: Tuesday, 05/12/23 Timing: All Day
Promoter: JT Guernsey Contractor: JT Guernsey
Bus Routes Affected: Cycle Access: Yes, in direction of one-way

ST. PIERRE DU BOIS - RUE DE LA POMARE ( RUE DES SALINES to RUE DE LA CACHE )
Description: service alteration
Start date: Monday, 04/12/23 End date: Wednesday, 06/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE LA POMARE ( RUE DES SALINES to RUE DE LA CACHE )
Description: Replace chamber cover and clear blocked duct
Start date: Wednesday, 06/12/23 End date: Friday, 08/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Dismount past works

ST. PIERRE DU BOIS - RUE DE QUANTERAINE ( RUE DU BORDAGE to ROUTE DES SAGES )
Description: Low voltage cabling upgrade
Start date: Monday, 04/12/23 End date: Wednesday, 13/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

ST. SAMPSON - HALF WAY JUNCTION
Description: Stream Cleaning
Start date: Sunday, 10/12/23 End date: Sunday, 10/12/23 Timing: Between AM and PM Peaks
Promoter: Guernsey Water (Wastewater) Contractor: Guernsey Water (Wastewater)
Bus Routes Affected: 21, 91 Cycle Access: No

ST. SAVIOUR - Autism Guernsey - Winter Wonderland
Description: Autism Guernsey - Winter Wonderland
Start date: Wednesday, 06/12/23 End date: Thursday, 07/12/23 Timing: All Day
Promoter: Autism Guernsey Contractor: N/A
Bus Routes Affected: 71 Cycle Access: Yes, in direction of one-way

ST. SAVIOUR - LE FRIE BATON ROAD ( RUE DE LA CROIX CREVE COEUR to RUE DU PRE BOURDON )
Description: service alteration
Start date: Monday, 04/12/23 End date: Wednesday, 06/12/23 Timing: All Day
Promoter: Guernsey Electricity Contractor: Trant
Bus Routes Affected: Cycle Access: Dismount past works

TORTEVAL - LA RUE DE LA VALLEE ( RUE DE LA VILTOLE to RUE DU HUREL )
Description: Household Removal
Start date: Tuesday, 05/12/23 End date: Wednesday, 06/12/23 Timing: Between AM and PM Peaks
Promoter: R and R Removals Contractor: R and R Removals
Bus Routes Affected: Cycle Access: Yes

TORTEVAL - RUE DE LA VARDE ( PEZERIES to RUE DU PORTELET )
Description: Work starting 08:00 AM and finishing 05:00 PM daily between Mon 04 Dec 23 and Thu 07 Dec 23 - Tree surgery works
Start date: Monday, 04/12/23 End date: Thursday, 07/12/23 Timing: Between AM and PM Peaks
Promoter: Guernsey Tree Service Ltd Contractor: Guernsey Tree Service Ltd
Bus Routes Affected: Cycle Access: Dismount past works

VALE - LA ROUTE DU PICQUEREL
Description: Install new utility services
Start date: Monday, 04/12/23 End date: Monday, 18/12/23 Timing: All Day
Promoter: Geomarine Contractor: Geomarine
Bus Routes Affected: 31, 32, 91, 92 Cycle Access: Dismount past works

One Ways
No future major delays due to one ways
Signals
ST. MARTIN - ROUTE DE LA FORET; LA ROUTE DES CORNUS to LA RUETTE ( LA ROUTE DES CORNUS to LA RUETTE )
Description: CBT installations and cable splicing
Start date: Monday, 04/12/23 End date: Thursday, 07/12/23 Timing: Between AM and PM Peaks
Promoter: Sure Guernsey Contractor: Sure Guernsey
Bus Routes Affected: Cycle Access: Yes

ST. SAMPSON - BULWER AVENUE; LONGUE HOUGUE LANE to RUE DOREY ( LONGUE HOUGUE LANE to RUE DOREY )
Description: Work starting 09:00 AM on Mon 04 Dec 23 and finishing 05:00 PM on Tue 05 Dec 23 - Replace noisy frame and cover
Start date: Monday, 04/12/23 End date: Tuesday, 05/12/23 Timing: All Day
Promoter: Sure Guernsey Contractor: Geomarine
Bus Routes Affected: Cycle Access: Yes